Maglev Wind Power Solar Wind Powered Street Lights

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
2000 units / month set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

 

1. Structure of  Maglev Wind Power Solar Wind Powered Street Lights

Do you want to benefits from Maglev Wind Generator ,PV Hybrid Power Lamp System?

Our maglev wind generator has 3 models, 200W, 300W, 400W for lamp application system.

 For the lamp system power supplying renewable energy, Generally the configuration as below:

 

Maglev wind generator : 300W, 24V 1 sets

Solar Panel : 120W,24V 2 pcs

Camera : 50W,24V 1 pcs for roadway ,and 25W 24V 1 pcs for the pavement.

Tower : 7.2 m

Gel Batteries : 200AH, 2 pcs

 

2. Main Features of Maglev Wind Power Solar Wind Powered Street Lights

1.     Startup at low wind speed of 1m/s

2.     Higher efficiency compared to traditional HAWT

3.     Works even in turbulence

4.     Visually pleasing appearance

5.     Turbine construction is resistant to gale 60m/s (132MPH)

6.     Robustness and adaptation to all possible environmental conditions thanks to material of aluminum alloy or stainless steel

7.     Life span: at least 20 years

 

3. Maglev Wind Power Solar Wind Powered Street Lights Images

 

Maglev Wind Power Solar Wind Powered Street Lights

 

.

 

4. Maglev Wind Power Solar Wind Powered Street Lights Specification:

 

 

Maglev wind generator

 

TypeCXF200CXF300CXF600CXF1000CXF3000
Rated Power200W300W600W1000W3000W
Size(Height / Diameter)1035/1150mm1090/1240mm1320/1540mm2200/2400mm4200/4570mm
Turbine Weight22.5KG31KG49KG180KG715KG
Blades MaterialAluminum alloyAluminum alloyaluminum alloyaluminum alloyaluminum alloy
Blades Qty.33333

Start-up

wind speed

1m/s1.3m/s1.3m/s1.5m/s1.5m/s

Cut in

wind speed

2m/s3m/s3m/s5m/s, 3.5m/s3.5m/s
Rated Wind Speed13m/s12m/s13m/s13m/s13m/s
Cut out Wind Speed16m/s15m/s15m/s15m/s15m/s
Survival Wind Speed60m/s65m/s65m/s60m/s60m/s
Generator TypeAC,3 phasesAC,3 phasesAC,3 phasesAC,3 phasesAC,3 phases
Controller output voltageDC12VDC24V/12VDC24V/12V/48VDC48V/24VDC48/96V
Controller output current<12Amp<20Amp<30Amp<50Amp<130Amp
Controller braking system

3-Phase /short circuit protection/ NFB/

Manual break or automatic brake optional

Ambient Temperature-30~50 ℃-40~50 ℃-40~50 ℃-40~50 ℃

-40~50 ℃

 

 

Rated power

Approx. 300Wh at 13 m/s (26 mph)

Swept Area

0.8 m2

Height / Diameter

1.23/1.09 m

Weight

27 kg

Shipping Dimensions

1160 x 520 x 790 mm 56 kg

Startup Wind Speed

1 m/s (2.6 mph)

Voltage

12, and 24 V AC

Turbine Controller

Smart Wind $ solar hybrid controller

Body

Permanent mold cast aluminum

Blades

(7) Injection-molded aluminum

Alternator

Permanent maglev generator

Overspeed Protection

3 phases short-circuit braking control

Survival Wind Speed

65m/s

Mount

Inner diameter 80MM 140mm outer diameter

Wind Speed Operating Range

1-15 m/s (8-49 mph)

Optimum Wind Speed Range (RPM)

8-10 m/s ( 750-800RPM)

 

5. FAQ

 

Q1: Why we use wind power for electricity generation? 

Re:Wind speeds are often low in periods (summer, eventually) when the sun resources are at their best. On the other hand, the wind is often stronger in seasons (the winter, in many cases…) when there are less sun resources.

Even during the same day, in many regions worldwide or in some periods of the year, there are different and opposite patterns in terms of wind and solar resources. And those different patterns can make the hybrid systems the best option in electricity production.

 

Q2: How is the installation of this wind turbine?

• Easy Installation: System can be assembled within one hour

• No welding

• Single or multiple unit connection for bigger power production

• Easy connection with PV systems



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Ask the expert about the design of the power system diagram, 6kV side of the electrical equipment how to supply
For 35/6KV step-down stationEach line with the 6/0.4KV transformer, or 6KV equipment (such as 6KV synchronous motor), are the load of the stationSo, there are 6KV devices, single occupancy 6KV bus on a certain line can be
Q:Is the installation of railway communication, signal and power related to mechanical and electrical engineering
3, in fact, including the power of the two professional: power and electrification. Including contact network infrastructure, post, wire rack, remote control, lightning protection system, station lighting intelligent control etc..Belong to the scope of the installation should be the station (communication station) equipment into the test, the basis of processing and installation, equipment installation, commissioning of the single body, the electrical subsystem Unicom debugging, the whole system of professional debugging unicom. And other railway professional with the commissioning test, etc..
Q:The relationship between primary equipment and two equipment in power system
The two device is a device for the control, regulation, protection and monitoring of a device, which comprises a control device, a relay protection and automatic device, a measuring instrument, a signal device, etc.. The two device obtains the electrical connection with the primary device through a voltage transformer and a current transformer.
Q:What are the necessary equipment for power line project?
It must have a climbing tool, such as irons, safety belts, safety helmet; and lifting equipment, such as cranes, hydraulic lift truck, pulley, winch, pole and so on; there must be bearing equipment, such as various tensioners, hand gourd, line cards, traction machine, tension machine;
Q:What are the technical measures to ensure the safety of the power line equipment?
1 blackout.2 electrical inspection.3 grounding wire.4 use personal security line.
Q:What is the installation equipment of the transformer on the power installation project
Installation of lightning arresterMost of the external factors that affect the operation of distribution transformers are from lightning accidents. Therefore, the transformer equipped with lightning protection devices, should be used in the synthesis of metal oxide arrester without gap insulation, the power frequency voltage withstand capability, good sealing, protection characteristics.
Q:I would like to open a company on the construction of power equipment, what needs to be prepared?
First, the qualification of electric power project construction. Divided into one to four, respectively, by the Ministry of housing, the provincial housing department, the Municipal Housing Construction Bureau and County Housing Construction Bureau approval. Construction quality is also subdivided into general contracting, professional construction contract, etc.. The project general contracting, according to whether the design, supervision, equipment procurement and other business content, but also can be subdivided.
Q:Power equipment Market Overview
The first quarter of 2013, China's economic growth rate has declined, but overall still maintained at a high level, especially the power equipment of power transmission equipment and electrical equipment demand remains steady growth, thereby stimulating imports of the rapid growth of the industry; at the same time, the world economy has been warmer, the international power equipment market demand a modest recovery, I pull the power equipment China's manufacturing exports continued to grow. In the import and export growth driven by two, the first quarter of China's total import and export of electric power equipment manufacturing industry rebounded significantly.
Q:Power equipment are used, can help to divide some of the details
Power equipment classification:1 the sequence of electric power in power system can be divided intoPower generating equipment, power generation equipment, power transmission equipment and electric equipment2 the main role of the power system can be divided intoPrimary equipment, two equipment
Q:What is the specific content of power engineering commissioning
Power engineering commissioning requirements are as follows:1. Major in electrical engineering, college degree or above;2, with the same type of work more than three years experience in power engineering commissioning;3, skilled office software;4, have a certain project commissioning experience and on-site guidance engineering installation and commissioning;5. Able to travel frequently.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range