Luffing Tower Crane TCD6029 16T manufacturer

Ref Price:
$40,000.00 - 200,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Quick Details of TCD6029  Luffing Tower Crane


Feature: Tower Crane                          

Condition: New                                          

Max.Lifting Load: 16T

Place of Origin: China(Mainland)          

Model Number: TCD6029       

 

Packaging & Delivery of TCD6029  Luffing Tower Crane


Packaging Detail: Nude package          

Delivery Detail: 25-30days


Images of TCD6029  Luffing Tower Crane

 

 

FAQ of TCD6029  Luffing Tower Crane

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 

To Lead The Revoluation of International Trade


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:There is no CAD map attached to embedded parts of tower crane?
4810 as long as 16. The middle spacing is different. It's almost impossible to install
Q:What is the difference between a jack up tower crane and a fixed tower crane?
The fixed tower crane means lifting the foundation of the tower body on the foundation or structure through the connecting piece.
Q:What tower cranes are used on the 30 storey house?
The 30 storey building on the height of about 100 meters to 120 meters, plus 2 to 3 layers of basement, the tower crane must set the height of 110 meters to 140 meters, if the single building is less than 60 thousand square meters of building square meters, as the total number of square meters, using a two QTZ63 type tower crane is enough,
Q:Method for operating tower crane
2.21, drivers must pass the escalator up and down, up and down the escalator, hand tools are prohibited items.2.22 do not drop any objects from tower cranes or defecate.2.23 winter in tower crane operating room heating, should be taken to prevent electric shock and fire measures.2.24 any tower crane with an elevator must comply with the instructions in the elevator manual. No overloading or violation of the operating procedures.2.25 multi machine operation, should avoid two or more than two tower cranes overlap in the radius of rotation. Special circumstances, need to overlap operations, must be safe distance between the vertical arm to ensure the safe distance and the lifting of materials, and have reliable safety measures approved by the competent technical leadership before construction.2.26 jib cranes in heavy lifting off the ground after lifting, rotating and walking three actions can be done at the same time, but the amplitude only alone, strictly with variable load. A crane that allows variable amplitude loading shall not vary at full load or near full load.2.27 lifting hoist is not installed in the rotating part of the crane, lifting operations may not continue in one direction continuous rotation.2.28 a crane with a mechanical torque limiter must adjust the tonnage indicator of the overload limit device according to the radius of gyration and the rated load at that radius.2.29 bend rail subgrade must comply with the provisions of the crane should turn on the outer rail surface of the sand, rail, rail and wings painted with grease. The counterweight box shall be turned to the direction of the outward turn. It is strictly prohibited to do lifting or turning on heavy roads.
Q:Emergency treatment of interrupted electricity during lifting of tower crane
When the power supply fails, you should first remove the things that are stuck in the gear!
Q:Which kind is better, gantry crane or tower crane?
Each has advantages, the use of different conditions, the use of different cranes, tower cranes can not move, but the lifting height can be very high, the door machine has tracks can be vertical and horizontal movements, lifting height, tower crane is not high.
Q:What kind of bodies are tower cranes made of?
First, the working mechanism of tower cranesThe working mechanism of tower crane is usually composed of lifting mechanism, luffing mechanism, slewing mechanism, hydraulic jacking mechanism and running mechanism.The hoisting mechanism to realize heavy vertical up and down movement; luffing mechanism and slewing mechanism to achieve weight moving in two horizontal directions; hydraulic lifting mechanism of standard section, increase or decrease, so as to increase or decrease the tower; range of weights can achieve walking mechanism in tower crane and force of arbitrary space motion.
Q:What are the safety devices in a tower crane?
Moment limiting torqueWeight limit; weight LimitedThe car looks for car restrictions limitFrom the ceiling to prevent hoistingThe slewing limit is limited to Slewing
Q:How many meters does the tower crane installation height require expert proof?
The installation, disassembly and jacking of tower cranes must be carried out by experts
Q:Ask about the lift and transportation of the jack up tower crane
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range