Luffing Tower Crane TCD5032 Max Load 10T

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Quick Details


Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 10T

Place of Origin: China(Mainland)          Brand Name: CMAX                              Model Number: TCD5032       

 

Packaging & Delivery

Packaging Detail: Nude package          Delivery Detail: 25-30days


FAQ

 

Q: What is the difference between CNBM and CMAX?

A: CNBM stands for China National Building Materials (Group) Corporation, which is established in 1984, is the largest state-owned group corporation of building material & machinery with a total asset of 15 billion USD and a staff of 100000.

CMAX is the brand name of CNBM Group’s construction products, C stands for China and Max stands for Maximum.

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, CNBM could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 

To Lead The Revoluation of International Trade

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:In ultimate spiderman pc: how can i defeat Ryno in the mission with the wet cement and the crane???
i have it for console but what you do with that is this. When he does a big slam after chasing you make sure he does it in the cement area, then go to the crane and it cutscenes to you hurting him. Then you will follow him some more to a car shop. He throws cars at you, when he does a big slam sparks from his back disappear (they were caused by the crane) jump on his back and keep smashing him till he falls on his back, then just repeat that and watch a cutscene of his defeat.
Q:What is the difference between Fujian White Crane Kung Fu and Wing Chun Kung Fu?
Crane Style Kung Fu
Q:How do they get large cranes on top of buildings?
Most cranes use hydraulic lift. But lets say they are building a sky scraper the size of the dubai tower. They set a hydraulic lift crane to a certain point and lift components for another crane up. They then use that crane based at ground level to lift up parts. the other crane is based in the elevator shaft and they can set that crane up as high as they need.
Q:how would you describe crane-man? Use specific examples from the novel to support your answer?
wise, caring, lighthearted courageous survivor Assuming you've read the book , you'll need to find examples to prove these characteristics.
Q:HOW TO BUILD A WORKING CRANE?
you are totally just trying to avoid doing this work by yourself. anybody with two eyes can just look up crane on google and learn how it works. they are super simple just go to the library or something. or better yet go look at a real crane.
Q:How to crane fly out of your room?
The crane fly might look a little scary, but they really are harmless. They do not bite people. But you don' t want one in your bedroom. Just open the window and get a towel and chase him out. You may have to get a ladder because he may want to go to the ceiling.
Q:How many meters does the tower crane installation height require expert proof?
The installation, disassembly and jacking of tower cranes must be carried out by experts
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:how does a skyscraper crane use moments ?
OK... So what has your homework actually asked you to explain? Can you post the question...? There are moment forces going through a crane, is the aim of the homework simply for you to explain what a moment force is using a specific example ? A crane can be thought of in simple terms as a cantilever, ie one supported end and one free end, the lever arm force as it is sometimes referred to in schools is actually the moment force i.e. the moment for a crane with a boom L=40m long lifting a load of P=10kN would beP*L = 10*40 = 400 kNm, this is ignoring the self weight of the boom, if the boom weighed W=1.5kN/m (thats per meter, not to be confused with kNm which is kilo newton meters) then the moment generated by the self weight would be (WL^2)/2 = (1.5*40^2)/2 = 1200kNm so the total moment would be 1600kNm, so just remember for a point load the moment is force * distance from support ( in cantilevers) hope this helps... :)
Q:Have you heard of Crane Coffee?
It won't expand if Starbucks have their way. They have driven all their competiton out of business. I hope Crane Coffee can survive.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range