Luffing Tower Crane Qualified China Supplier

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Tower Crane Description


Feature: Tower Crane                          Condition: New                               Application: Construction           

Tip Load:8T                                           Span: 60m                                      Certification: CE,ISO                            Place of Origin: China(Mainland)          Model Number: TCD6029         

  

Packaging & Delivery of Tower Crane


Packaging Detail: Nude package          Delivery Detail: 25-30days


Tower Crane Specifiction

 

Luffing Tower Crane Qualified China Supplier

Luffing Tower Crane Qualified China Supplier


FAQ of Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal tower crane with cat head, internal climbing tower crane, top less tower crane and luffing tower crane. 


Q: What kind of steel used for tower crane?

 A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.


Q: Your tower crane is similar to Potain or Liebherr type? 

A: We could develop any type of tower crane as per clients’ requirements if the clear information is provided. Originally, our tower crane design is based on Liebherr; but now, we not only introduced Potain design; but also developed special tower crane according to the market needs such as TC5013A with panel mast section. In addition, we also produce some models same as Potain original model, such as F0/23B, H3/36B and etc. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for jack up and plus section of jack up tower crane?
When lifting, a standard section is hoisted on the imported beam or introduced platform. Then open the pins or bolts connecting the standard section with the slewing support. Start the oil pump, so that the cage in the standard section of the outward sliding, until the release of a standard section position, and then imported beam or imported platform on the standard section into the connection. This completes a process.
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:How much should the verticality of a tower crane be controlled? Thank you
No, the wind speed is not more than 3m/s, the independent state tower (or attached state highest attachment point above the tower axis) lateral verticality tolerance is 4/1000, the highest tower axis perpendicularity allowed attachment line below the point of difference is 2/1000.
Q:Equipment safety of tower crane
Some use units over profit, not pay attention to safety, small horse cart, overloading seriously, tower crane accident is one of the main source of high incidence. Some manufacturers in order to meet the construction requirements of the enterprise, expand sales, to occupy the market, will be independent of height increase, the boom will be lengthened to increase the tower coverage, this is bound to reduce the stability of tower crane, reduce the rated lifting weight, increased insecurity. There are some private and unauthorized modification of the tower crane tower crane in the assembly, this part of the tower crane for a long time in the second-hand purchase price is cheap, not willing to invest in maintenance, and frequent failure, which should arouse our attention, we should seek truth from facts, according to local conditions, to solicit the views of all parties on the basis of the introduction of relevant the supporting policies to solve this problem. By strengthening the safety management of several aspects of tower crane, it can effectively prevent all kinds of accidents in the process of tower crane use, and play a preventive role. Practice shows that as long as the construction enterprises, factories, construction administrative departments, in accordance with the tower crane detection institutions can each link to do, to strengthen the safety management of the tower crane, can effectively control the incidence of major accident of crane.
Q:Brief introduction of ten no hanging criterion for tower crane operation
8, oxygen acetylene generator with explosive materials are not allowed to hang; 9, mechanical safety device failure or sick when not hanging; 10, bad weather, more than six winds not hanging.
Q:Who invented the tower crane, please?
In 1923, a prototype of modern tower crane was built. The first relatively complete modern tower crane appeared in the same year. Our tower crane started from Shanghai in 1950.
Q:Tower crane (tower crane)
Fixed tower crane, mobile tower crane, flat tower crane, movable arm tower crane
Q:In the case of tower crane operation, the operation should be stopped
In case of six or more gales, heavy rain, heavy fog, heavy snow or tower crane, you should stop working
Q:What is the difference between a crane and a crane in a tower crane?
Informal: hoisting signal worker: refers to the signal flag!Cable man: rope!
Q:What is the difference between a tower crane and a jack up tower crane?
The jack up tower crane is a tower crane (that is an internal climbing tower crane) that is added and reduced by its own special device, namely, the standard section of the tower (that is, the attached tower crane) or the whole climbing tower itself.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range