Luffing jib used tower cranes for sale in dubai moving tower crane price

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our tower crane:

1.Original technology Creater and Leader of Flat-Top Tower Crane in the world
2.Modular system invented Linden Comansa Group
3.World-wide exchangeable with Linden Comansa Flat-top Tower Crane
4.Intelligent  inverter , not only knows the speed but the loads
5.Potential meter control
6.Close loop control
7.Position mode
8.RCV Control
9.Eddy current brake
10.Soft start and stop
11.Automatic gear change
12. High efficiency, reliable, Lower energy cost


Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Model QTC50
Tip load capacity (T)1
Independent Height(M)41
Max.Lifting Capacity(T)6
Wall-attached Frame6
Main Material 


Square Steel Tube

Standard Mast Section Dimension1.84*1.84*2.5
Hoisting Speed(m/min)80/40/10
Mini. Stabilizing Falling Speed(m/min)5
Slewing Speed (r/min)0-0.62
Traveling Speed(m/min)40/20
Climbing Speed(m/min)0.6
Motor Total Power (KW)38.3
Complete Machine Total WeightIndependent Structure Weight (T)  36.8
Counter Weight(T) 14.85


Luffing jib used tower cranes for sale in dubai moving tower crane price

Luffing jib used tower cranes for sale in dubai moving tower crane price

Tower crane originated from Western Europe.Movable arm is installed on the top of the rotation of the tall tower crane.Work space is large, it is mainly used for building construction materials in the vertical and horizontal transportation and installation of building components.By the metal structure, working mechanism and electrical system of three parts.Metal structure including the tower, movable arm and base, etc.Working organs are lifting, luffing, turning and walking four parts.Electrical system including motor, controller, power distribution cabinets, connection circuit, signal and lighting devices, etc.Tower crane derrick form horizontal and compressive bar type two kinds.Derrick is horizontal, trolley along the horizontal movable arm luffing operation, range of motion balance, the movable arm is longer, but the weight of movable arm is bigger.Luffing mechanism of movable arm type for compressive bar, drag the actuating arm luffing fell back and range of motion than horizontal smooth, but its weight is smaller.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:what is behind the story " thousand paper cranes" ?
I'm not sure what's behind it.. but if you fold a thousand paper cranes, you can make a wish..
Q:Is there a crane big enough to lift Hillary off the yoga matt when she has finished her yoga?
You wouldn't need a crane, all you'd need is a hershey's bar and she'd wattle off the yoga mat. Or, you can present her with facts about the destruction of her e-mail server, the fact that she allowed innocent people in Iraq and Syria to die, or the fact that she hit the reset button with Russia, and she'll RUN AWAY from the yoga mat.
Q:How many meters of cranes should be in accordance with the anemometer?
In accordance with national regulations, outdoor cranes need to install anemometer.Specific provisions"GB6067.1-2010 crane safety regulations", 9.6.1 anemometer and wind speed alarm9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be located upwind of the upper part of the crane. high speed crane for outdoor operation should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.
Q:If Fujian White Crane Kung Fu influenced Goju-ryu and Uechi-ryu than what Kung Fu style influenced Shotokan?
Q:Are tower cranes the same as tower cranes?
Tomato, you tomato, potatoes, you potatoTalent exchange of tower crane and tower crane
Q:Dawkings' Boeing crane. How did it arise, and continue to work?
Bit by bit you may come to realise that complexity out of simplicity is much easier to comprehend than complexity from nowhere. The crane idea is from Daniel Dennet I think, and the boeing being assembled by chance is more or less what happened only bit by bit through evolution and natural selection. God is the complexity from nowhere to which I refer. Self-complete creator? did he make himself?
Q:I wish to design a crane mounted truck of 2Ton, what all the automobile parts will suitable to design the truc?
You probably meant a truck-mounted crane. There are industries offering ready-made solutions that work. Have you ever designed a truck or a crane before? It's a challenging engineering task and it can't be improvised. Besides, whatever you design and build will have to undergo extensive testing before being authorized to operate on public roads. The solution would cost more than anyone would care to pay for it. Consider buying a used rig instead.
Q:Who is Seneca Crane in The Hunger Games?
I'm sorry I saw this now, but I can answer it if u still don't know. Seneca crane was a head game maker who allowed there to be 2 victors cause he , according to pres. Snow felt sentimental, well he was killed because of that , and katniss did that As an act of defiance ...
Q:1000 paper cranes for japan?
I think it's better to donate money through help Japan on Yahoo! top page or something. Sorry. But paper cranes are not practical help for those who are suffering.
Well but I couldn't find any reference to them being called waddle cranes. While the W on a key board is close to the S, you'd have to miss the TR for waddle to be misspelling of straddle, so I have no idea, sorry.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range