Low Cost Prefab House

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
20000㎡ m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

This product belongs to Ligth Steel Frame Structure.

This structure is formed by the dense light steel studs and compound envelop and  with all kinds of supprior physical qualities.

Advantages:

1. Flexible combination
2. Easy transportation
3. Fast construction
4. Cost saving
5. Removable & recycle

6. Thermal Insulation
7. Seismic and wind resistance
8. Roof Load-bearing

Packing:

light steel packing: light gauge steel in bulk, decorate panel material in pallet, other fittings all in boxes, loaded into 40' GP and 20' GP on container.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Light steel keel wall and how to connect the external walls of the glass window
In the cut off, with 20 * 20 or 25 * 25 galvanized iron pipe welded into the design of the size of the box, in the ground, the top of the fixed between the fixed door on both sides of the vertical frame, and then the height of the door plus the same box , Welding beam fixed to the spring on the shaft. This is to consider the glass door in the abnormal switch will have a huge lateral force, resulting in the door axis prone to displacement.
Q:Where do you install cement boards on flooring?
When you got plywood floor or any wood floor and you want install tiles, you have first install cement boards with liquid nail and screws.
Q:tile floor patterns?
If your existing tile is tight to the floor and in good shape (no cracks, loose tile, loose grout) yes you can. You need to use a thin set with a very high latex content like TEC Superflex. Be sure that the existing tile and grout is perfectly clean and there are no sealers left on the grout. This is an industry accepted method.
Q:Want to open a small aluminum buckle board processing plant about how much money
Small aluminum gusset processing plant, you need to have a plant 100-300 square of the plant, part of the production workshop, part of the inventory, the other part can be used as a sample display room. The location of the traffic to facilitate the delivery of goods on it.
Q:What is the difference between ultrafine glass fiber cotton and centrifugal glass wool?
Centrifugal glass wool Glass wool is the glass in the molten state by centrifugal injection process of fiber spray coating thermosetting resin made of filamentous material, and then through the heat curing deep processing, can be made with a variety of uses of the series. It has many advantages such as flame retardant, non-toxic, corrosion-resistant, small bulk density, low thermal conductivity, strong chemical stability, low moisture absorption and good hydrophobicity.
Q:Bathroom aluminum door how to install
There are two kinds of toilet door installation method: Outer bag, door frame (door frame) on the outside of the wall; inner package, door frame (door frame line) inside the wall; 'wall' refers to the bathroom door Body (the general situation has a wall) Inner package: you can first affixed to the brick, the door frame lines can be partially covered due to the door side of the tile tricks do not homogeneous problem Outsourcing: 1, you can first affixed to the brick: according to paste the brick after the size of the door to the door, left and right to leave a certain gap (otherwise not into the fixed when you can play glass glue), to the first door There is a time difference) is paved when the need to master the size of the door, only big can not be small. 2, the door parts of the wall is not posted, the other can be posted: wait until the other large area paste, and then install the door, and then complete the rest. No matter what method, first installed after the door tiling, are a lot of inconvenience (such as to open the door construction, finished product protection) Above refers to the bathroom door for the finished door (factory custom) If the non-finished door (generally no box line), you can press the box after the shop and then install the door, but the package should pay attention to increase the height of the door, or when the door can not be installed, because the door is vertical Direction of the disassembly (note the location of the installation method)
Q:Hand knitted men's sweater, the general number of needles left shoulder
The shoulder width, yarn thickness, the needle is not the same.
Q:According to the standard set up double scaffolding scaffolding to the number of meters per square meter
Once the calculation is qualified, you can according to the vertical distance
Q:Kohler faucet on the top of the bubble where to sell
What kind of picture to show me
Q:Which is better for a 2-story house : radiant barrier roof or more attic insulation?
the best is more attic isolation so that the heat don't come directly to second floor.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Premium Related Products