Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


World famous engine,Strong power, low fuel consumption, low noise, reliable in performance. Single stage four components of torque converter and planetary power shift transmission ensure the soft operation, better economy and high work efficiency. Optimization design of cooling system effectively lowers the engine water temperature and hydraulic oil temperature, and reduces the fuel consumption.
Beauty and taste outline. Cab uses humanization design. Huge space and ample view ensure the driver’s safety operation and comfortable experience. Long wheelbase, increased weight, longer arm design, and higher discharge height improves the stability of the machine.
Low carbon alloy steel plate welding, solid and reliable, durable. Reinforced high drive axle, bearing capacity, and high reliability.




Min. turning radius (outer front wheel)(mm)6628
Bucket capacity(m3)4.0Horizontal pass radius (outer bucket)(mm)7599
Rated load (kg)5400Max. breakout force≥150.0
Max. traction force (by engine)(kN)≥150.0Max. gradeability30
Tipping load (kN)≥110.0Work cycle time≤11.5s


Length (bucket on ground)(mm)8436Bucket width(mm)3300
Height(mm)3382Wheel base(mm)2248
Width (outer wheel)(mm)2844Axle base(mm)3290
Max. dump height (-450)(mm)3500Operating weight(kg)17000
Corresponding dump distance (-450)(mm)1220

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I pretty much need help on this math problem!10 Points?
volume = 700*200*85 the rate of which the landfill is filled same amount as the volume 1 cu yd = 27 cu ft.
Q:Dozer\excavator work. How much $$ to dig a hole?
You would need to hire two machines to have4 flat verticle sides. A front end loader and a back hoe. I would take only one day and both usually are hired for $125 per hour with an 8 hour minimum. So your looking at $2,000. If you dont mind one side having a ramp to the front end loader can go in and out. Then you'll only need the one machine. $1,000. This time of year, find a pool builder. He's probably and slow, needs the work, and willing to negotiate.
Q:Komatsu PC series excavators -5, -6, -7, -8. Which year did they begin production?
This is the case at homeProduction began in November, -5:1995-6:1997 began in January-7:2002 began in September-8:2007 began in SeptemberabroadMay, -5:88November, -6:1992April, -7:2001September, -8:05
Q:Excavator theory
The basic structure and working principle of excavator:First, the overall structure of single bucket hydraulic excavatorThe overall structure of single bucket hydraulic excavator includes power unit, working device, slewing mechanism, control mechanism, transmission system, walking mechanism and auxiliary equipment, etc..The power unit, the main parts of the drive system, the slewing mechanism, the auxiliary equipment and the cab are all installed on the rotatable platform, which is usually called the upper turntable. Therefore, the single bucket hydraulic excavator can be summarized into three parts: working device, upper rotating platform and running mechanism.The excavator is through the diesel engine of the diesel oil chemical energy into mechanical energy, the hydraulic piston pump to convert mechanical energy into hydraulic energy, the hydraulic system of the hydraulic can be assigned to each actuator (hydraulic cylinder, rotary motor + reducer, walking motor + reducer), by the actuator to the hydraulic energy into the mechanical energy, realize the working device of rotary platform motion, rotary motion, the walking motion.
Q:Car chase possibly bullitt?
Q:How much are the first pilot pressure and the two pilot pressure of the excavator?!
The two pilot pressure is usually 10% of the pilot pressure, and the two pilot pressure is controlled by the handle button. A pilot pressure is required with the normal operation of the system is generally about 35kg, two pilot pressure used in special conditions, such as the bucket bucket must use to dig out from the stone soil and the mining stress exceeds the system overflow pressure 345KG system set in a mining buried in the earth stone, then open the two pilot system, the sum of the overflow pressure at that time as one and two times the pilot pressure is 380kg, the working pressure increased to complete this action.
Q:Was Piltdown Man still being taught in the 1970's as evidence for evolution?
No. It was under suspicion for a long time, even before it was debunked in 1953. By the 70s it was old news.
Q:Evans or Schliemann Which was a better Archeologist?
Evans is better.
Well, to become an environmental excavation first you have to be land. Oh, I think you mean excavator. Then you'd need excavation experience and excavation equipment (backhoes and such). You'd probably need certification of some kind. For government jobs (the most common) you'd probably need to bid on a project, and they take the best bid. Texas government sites should have specific information on this. Knowledge of soil types, environmental habitats, erosion control, etc. would be useful.
Q:Modern 305-7 excavator oil consumption per hour, how many liters oil full load?
Diesel engine can be estimated by specific fuel consumption, but to know the normal work of the power consumption, if this is full load work, you can press the nameplate power, generally 180 grams / horsepower * hours, about 0.2 liters / horsepower * hours.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range