Linear Steel bar Air Diffuser Ceiling Use and sidewall use

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
100 pc
Supply Capability:
999999 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specification of Air Diffuser


Supplying Air Diffusers 
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed 
-Powder Coated RAL 9010




HVAC aluminum air conditioner grille



Extruded Aluminum alloy (6063-T5)



Blades in 45°from aluminum profile or as customer’s requirements


Bar spacing

30mm as standard or as customer’s requirements



0.8mm, 1.0mm, 1.2mm, 1.5mm or according to the customers’ 


Surface Finish

Powder coated, Anodized , PVDF, Mill finish.



Width x Height, any sizes available


Powder for Finish

Environmental protection and non-toxic, and Color to keep 5 -10 years.



Refer to RAL colors swatch or customized colors available



Drawings designed according to the customers’ requirements


Payment terms

T/T, L/C, PYAPAL, etc.


Delivery time

Usual 15-20 work days for a 40GP container 


Package details

Bubble wrap + Cartons for FCL,  Bubble wrap + Cartons + Wood-box for 



Stainless steel security mesh, Aluminum security mesh



Fixing and adjustable installation


Usage of Air Diffuser


The grille is suitable for ceilling  sidewall, soffit or cill mounting and may be used for supply or extract applications. 

Typical installations include offices, shops, hotels and most commercial or industrial buildings.

Available as standard in white polyester powder coat finish. 

Other polyester powder  coat finishes are also available as an option.


Model Pictures of Air Diffuser


Linear Steel bar Air  Diffuser Ceiling Use and sidewall use

Linear Steel bar Air  Diffuser Ceiling Use and sidewall use

Linear Steel bar Air  Diffuser Ceiling Use and sidewall use

Linear Steel bar Air  Diffuser Ceiling Use and sidewall use

Linear Steel bar Air  Diffuser Ceiling Use and sidewall use

Linear Steel bar Air  Diffuser Ceiling Use and sidewall use

Production line

Linear Steel bar Air  Diffuser Ceiling Use and sidewall use

Linear Steel bar Air  Diffuser Ceiling Use and sidewall use

Technical Data of Diffuser:


rectangle air diffusers

metal frame ceiling diffuser

white metal color





1. Product name: air diffuser



2. Material: steel



3. Powder coated: standard color, RAL 9010/9016 



4. Damper with



5. reduce the flow resistance and noise.



6. The products are easy to install and clean.



7.  adapt to centrel air-conditioning systems.



8. other size/colors available.

Dimensions,colors,thickness, finished, disigns and other specification can be customized according to customers' request


FAQ of Air Diffuser:


1, What's size do u have for round type diffuser?

A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm


2, Do u still have other types ?

A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc


3, What's the most early delivery time?

A: Within 25 days for each 40'fcl


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the whole heat exchange fresh air ventilator?
Second, the new insulation decorative board is integrated through the production line, set insulation, waterproof, finishes and other functions in one, is to meet the current housing construction energy needs, improve the industrial and civil building exterior wall insulation level of the preferred material, but also on the existing Building energy-saving transformation of the preferred materials
Q:Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Not the ,,, mobile air conditioning inside the compressor, the winter heating also need the compressor, but also a ventilation pipe, charged heating Well?
Q:Home 2 air conditioning is the cooling of electricity or heating electricity? How much power is spent in hours
After learning that feel boring, to diverted it, brush point repair it. Architectural design institute will need to design equipment (that is, plumbing) design talent, that is, will generally participate in architectural design, the wages should be
Q:Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q:Air conditioning ventilation when the sound is a big reason
Buried plastic pipe under external load, the diameter of the vertical diameter deformation rate should be less than the allowable diameter of the pipe deformation rate The diameter of the allowable diameter of the pipe shall not be greater than 5% The diameter deformation rate of the pipe and the allowable diameter deformation rate are calculated as follows: ε ΔD / D0 × 100% [ε] ε0 / K where: εΔD pipe in the combined load (Mm) [ε] Permissible diameter Deformation rate ε0 Elastic diameter Deformation rate (%) of pipe, by the flattening of the diameter of the pipe diameter (mm) The test determines the K safety factor, generally desirable 15
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q:HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt
Q:Air conditioning machine work when the sound is too much reason
Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
Q:Air to water heater host and air conditioning host is not the same
Issued a test report, Detection can be used to pass, failed to use!
Q:Single cold air conditioning function can not change the cold and warm?
Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range