• linear air vent diffusers for air conditioning use System 1
  • linear air vent diffusers for air conditioning use System 2
  • linear air vent diffusers for air conditioning use System 3
  • linear air vent diffusers for air conditioning use System 4
  • linear air vent diffusers for air conditioning use System 5
  • linear air vent diffusers for air conditioning use System 6
linear air vent diffusers for air conditioning use

linear air vent diffusers for air conditioning use

Ref Price:
get latest price
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
999999 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification of Air Diffuser

 

Supplying Air Diffusers 
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed 
-Powder Coated RAL 9010/9016

  

Usage of Air Diffuser

 

The grille is suitable for ceilling  sidewall, soffit or cill mounting and may be used for supply or extract applications. 

Typical installations include offices, shops, hotels and most commercial or industrial buildings.

Available as standard in white polyester powder coat finish. 

Other polyester powder  coat finishes are also available as an option.

 

linear air vent diffusers for air conditioning use

linear air vent diffusers for air conditioning use

linear air vent diffusers for air conditioning use

linear air vent diffusers for air conditioning use

linear air vent diffusers for air conditioning use

linear air vent diffusers for air conditioning use

 

FAQ of Air Diffuser:

 

1, What's size do u have for round type diffuser?

A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm

 

2, Do u still have other types ?

A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc

 

3, What's the most early delivery time?

A: Within 25 days for each 40'fcl

 

Q:Do you have a brand name?
1, first talk about the warm is a system, all parts have manufacturers. 2, to warm the company is mainly the purchase of various manufacturers of products together to form a system and then sales, and some also with the installation. 3, so the warm sense of the system is really no brand. 4, if you want to impose a brand can only warm the company's name or the boiler brand. Just put some. 1, heat source: Viagra, Bosch, Fisemann. The The 2, the pipeline: Qiao Fu, Rui good, the United States Seoul ancient. The The 3 粻 笭 笭 笭 蕺 告 告 告..................... The 4, temperature control: Siemens. Man Rhee 5, insulation materials: green feathers, Corning,
Q:Do you have a good geothermal cleaner?
OKorder workers to warm the washing machine is very good operation, the Internet has a video operation. The specific operation steps are as follows: 1. Close the manifold main control valve and also open the sub-valve is also closed. 2. Place the drain on the side of the divider and install the quick connect. 3. The host pulse output, inlet pipe, water separator sewage pipe connected. 4. Check the various parts of the connection is not leaked open cleaning. Cleaning pipe Note: 1. The connection must be tightened to prevent leakage, must be inserted in the end of the tube, when the card must be broken to the end of the ring. 2. The drain end must be inserted into the sewer mouth to prevent contamination of the environment when it is discharged. 3. Before cleaning, be sure to ensure that every road to warm pipe without discount. 4. Cleaning should pay attention to the pump pressure to prevent the pipeline blockage pulse generator can not work properly, to stop the work analysis reasons. 5. The pulse generator found that there is leakage of water leakage phenomenon should stop working troubleshooting. 6. If you encounter the construction environment in the water source can be more distant piping connection.
Q:Air source heat pump how much money
Different regions of the different vendors may have differences in the price, you can compare a few more, it is recommended to the regular store or large chain stores to understand.
Q:Radiator parallel system how to take pictures
Radiator in parallel 1: radiator parallel 2:
Q:How to choose the wall heater
There is no difference between the use of the boiler and the radiator. Mainly to choose the brand, good reputation of the dealer, and experienced installation staff.
Q:What skills?
Electric boiler energy consumption is the highest, there is no way to reduce the....
Q:Owners in the decoration before the obligation to suppress the warm...
I was in October 2009 to get the key to the house, small property, but no evidence, on the 3rd floor. At that time the house has been built for two years, when we are a collective decoration. I was renovated in December 2009, was not to warm to suppress, to warm the project to do, at the end of this year when the second floor of the notice received, said his roof leakage, after investigation, confirmed that my family To warm the emergence of a problem, contact the developer, the beginning of the arc 粻 post to save the cheat brother wedge workers did not come over, our property is composed of the village committee, and now I have been paved to the ground, and carpentry has done, Ground to warm, the village committee said to pay part of the money, but not enough of my decoration loss, how should I do? Attached: I am not looking for the decoration company installed, all the renovation projects are looking for the relationship, then the decoration process, there is no damage to the warm 1. I did not suppress the decoration before the warm, I was in the decoration before the obligation to pressure to warm The 2. At that time to do the closure of the test when the second floor has been unable to contact, the current floor to warm this cost and my decoration loss, who should bear? Do I have any responsibility? Who is more responsible? 3. At present, the cost of compensation for the village committee, even the normal pavement money do not come down, how can I do? 4. If the lawsuit, I was the one which side? More...
Q:PE-RTII Oxygen-resistant heating tube custom specifications manufacturers where?
PERTII-type oxygen to warm the pipe has been popular in foreign countries, the domestic pe-rtII oxygen to warm the current tube is still the ranks of high-end heating pipe, slowly will be popular; pertII oxygen to a good solution to solve the problem of oxygen permeation To warm the system in the installation and use of metal components to meet, such as valves and other metal parts, the general pert to warm the plastic and other plastic bite the body of the abundance of the agent by the ax of the hot water circulation process metal parts can easily be corroded, This will be detrimental to pe-rt to the long-term use of the warm-pipe system, the new pertII oxygen to warm the tube to solve this problem, so that the heating system to greatly improve the life of the heating system to ensure that the pe-rtII to warm the system safe use 50 Years or more.
Q:What parts of the radiator (radiator) heating system?
In simple terms, the radiator (radiator) heating system consists of: heating water heater, heating pipe, radiator and thermostat composed of four parts. Specific questions can be consulted at any time.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords