• Lightweight hollow core wallpanel making machine System 1
  • Lightweight hollow core wallpanel making machine System 2
Lightweight hollow core wallpanel making machine

Lightweight hollow core wallpanel making machine

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

·         Condition: New

·         Application: Civil & industrial building

·         Automatic Grade: Automatic

·         Production Capacity: 65-70m/h

·         Place of Origin: Shandong, China (Mainland)

·         Brand Name: Lingfeng

·         Model Number: 50*500*2

·         Voltage: 380v

·         Power(W): 5.1kw

·         Dimension(L*W*H): 2.05m*0.85m*0.8m

·         Weight: 1.2t

·         Features: wall panel machine

·         Certification: Certificate of Utility Model patent

·         Warranty: 1 year

·         After-sales Service Provided: Engineers available to service machinery overseas

·         Holes: 7 or 8

·         Sides: Straight Edge or Hypotenuse

·         Strength: Large use of wear-resistant alloy

·         Alloy Thickness: 1.5mm

·         Exporting Countries: Over 20 countries

·         Business Scope: Worldwide

·         Manufacturing experience: Over 20 year

·         Color: Yellow or custom

 


Prefab concrete light weight concrete wall panels machine is working on a cement platform, it uses prestressed reinforcement as guidance in advance, through the power of the reducer drive the connecting rod for reciprocating motion, by the pushing plate pushed free-fall concrete material into the mold, combined with the upper vibrator vibration force, extrusion molding, at the same time using the reaction of pushing plate, make the machine to overcome the friction from contact with the ground and the friction of the product, walking forward along the prestressed force intermittently, and then form a neat precast products, then cut into the required length after curing finished products.

 

Our Services

Interests in the good faith, interests in quality, interests in the service

 

Customer visits and technical guidance provides 24-hour service and lifetime maintenance services, supply of spare parts. Site church consumer operation, teach operating essentials, equipment maintenance and production experience, considerations.

 

Our factory can produce all kinds of equipment and prefabricated factory accessories according to customer demand.

 

Other available machines:



Q:In a garage I store a saw that has some nooks and crannies that if not blown out with a high powered blower has caused the motor to cease up. They like to get into my riding mower during the winter also.
Glue traps, chemical hot foot ( it burns their paws when walked over it), predator urine, or a cat. Buy some plastic meshing that is fine enough to drape over the nooks and crannies so they can't fit through the mesh.
Q:heavy machinery like a bulldozer - construction equipment
A license to kill.
Q:Jurassic Company owns machinery?
what are you looking for?
Q:I was tasked to look for at least two design experiments to illustrate the industrial applications of AC machines. We are going to perform the design experiments in our laboratory classes. Please help me. Anything simple could do.
You could demonstrate that as the load on a three phase induction motor or transformer, increases, so too does the power factor. This is something that is important to demonstrate as it will lead to the correct size motor or transformer, being installed. A second demonstration could be showing that as the mechanical load on a three phase motor, increases, the motor draws more current and the slip speed percentage, increases slightly. You can use a prony brake to apply more load in both of these demonstrations. You will also need a power factor meter, a watt-meter and a tachometer.
Q:What do you do during shore duty?Which one would you say has the best outlook for an 20+ year career?Are these the hardest working jobs on the boat?
I have served with each of these. Shore duty tends to be in factories alongside a pier. They are called: Intermediate Maintenance and Repair Facilities. Basically machine shops that rebuild valves. However I know one guy that was on a boat with me who got orders to NAS Fallon Nevada to be in charge of their go-cart course. They needed a EN to keep the go-carts running. The needs of the Navy change every month. To say which rate with advance the fastest is a guess. It changes all the time. If you stay out of trouble, you can serve for 20 years and get a pension. Anyone who guarantees you that by doing 'X' will make you a chief, is lying. They all work hard. And they are each highly valued jobs, with good job prospects when you get out. I would recommend that you consider subs too. The extra pay does not hurt.
Q:The machinery will be depreciated over ten years using the double-declining balance method. If depreciation is computed on the basis of the nearest full month, Foley should record depreciation expense for 2007 on this machinery of $20,800. $20,400. $20,550. $20,933.
Assume the machine useful life is 10 years Double-declining-balance method Rate: Double of straight-line rate 100%/10=10% x 2 =20% Depreciation Expense: Year 2006: $120,000 x 20% =$24,000 (whole year) $24,000/12=$2,000 (every month) There are only 8 months (May-Dec.) $2,000 x 8 = $16,000 Year 2007: ($120,000-16,000) x 20% = $20,800 Unlike the other depreciation methods, salvage value is ignored in determining the amount to which the declining balance rate is applied. Depreciationn stops when the asset's book value equals expected salvage value.
Q:i am trying to buy heavy construction machinery and ship the to europe, but i odnt know wher to start with?,?
You okorder /
Q:Which prescription drug goes best with Jack Daniels when operating heavy machinery?
I'm gonna say Ambien. Or any other mass marketed sleep aid.
Q:hoew do you start a waste paper recycling plant ? what are the machineries required?
the fee could rely on how large the plant replaced into. you are going to be able to desire to start with a bypass decrease paper shredder and a 5 gallon (19 liter) bucket and a water faucet. So it would desire to fee everywhere from approximately $one hundred to $a million.5 Billion, i assume. additionally the earnings could rely on the size and performance of the plant and the quantity and fee of hard paintings required.
Q:Its for a Geography Flyer on Arable farmingAll info will be gladly received Thank-you
Machinery to plant, fertilize and harvest crops.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords