Lifting Platform Construction Hoist (SC200/200)

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Building Hoist


Model NO.:(SC200/200)

Type:Lifting Platform

Application:Construction Usage

Tower Crane Type:Slewing Tower Crane

Sling Type:Wire Rope

Main Girder Form:Double Girder

Power Source:Hydraulic 

Moving Type:Fixed

Installation:Jack-Up 

Certification:ISO9001: 2000, CE

Condition:New

Max.Lifing Load:2*2000kg

Max.Lifting Height:400m

Main Power Source:3~380V

Cage Size:3mx1.5mx2.6m

Cage:Double

Mast of Section:0.65X;0.65X1.508m

Color:According to Customer Need

Warranty:1 Year

Total Power:43.5

Max. Free End Height of Guides:7.5m

Export Markets:North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe


Building hoist Specifiction




m/min
0-96

Free standing heightm50
Max. Lifting Heightm400
Max. Free End Height of Guidesm7.5
Modulus8
Carriage Weightkg1012×2
Size of Carriagem3×1.3×2.3
Standard Knot Weightkg146
Dimension of mast sectionm0.65×0.65×1.508
Motor


Rated PowerKw3×18.5
Rated Rotate Speedr/min1460
ReducerCenter Distancemm125
Ratio
1:16
Over speed GovernorTypeprogressive type
ModelSAJ40-1.2A safety device
Operation Speedm/min51.6
Brake MomentN.m≥3000
Lifter Weightt22


Building Hoist Images


Lifting Platform Construction Hoist (SC200/200)

Lifting Platform Construction Hoist (SC200/200)

Lifting Platform Construction Hoist (SC200/200)

Lifting Platform Construction Hoist (SC200/200)

Lifting Platform Construction Hoist (SC200/200)


FAQ of Building Hoist

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How is the construction elevator installed
The construction elevator should choose a good position first, do the elevator foundation, at the same time make the wall in the setting process. This one has the corresponding elevator basic drawing, should the professional personnel carry on setting up and disassembling.
Q:How does the elevator operate
Responsible for operating elevator, maintenance, maintenance and safety. See what kind of elevator and workplace you are working on.
Q:Elevator installation approach, need to give the total package (inspect) what data, come a master to answer the detail point
Supplement: Component members: project manager, safety personnel, inspectors, field director, technical director, foreman, elevator operation (mechanical, electrical installation and maintenance) welders, electricians, scaffolder, etc. The subcontract unit project manager shall have a certificate of construction, and special work shall be given the special work certificate. If the special work certificate is outside the province and province, the construction committee of the construction site should be put on the record.
Q:Why is the construction elevator not up to the roof
The free end of the construction of the lift height is only 7.5 meters high, general construction elevator drive now is the case, so the hoisting cage height and drive around 4.5 meters high, the other national standard construction elevator ceiling limit moves, drive above about 1.8 meters away from the top of the rails. So it's the free end of the construction elevator that can't satisfy the roof. As long as they can set up effective adhesion measures, they can also get on the roof.
Q:The difference between the derrick and the construction elevator?
They're the same. HAULOTTE answer for you
Q:How many meters or how many layers should the construction elevator be installed?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:What is the meaning of double straps in the construction elevator?
With double cage for heavy, namely SCD200/200 series Is the two cages, each cage has a corresponding weight, the weight up and down in the elevator cage rise to energy conservation and reduce the reaction between the up and down, when you imagine front-rear door principle is about the same
Q:How long does the construction elevator do a crash test
You don't have to do it now. Go straight to the test center. A site is tested once
Q:Construction site construction elevator and tower crane, which unit security check and acceptance?
Inspection by the quality supervision bureau special equipment inspection department.
Q:How many floors do you need to install a construction elevator?
In this case, you do not need to install the construction elevator at the main stage. After the main body is finished, install the tower crane, reinstall, mainly for decorate the vertical transport of the stage.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range