Lifting Anchor Forged Straight Type Long Design IIII

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Specification:

Material: Carbon Steel, Forged

Finish: Self Colored, or Galvanized

Packaging: carton, then on pallets, or as customers' requirements

Stocks: we have stocks for regular sizes

Warning: never exceed working load limit


2. Products available:
Swift lift lifting eyes are used with the swift lift anchors to lift, handle and place precast concrete elements

3. Primary competitive advantages:
1. More than 10 years 4 years focus on building material manufacturing
Prompt delivery lead time within 25 days after confirming order
2. Eathu's products are enhanced by the factory QA and quality control checks during the production, if necessary each order can be send out with a certificate referring back to test
3. OEM/ODM capability: more then 10 years experience

Military Specifications

Packaging

Price

Product Features

Product Performance

Prompt Delivery

Quality Approvals

Reputation

Service

Prompt Reply within 24 Hours


4.Packaging and delivery:
Packaging details: goods packed in cartons and then on the pallet
Delivery detail: within 25 days after getting payment


Market:

Asia

Western Europe

Australasia

Central/South America


FAQ:
 
Q1: How long about delivery time  Concrete Lifting  anchors  ?
A1: The delivery time will be very short, normally we keep the raw materials for old customers and sometime we 
also keep stock products to 

make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our  Concrete lifting  anchors?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.
 


Lifting Anchor Forged Straight Type Long Design IIII

Lifting Anchor Forged Straight Type Long Design IIII


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How can the concrete pump pipe be cleaned?
The pipeline shall be provided with a stop valve, and the stop plate shall be inserted to prevent the vertical or upward tilting of the concrete in the pipe
Q:What is the farthest pumping distance of concrete pump truck?
Now the domestic pump to achieve the highest pump height, the largest is ZOOMLION made 80 m carbon fiber boom pump, but also to achieve the pump Guinness world record
Q:What is the second generation pumping technology of concrete pump?
The hydraulic reversing technology is realized by reversing the hydraulic signals of the main cylinder and the small hydraulic cylinder.
Q:What kind of concrete pump truck?
But the drawback is that the delivery speed is slow. Delivery height is better than vehicular pump. Among them, the more moderate is the car pump. But the advantage is that the arm pump can do, it can do, that is, when construction, need to install the pump ahead of time, relatively troublesome. But the relative pump speed and delivery height are higher
Q:What is the washing process of the concrete pump pipe?
Open the first section of the reducing pipe and the discharge gate, and thoroughly remove the remaining concrete in the hopper, the distributing valve box and the reducing pipe.
Q:Which height of concrete pump is the most practical?
The power of the concrete pump truck engine power is transmitted to the hydraulic pump or rear axle through the power transfer case, push the piston to drive the hydraulic pump concrete pump
Q:How is the piping of the concrete pipe designed?
In the same line, should transfer the same diameter concrete pipe; at the same time, using the new 1 pipe section, should be the new arrangement of the tube in the pump delivery pressure is larger; pipes should be arranged vertically
Q:What is the name of the pump for concrete transportation?
The power of the concrete pump truck engine power is transmitted to the hydraulic pump or rear axle through the power transfer case, push the piston to drive the hydraulic pump concrete pump. Then use the pump cloth on the rod and delivery pipe, the concrete delivery to a certain height and distance.
Q:What are the causes of pipe blockage in concrete pump?
The concrete mixture ratio of adverse pressure gradient in the relatively large, water will be through the aggregate gap penetration, the aggregate coalescence caused by plugging occurred in the pipeline, and the pipeline bending diameter hose is arranged in the middle; in addition, concrete water cement ratio is too large to cause the separation of mortar and aggregate segregation, and plugging
Q:Why would the plugging concrete pump pipe
Pump operator in pumping construction should concentrate, always pay attention to pumping pressure meter readings, once found that the pressure gauge reading suddenly increased, should immediately anti pump 2-3 stroke, and then pump, pipe can be excluded

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range