Lifting Anchor Forged Straight Type Long Design IIII

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Specification:

Material: Carbon Steel, Forged

Finish: Self Colored, or Galvanized

Packaging: carton, then on pallets, or as customers' requirements

Stocks: we have stocks for regular sizes

Warning: never exceed working load limit


2. Products available:
Swift lift lifting eyes are used with the swift lift anchors to lift, handle and place precast concrete elements

3. Primary competitive advantages:
1. More than 10 years 4 years focus on building material manufacturing
Prompt delivery lead time within 25 days after confirming order
2. Eathu's products are enhanced by the factory QA and quality control checks during the production, if necessary each order can be send out with a certificate referring back to test
3. OEM/ODM capability: more then 10 years experience

Military Specifications

Packaging

Price

Product Features

Product Performance

Prompt Delivery

Quality Approvals

Reputation

Service

Prompt Reply within 24 Hours


4.Packaging and delivery:
Packaging details: goods packed in cartons and then on the pallet
Delivery detail: within 25 days after getting payment


Market:

Asia

Western Europe

Australasia

Central/South America


FAQ:
 
Q1: How long about delivery time  Concrete Lifting  anchors  ?
A1: The delivery time will be very short, normally we keep the raw materials for old customers and sometime we 
also keep stock products to 

make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our  Concrete lifting  anchors?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.
 


Lifting Anchor Forged Straight Type Long Design IIII

Lifting Anchor Forged Straight Type Long Design IIII


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the first generation pumping technology of concrete pump?
The failure rate and maintenance cost are very high, and it is easy to delay the progress of the project
Q:What are the fittings of concrete pump?
The commonly used electrical accessories (button switch, switch, trip circuit breaker, transformer terminals, etc.), hydraulic pipe
Q:What is the difference between concrete pump and ground pump?
The pump is easy to move and flexible, but generally limited to the length of the boom by 60-70m. The ground pump is not limited by height, but it needs to be connected with the conveying pipe, which is of poor flexibility
Q:What kind of concrete pump truck?
At present, I know the pump mainly has the arm pump. This kind of arm work is flexible. Relatively fast speed. But the cost of maintenance and use is relatively high. Height limit. There are many requirements for the site
Q:What are the performance characteristics of concrete pump?
The use of advanced S pipe distribution valve, automatic compensation for wear clearance, good sealing performance
Q:What are the precautions for gas washing of concrete pump?
Compressed air pressure shall not be higher than 0.7MPa
Q:Is the main pump of the concrete pump electric control or hydraulic control?
Closed main oil pump behind the charge pump to provide a constant pressure to the displacement of the electromagnet by the current control output pressure to achieve the main pump pressure and pumping the commutation.
Q:How is the piping of the concrete pipe designed?
Vertical upward piping, the ground level pipe length shall not be less than 1/4 of the vertical pipe length, and shall not be less than 15m, or comply with the provisions of the product manual. A stop valve shall be provided at the root of the conveying pipe of the concrete pump Y - shaped pipe discharge port 3 - 6m, so as to prevent the concrete mixture from flowing back
Q:How can the concrete pump be installed and used?
Operation should be carried out before the examination, to confirm the normal electrical equipment and instrumentation, each part of the switch button, the handle in the correct position, the mechanical part of the fastening point is firm and reliable, and the chain belt tightness to meet the requirements, the normal operation of the transmission parts
Q:How to deal with the blockage in the outlet of the distributing valve of the concrete pump?
Pour the grout into the hopper, turn the pump in and out again and again, forcing the passage to open

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range