Liebherr Tower Crane with CE certification

Ref Price:
Loading Port:
China main port
Payment Terms:
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of our Tower Crane


1) TC60/10 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

Advantage of our tower crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of Tower Crane


Tower crane TC4808
Rated load momentkn.m400
Tip max. loadt0.980.98
Hoisting heightindependentM30
Trolley speedM/min34/22
Hoisting speed0.4
Slew speedR/min0.6
Outer size of the whole cranechasism4.6*4.6
Standard section1.5*1.5*2.2
Height of crane(independent)37.185
Weight of craneWeight of independent structuret16.92
otherMotor capacitykw26.8
Top allowable wind speedM/sOperating≤20
Allowable operating temperature0°C-20~+40



Liebherr Tower Crane with CE certification

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:when a skyscraper is done being built, how does the crane come down?
Skyscraper cranes (for construction) are usually dismantled into small sections and pieces after final stage of construction is done. Some of the smaller pieces are transported down by construction evaluators, while bigger pieces are lifted down by series of pulleys or cranes mounted at the side of the buildings edge.
Q:for example, if the crane boom lenght is 40 and radius is 11 meter,the how to know about the angle.?
Boy! You really need to get the angle indicator fixed and calibrated! There are ways to estimate, but they are inaccurate and therefore not safe, if you have not got the expierence to do it. Don't use the crane for any load close to your SWL!!! An addition: unless you want to measure your reach, i.e. the distance from the crane pedestool to your load, then you can calculate the angle, but you don't need to anymore as you now know what the distance of your lift is and therefore you can look up the SWL on your chart. Get it fixed.
Q:What controls are needed for the 'average' tower crane?
There are only two control levers that are on a tower crane.There is one on either side of the seat called joy sticks the right side joy stick controls the hoist cable to go up and down pushed forward to go down and pulled back to hoist up.The left has four functions it controls the swing of the crane and also the boom of the crane to control the swing you push the lever to the left to swing left and push the lever right to swing right.You pull the lever back to boom up and puh it forward to boom down.
Q:What type of lever would a tower crane be?
The crane is balanced, with a fulcum somewhere between the ends. On one end, you have counter weight sometimes can be moved. On the end, you usually have the crane part, which can be trolleyed from the end toward the fulcum. If my memory serves me. a wheel barrow is a type 2, because the fulcum is on the end and the load is toward the middle. So this leaves you with a type 1 or 3. Try searching using the key word group lever type fulcum and I'll bet you get your answer.
Q:Why is house walking with a crane? Is he disabled? How did he get disabled?
I dont know how, maybe polio, but he does have a disability.
Q:How good a job do you think Crane did in voicing the theme of pride/morales in Red Badge of Courage?
How good a job do _you_ think he did? If this is a homework then your teacher wants _your_ opinion, not that of a stranger on the internet.
Q:what is the ground bearing capacity required for a crane weighing 300t 100t lift.?
This depends on the angle of the lift and the distance away from centre of the crane. With the lift at tipping range all 400t will be distributed along the outer half of the pad or on the extreme legs. Rule of thumb is all the load is placed under the one pad. so one pad is 9 sq metres and the load is 400 tonnes so the bearing capacity must exceeds 400/9 tonnes per square metre. 44.44444t/m^2
Q:what type of writer was stephen crane?
Stephen Crane was a naturalist a lot like Jack London. His main themes were man vs. nature and man vs. himself in which nature is an abstract, omnipotent force that does not (and really cannot) care what becomes of the individual. In Crane's writings, man is often faced with strengths and weaknesses within himself when confronted by extremes of uncaring Nature (see the short story The Open Boat).
Q:Tower crane and tower crane 5
Tower crane, tower crane, also known as tower craneTower crane = tower crane = tower craneThere are many ways of vertical transportation. Construction elevator hoist etc..Tower crane features: large operating space, mainly used in housing construction materials vertical and horizontal transmission and installation of building components.It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:What are the basic parameters of a tower crane?
The basic parameters of a tower crane include the length of the crane itself, the weight of the crane as well as the weight of the counterweight! Tower crane lifting mechanism; slewing mechanism; luffing mechanism; motor power;...

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range