Led Track For Store Front Glass, Glass Window Led Display,New Led Window Lights

Ref Price:
$3.09 - 5.15 / pc
Loading Port:
Payment Terms:
Min Order Qty:
1 Pc pc
Supply Capability:
100000 Pieces Per Week pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


1. Our Window border system compile the LED module with track and cover together.

2. The wires between the two led module can be hided by the cover perfectly.

3.It’s widely use to decorate the edge of a building, store-front frames, tray ceiling lighting and cabinet under lighting.

4.It is very easy to install our led module window border system, simple and transportable!

U LED Module window light Specification:

Part No



LED Quantity


6 Pcs

Input Power




63*15*4.6 MM





Housing Material




Coloration Index


Input voltage

DC 12V

Working temperature


IP Rank


About Us

1. Quality Control:

100% of the lamps will be tested and keep lighting for 12 hours to test its quality reliability,  Then after it is cool we again test 100% of the lamps to see if it still work well. Each lamp should pass all these QC procedures before shipping to customer.


2. Order infomation

 MOQ: 20pcs


3. Trade term: EXW / FOB Shenzhen


4. Delivery time: 3-7 working days for sample order, 7-15 working days for mass order.



Two years since the date of purchase.



1. Under the terms of this warranty, if the product have a failure occurs under normal usage within warranty period, we will provide free/rework new products


2. If Failure or damage due to incorrect operation, wire connection, or anything other do not follow our instuction, GOULY will provide paid maintance within warranty period.


3. Discounts: We offer discount for big quantity.


Customized options

Customize your strip light by picture or by technical datas.


Packing & Delivery


plastic bag intside, cartons outside 



Shipping Service

Estimated Delivery Time


2-8 business days


3-8 business days


2-10 business days


1-7 business days


6-14 business days


7-12 business days

China Post Air Mail

7-15 business days

China Post SAL

14-30 business days

Air freight

3-10 business days

By Sea

30-40 business days

1.    3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.

2.    "Business days" means Monday-Friday, excluding holidays.

3.    DHL and UPS cannot ship to military or P.O. boxes address

4.    The Shipping Service above is for reference only, for any other questions, please feel free to contact us.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:LED current increases beyond 20MA, or when 30MA-50MA has consequences for LED lights?
Brightness increases, calorific value is great, life is reduced.If the rated current is not large, relative to 20-30mA is relatively large, then the LED will burn out.
Q:Why is the LED patch band always flashing?
If the AC transformer is switched on, it will flash.LED patch lamp, also known as SMDLED, Chinese SMD LED or SMD LED, the purpose of packaging is to produce automatic placement machine can be used,The main models are 0402.0603.0805.1206.3528.3020.5050.3014.5730, etc.
Q:Series parallel Led light band problem
You see if there are any scissors signs on it, and if so, each section is the same. They are all connected in parallel. One transformer is ok.
Q:LED lights with lights, some light, and some light, or in the middle of a section will not light
Does the length of a section of lamp belt exceed the standard? No problem under 20 meters.
Q:LED lamp belt, hot tin is not strong, what should I do?
The lamp belt is made of waterproof, and the inner conductive body can be insulated. You can use a knife to scrape or scrape the surface protection layer with sandpaper, so you can use the soldering tin
Q:LED lamp and lamp with high and low points?
I don't understand what you say,The normal white light source is the basic 3V to light, if you give a 2.7/2.8V or to light up, but if you give a 1.5V is absolutely not bright,It depends on his volt ampere characteristics,We should look at how much light with a lamp, and on a few a few,
Q:LED color lamp does not take controller, can you still change color?
Still will, but there should be no fixed time, the controller is to control the internal structure of the circuit to make colorful lamps color time fixed, without the controller will make colorful lamp color change time is uncertain.
Q:What should I pay attention to when installing LED soft light belt?
Each meter has a "scissors" mark, only in the mark to cut, scissors or scissors will lead to one meter does not light, it is best to carefully look at the mark before the location, according to the middle of no connection can be cut.
Q:Does the LED light band save energy?
LED lights also have different luminous efficiency, high quality light-emitting efficiency, quality inspection of low luminous efficiency, may not be more energy-saving than three primary color T5 energy-saving lamps. Can not be generalized.
Q:The difference between LED light band and T5 tube
LED lamp belt and tube which good _Led lamp band advantages and disadvantages?1, soft, can bend like electric wire;2, shear and extension;3, the bulb and the circuit are completely wrapped in flexible plastic, with good insulation and waterproof performance, and safe to use;4, strong climate resistance;5, not easy to break, long service life;6, LED light band, easy to make graphics, text and other shapes;

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range