Led Pole Mounted Motif Light

Ref Price:
$3.09 - 309.00 / pc
Loading Port:
Shenzhen
Payment Terms:
L/C,T/T
Min Order Qty:
20 Pieces pc
Supply Capability:
50000 Pieces pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

holiday time christmas lights,decorative lighting,decorative light

 

Feature

1. christmas light, you can decoration your shop,house and so on.lower power consumption, little heat loss, convenient installation 
2. 24V-240v as you like

3. its will make you warm in winter 

4. steel frame with white painting 
5. used outdoors or indoors

6. IP44, IP65,CE ROHS certificate

7. we can do your sepcial design

8. two years gurantee and good after service

9. Shipping freight are quoted under your requests 

10. Sample can be delivered in 3 days

11. Payment:T/T 40% deposits before production,60% balance to be paid before deliverying

12.Free power adaptor plug will be attached for different region according to shipping address. 

13. Good quality,Strict production and management

 

 

 

 

Our Service:

Quality Guaranty: 100% workable, 

Fast Shipping : If for sample order, we can ship them within 3 days.

Quick answer: we will answer your question within 10 minutues

Free samples avaliable... If you willing to pay the shipping charge.

We will offer the best after sell service to you. replace the fialed items.

All your inquiries will be replied within 24 hours.

 

Customized options

Customize your led light by picture or by technical datas.

 

Packing & Delivery

Package:

standard packing intside, cartons outside 

 

Delivery:

Shipping Service

Estimated Delivery Time

DHL

2-8 business days

FedEx

3-8 business days

TNT

2-10 business days

UPS

1-7 business days

EMS

6-14 business days

ePacket

7-12 business days

China Post Air Mail

7-15 business days

China Post SAL

14-30 business days

Air freight

3-10 business days

By Sea

30-40 business days

1.    3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.

2.    "Business days" means Monday-Friday, excluding holidays.

3.    DHL and UPS cannot ship to military or P.O. boxes address

4.    The Shipping Service above is for reference only, for any other questions, please feel free to contact us.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Lighting line connections?
2 parallel circuit: the circuit elements are connected together, the characteristic is: the current sanctions in the two part of the road branch, respectively through the two branches of the various components.
Q:Do you want city lighting?
About city lighting, whether to do this problem, depends on how to understand? City lighting also called night lighting, is referred to as words, he has a lot of classification, such as buildings, squares
Q:Notes on installation of lighting for 105W high power energy-saving lamp factory building
High pressure xenon lamp can recommend Jane, very suitable for road lighting, tunnel lighting, lighting, lighting, industrial workshop lighting, port park lighting, high pole lighting, energy-saving rate of high effective, high light efficiency, light pollution is small, especially the color performance can reach more than 90Ra, is very suitable for fine processing workshop
Q:How much does LED lighting save more than regular lighting?
I see the circuit design of high voltage LED driver for some people, he is not with the step-down switching regulator, but with the series resistance buck, such a scheme can not take advantage of the LED is LED to save power and waste on resistance in series,
Q:Festival lights are connected by a number of light bulbs connected to the lighting circuit
, lighting voltage of 220V, 22 "10V, 2W" series connected to the lighting circuit, the voltage of each bulb is 10V, just for the rated voltage of the bulb, more appropriate. So C is correct
Q:What is lighting energy-saving?
The earth's oil and natural gas exploitation period of about 50 years, the coal mining period is about 300 years, and with the production volume increased year by year, these fossil fuels can be exploited will further reduce the energy in the world is not optimistic
Q:The problem of intelligent lighting control
Intelligent lighting control system, or intelligent lighting monitoring system, will generally be divided into two categories: indoor and outdoor, indoor power lamps are generally small, the application environment is relatively poor.
Q:Do the statutory holidays allow schools to assign homework to students?
The state has trained young people, adolescents and children in all-round development of morality, intelligence and physique."
Q:Lamps, fluorescent lamps, lighting appliances, energy-saving fluorescent lamps arranged in order
The world is bright and colorful lights, daytime traffic lights are neatly, with neon lights shining in the evening, the lantern festival lanterns are in different poses and with different expressions I love most, however, is that lamp!
Q:Building lighting in lighting, lighting should pay attention to what details?
Building lighting should be performed according to the design of the building and the coordination of lighting effects, because the appearance of the building is very different, so we should choose a lively representation to decide, so as to achieve good results.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range