LDPE Geomembrane for Landfill to Prevent the Waste Water

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
10000 m²
Supply Capability:
500000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Ldpe Geomembrane for  Landfill

Good mechanical properties, high tear strength, deformation and adaptable, puncture resistance, anti-aging, anti-ultraviolet-resistant, Anti oil and salt, pH, anti-corrosion, high temperature-resistant, non-toxic, long service life. water, drainage, seepage, the good effect of moisture, width, thickness of the full range of specifications and low cost, simple construction. 

Main Features of Ldpe Geomembrane for  Landfill

1) Thickness : 0.15mm - 4.0mm.


 2) Width : Within 8 m (1m-8m).


 3) Length : 50m-100m/roll (as request).


 4) Material : HDPE,( LDPE, LLDPE, PVC, EVA ).


 5) Color : Black , white , red , blue , or as required.


 6) Optional surface : Textued(one or two side) or smooth surface.


 7) The biggest geomembrane liner manufacturer/factory in China for many years .


Ldpe Geomembrane for  Landfill Images


Waterproof Polyethylene Geomembrane with Colorful for Pond 

Waterproof Polyethylene Geomembrane with Colorful for Pond


Waterproof Polyethylene Geomembrane with Colorful for Pond

Waterproof Polyethylene Geomembrane with Colorful for Pond

Ldpe Geomembrane for  Landfill Specification :


Tensile Strenght MD/TDMPa

Environment Protection


Elongation at Break MD/TD


Right-angled Tear MD/TDN/mm


Anti-crack F20h


-70°Clow temperature impact

embrittlement performance


200°C oxidation inducement time (min)


Carbon black content



1. How about the delivery time?    

    Two weeks upon receipt of down payment. 

2. What kind of payments do we accepted?   

   T/T, L/C, WesternUnion, MoneyGram. 

3. What's are the MOQ?   

    Normally the MOQ is 5000 SQM in theory. 

    And we can provide you free samples for quality inspection.  

4. Do you charge for the samples?   

    Accordeing to our company policy, the samples are freee, we only charge the freight fee. And we will return the freight fee in your second order.   

5. Can you produce the product according to customers' requirements?

     Sure, we are professional manufacturer, OEM and ODM are both welcome

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the cost of membrane structure?
Because of its cost is too high, the general building construction will consider about the cost and performance, it is very rare to choose this kind of film material, and the number of the producer of this membrane abroad is very few.
Q:What if there is water during construction of geomembrane?
The main role of geomembrane on the road is water insulation, the part higher than the underground water level is isolated by geomembrane, and then backfill and grind, preventing the water through soil capillarity from soaking roadbed filler.
Q:What are the differences between the geomembrane and the geotextile?
Generally speaking, separated geotextile does not have the effect of anti-seepage, the main indicators for performance appraisal is permeability coefficient. Coefficient of ordionary geotextile is higher than ordinary plain soil, around 0.01-0.001.But geotextile ,when combined with rubber, asphalt, and plastic will form a waterproof complex and effect of anti-seepage will increase 10 times, and a combination with asphalt, and rubber will form waterproof roll like SBS; a combination with plastics, generally polyethylene, polyvinyl chloride, EVA (official name is geomembrane) will form anti-seepage geomembrane or composite geomembrane, because white composite geotextile outside is for the protection, so the project is also called anti-seepage geotextile. Therefore, there is not much difference between the two, just different statement.
Q:how to remove the oxidation of the packaging film of aluminium alloy door and window by the sunlight?
after washing with the acohol using the water to clean, although now the proximate matter has electrophoresis treatment, but it is better to try not to let it contact with corrosive materials, and it is not recommended to use gasoline or nitrocellulose lacquer thinner ( after washing the paint is easily residual, not easily cleaning), or after installing it is better to tear up. ,
Q:Does the electrothermal film consume a large amount of electricity?
Electrothermal film heats to the required temperature, the system is in full load working state. The speed of reaching required temperature is slightly different according to various ground materials, usually the temperature of those laid directly under the composite floor increases quickly. It takes about 20 minutes to rise to 18 degrees.
Q:The applied range of HDPE geomembrane
Refuse landfills, sewage disposal plants, power plant tail slag processing, chemical plants, fertilizer plants, sugar mills sewage and tailings treatment, non-ferrous metallurgy, sulfuric acid tank, tailings disposal, subways, basements, tunnels, roof lining and other special circumstances impermeable (special); reservoirs, canals, dams, laying horizontal impervious, impermeable vertical laying; seawater, freshwater, farms seepage.
Q:The concept of HDPE geomembrane
PE has excellent resistance to most living goods and industrial chemicals, relatively large use temperature range (-60---+60) and long service life (50 years). It is aging-resistant and can be used in artificial lake seepage proof.
Q:What is the difference between the dredging of the soil and the soil pipe?
The geotechnical membrane is made of plastic film as the impervious material, and the composite of the non-woven fabric is made of the soil anti seepage material.
Q:How to install soft membrane ceiling in conference room?
Step 1 of soft membrane ceiling installation in conference room: 1. In accordance with the requirements of design drawings, fix a circle of supporting keel (batten or steel pipe) around the place to install soft membrane ceiling. (See construction design drawing).Note: in some large places, you need to install by block to achieve good results. In this case, you need to add batten in between. This depends on actual situation. 2. When all required battens are fixed, install and fix aluminium alloykeel of soft membrane ceiling in the bottom of supporting keel. (See construction design drawing) Step two: 1. When all installation of aluminum keels of soft membrane ceiling are fixed, install soft membrane. First open soft membrane and heat sufficiently and evenly with dedicated heater, then insert the soft membrane into aluminium alloy keel with dedicated slotting tool, and finally cut the surrounding spare soft membrane. (See detailed construction design) 2. After installation, use a clean towel to clean soft film smallpox.
Q:Why imported geomembrane (HDPE) is most frequently used impermeable material among artificial synthetic materials?
Because of its minimal permeability coefficient

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range