Ldpe Geomembrane for Landfill to Prevent the Waste Water

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
5000 m²
Supply Capability:
500000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Ldpe Geomembrane for  Landfill Images

 

Waterproof Polyethylene Geomembrane with Colorful for Pond 

Waterproof Polyethylene Geomembrane with Colorful for Pond

 

Waterproof Polyethylene Geomembrane with Colorful for Pond

Waterproof Polyethylene Geomembrane with Colorful for Pond

Ldpe Geomembrane for  Landfill Specification :

 

Tensile Strenght MD/TDMPa

Environment Protection

≥25

Elongation at Break MD/TD

≥550

Right-angled Tear MD/TDN/mm

≥110

Anti-crack F20h

≥1500

-70°Clow temperature impact

embrittlement performance

pass

200°C oxidation inducement time (min)

≥20

Carbon black content

2.0-3.0



FAQ:
 

1. How about the delivery time?    

    Two weeks upon receipt of down payment. 

2. What kind of payments do we accepted?   

   T/T, L/C, WesternUnion, MoneyGram. 

3. What's are the MOQ?   

    Normally the MOQ is 5000 SQM in theory. 

    And we can provide you free samples for quality inspection.  

4. Do you charge for the samples?   

    Accordeing to our company policy, the samples are freee, we only charge the freight fee. And we will return the freight fee in your second order.   

5. Can you produce the product according to customers' requirements?

     Sure, we are professional manufacturer, OEM and ODM are both welcome

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the types of mucous membrane disinfectant.
Povidone-iodine has the good effect in disinfection, it is bland, compared with iodine, alcohol it will cause a slight pain, so it is easily accepted by patients, and widely in use.
Q:What is the installation technology of soft membrane?
When installing the soft membrane, the first is to install the four angles of A, B, C, D, then the diagonal pull point installation, finally all installation. The installation sequence: 1. Before the entering of the soft film smallpox, the site must be electrified and without construction waste. 2. The deal with the bottom of the piamater ceiling should be fit for the installation conditions, such as the installation of the steel and so on; it must be cleaned. 3. All the installation of the lights must be according to the requirement of us. We should ensure all of the circuit to be electrified. If there are any lamp not lighting up before installing the soft film, it should be adjusted and repaced in time. The interior hidden lights should be painted with white paints so as to get a better effect. 4. The air conditioning and fire pipes must be arranged in advance and debug to keep it operating well. After the installation of the air inlet, spray head, and smoke sensor, all of them should meet the requirements of us. 5. After the installation of the piamater ceiling is completed, for example, the paint should repair the gypsum board and should not touch the soft film smallpox.
Q:Design materials of geomembrane
embedding. Highway anti-seepage treatment, take minimum seams of construction as principle: the central median when the lower part Impervious generally use a cloth membrane 200-300g / m. Based on the water pressure requirements of engineering design. When the base layer is concrete structure, the construction conditions, to determine the width and length of geomembrane:. // F, to determine the thickness of the geomembrane, climate conditions:. // F, construction capacity. According to the actual size, life and other application conditions of the project, and according to the project nature exposure, the application site.
Q:Difference between cars and home insulation film
Window glass film, architectural glass film, electrostatic glass film, electrostatic automotive glass film and car glass film. Home decoration glass paste.
Q:Anti seepage coefficient of PE geomembrane
Less than 10^-10cm/s
Q:What are the reasons for the damage of geomembrane?
When introduing geomembrane quality system, US experts said that statistical material show that the geomembrane breakage caused by construction accounted for over 60% of all geomembrane breakage quality assurance
Q:Is the new crystal steel door film expensive?
The price of the new crystal steel door film is relatively modest.
Q:Who need the national standards of geomembrane?
One is GB 1st type
Q:Does ipad need not to stick film?
1. If you want to protect it, you had better stick film for it. But if you want to use it more comfortably, you need not to do that. 2. The screen of ipad air is a anti-fingerprint coating. Even you cut its screen with a knife, there will not be scratch. But if you stick film, it will affect light transmittance. So sticking film is just consoling yourself. It is not suggested to stick film. But without filmor other treatment, there will be many fingerprints and dirty streaks.So it looks bad. It you stick film, you can wipe it freely when it becomes dirty. It is easier to clean and you don't have to worry about it.
Q:Does computer vision protective film really work?
It is for sure that the protective film has no effect, and will make the screen looks dark, impacting eyesight! Because present display is plated with a layer of anti-dazzle film on the surface, which has radiation protection fuction, basically can guarantee vision health of users. Of course, if watch the screen before the computer for a long time, it only does harm to the vision without any benefit, so it is recommended to reasonably arrange time and not always sit in front of the computer.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range