Ladder Frame Steel Tower Scaffolding light duty CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Brand Name: AJ steel tower scaffolding

  • Model Number: LF1700 steel tower scaffolding

  • Material: Q235 steel pipe

  • Color: Orange,dark red,blue

  • Surface treatment: Dip painted

  • Technique: CO2 arc welded

  • Diameter: 42mm

  • Height: 1.7 m /set

  • Thickness: 2.0/2.2mm

  • Type: light duty steel tower scaffolding

  • Application: steel ladder scaffolding for interior and exterior construction

  • Certification: SGS


2.Packaging & Delivery

Packaging Details:

Delivery Detail:

1.steel tower scaffolding is in bare package, loading in container. 2.One 20 GP container can load almost 150 sets of Scaffold Building Tools

10-20 days after deposit

3.

Model No.

Standard 
  Length

Ledger 
  Length

Thickness

LF1700

1.7m

1.2m

2/2.2mm

LF1219

1.2m

1.2m

2/2.2mm

LF914

0.9m

1.2m

2/2.2mm

4.feature

 A set of steel tower scaffolding has 2 pieces of welded ladder frames, 2 pairs of cross braces,  4pieces of connect pins.

Steel tower scaffolding is the ladder type frame scaffolding which is made of Q235 steel pipes  .

Steel tower scaffolding can be moveable by installing caster wheels at the bottom of ladder scaffold.

Specification of steel tower scaffolding 

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Ladder Frame Steel Tower Scaffolding light duty CNBM

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Industrial scaffold piercing? How much does it hurt? When you sleep and lay on it does it hurt? etc.?
Pain will differ from person to person so no one can really answer that. My advice is to sleep with your arm bent under your head so your ear is in that little whole and nothing can bother it. Also, avoid dying your hair for the next two months and be care when putting on sweaters, shirts, brushing hair, et cetera. Infection is a problem if you keep it clean but irritation is because every time you bump on side, you bump the other as well. Good luck!
Q:There is no shelter outside the scaffolding project has been accident accident case
When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long) and the fasteners are removed to the hanging plate of the frame, and five workers fall from the roof with the hanging plate
Q:Prefabricated concrete pipe piles belong to raw materials or structural parts
There are columns: pipe pile, frame column, independent column, structural column, Cylindrical, L-shaped columns; brick columns, concrete columns, wooden columns Beam: frame beam, connecting beam, over beam, ring beam, cantilever beam, curved beam; steel beam, wooden beam, concrete beam Plate: cast-in-place board, prefabricated flat plate, prefabricated hollow plate; reinforced concrete plate, wood board Wall: brick wall, concrete wall, roof daughter wall, light partition Doors: solid wood doors, plywood doors, steel doors Windows: steel windows, wooden windows, aluminum windows, steel windows Building accessories are construction and construction components other than building blocks, such as scaffolding, pipe thread regulators for construction, construction bars, triangular construction supports, and steel joints
Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
The following model for your reference, the project budget is to determine the project cost and work, material consumption of the document, is the basis for assessing the economic investment
Q:How to do a good job in typhoon prevention work in rural areas?
Listen to weather forecasts, reinforce Dapeng and other infrastructure, to prevent lightning, to quickly cut off all kinds of electrical power
Q:How long do you have to wait before you can take a scaffolding piercing out for short periods of time?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
Q:Scaffold piercing care tips? Sleeping on it? Cleaning it Anything useful you've discovered besides the obvious?
Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
Q:What rights do I have as a tenant in regards to the scaffolding outside my window?
The scaffold is necesary, and already thre, and probably not coming down. I would think you have to LET the Land Lord give you a deal, and any decent LAnd Lord should respect wishes. You may have to move, but a deduction, possibly. Security, demand it ! Get the windows fixed, and if you are really unsure of the scaffold and window, get renters insurance, it's just twenty bux a month !. or buy a big DOG
Q:Can the fifteen typhoon blow up the three - storey house?
Therefore, when the typhoon comes, do not in the dilapidated housing, sheds, temporary buildings, scaffolding, poles, trees, billboards, towers and other places prone to casualties shelter Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Therefore, before the advent of the typhoon to be fixed flower pots, air conditioning outdoor unit, awning, construction site sporadic items to ensure safety Typhoon may cause water and electricity and other phenomena, to do a good job in daily life of the reserve work Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Such as: balcony, roof pots, air conditioning outdoor units, rain Peng, solar water heaters, roof debris, construction site sporadic items, tools, building materials and other vulnerable to wind caused by casualties Therefore, the majority of the masses in a timely manner to fix a good pot and other items, construction companies to sort out the construction equipment, tools, sporadic materials to ensure safety
Q:How to carry out fire inspection at construction site construction site (including information and site)
How to carry out fire inspection at construction site construction site (including information and site)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range