Ladder Beam 300*3000 Q235 Carbon Steel for Scaffolding CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of Ladder Beam 300*3000 Q235 Carbon Steel  for Scaffolding

  • Material :Q235 carbon steel

  • Surface treatment :Hot dip galvanized,Pre- galvanized

  • Main Components :steel with hook

  • Ladder Beam 300*3000 Q235 Carbon Steel  for Scaffolding CNBM

  • Ladder Beam 300*3000 Q235 Carbon Steel  for Scaffolding CNBM


  • Ladder Beam 300*3000 Q235 Carbon Steel  for Scaffolding CNBM

  • Ladder Beam 300*3000 Q235 Carbon Steel  for Scaffolding CNBM

  • Descriptions of Ladder Beam 300*3000 Q235 Carbon Steel  for Scaffolding

  • Taking the method of CO2 shielding gas and galvanized surface treatment, Monkey Ladder services a long life with an excellent corrosion & rust prevention ability. The high safety and competitive quality its non-skid and low weight design brings make it widely used in many construction sites.

  • CO2 shielding gas technology product, anti-corrosion and rust.

  • Galvanized treatment design, cost control,ADTO's excellent independent research product.

  • Standard Monkey Ladder, an indispensable safe platform for construction work acceleration.

  • More stable with anti-skid design.

  • Lighter material, energy saving and environment friendly.




FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the vertical force of scaffolding
The maximum reaction force of the rod support is calculated, and the maximum bending moment and deformation are calculated under the most unfavorable load arrangement1 load calculation2 Calculation of bending strength: maximum bending moment calculation for large bar weight uniform load and load distribution of the bending moment and the most unfavorable value3 deflection calculation: the maximum deflection is considered as the calculation of the load distribution of the load and the load of the large span
Q:I would like to ask how much scaffolding steel prices
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
Q:scarlet letter need help with identifying symbols(scaffold,forest,bush,and letter) PLEASE!!!!?
I for irritable Good thing we're not traveling around together. We'd get in a heap of trouble, lol
Q:Scaffolding scaffolding erection norms which requirements, who can say?
Scaffolding operators must be qualified through the examination of professional personnel, should be held on the card and do a regular physical examination, the operator must wear a helmet, fasten the seat belt, wear non slipIn the process of using frame control load less than ZkN/mZ2kN/ square meters, the prohibition of arbitrary demolition wall connecting rod and other safety facilitiesEach component and frame tube of the cantilever frame must be transmitted to the ground in timeWhen the shelf is removed, a fence or warning sign should be set up around it, and someone should be assigned to guard itFasteners and steel pipe diameter matching use, and the factory certificate. It is found that there is crack, deformation, the prohibition of the use of silkThe erection of temporary power lines and the grounding of the suspension frame and the lightning protection measures shall be carried out according to the national standards
Q:Painters on a scaffold physics help!!?
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:How much is the amount of material used to build a square meter double row scaffold? Urgent!
I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Landlord can refer to
Q:Bowl buckle type steel pipe scaffolding should set up a few people
What are the form and structure of bowl buckle scaffold?Composition formA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.
Q:What is rolling scaffolding?
well rolling scaffoled is just what it says,its rolling scaffold.Some scaffold is set up in a way it is not movable,its ushally attached to a structure ,for safty.a rolling scaffold although its not as stable as attached ,its movable,it can be rolled along the area needed to be worked,often with men staying on it while its rolled.
Q:Division.. Scaffold method?!?
use a calculator you punk, nobody writes out division anymore, grab your ti-84 and type it out... there's your scaffold method jerk.
Q:When scaffolding is erected on the base of the permanent structural concrete
5.2.5 scaffolding engineering A. structural parts (1) structural parts selection and calculation basis

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range