Kwikstage scaffolding system Standard AS1576

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Packaging & Delivery

Packaging Detail:In steel pallets and steel cage
Delivery Detail:15 days

2.Specifications

Quality kwikstage as per Standard AS1576 with components of:
standard,ledger,transom,stair,base jack,diagonal braces.etc

3.Picture of kwikstage

Kwikstage scaffolding system  Standard AS1576

4.We have organized several common questions for our clients,may help you sincerely:

1Can we provide different size of Frame system Scaffolding as customer need

The answer is Yes, customer can provide the Tec spec to us and Drawing for production.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for the construction of the scaffold eye in the building?
SelectionThe project uses 48 mm, 3.5mm wall thickness steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, etc.. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness of steel pipe and the corresponding fasteners, mainly with 1 x 1.0m, 1.2 x 1.2m, 1.5 x 1.5m and other specifications. Foot board mainly 2M and 3M two.
Q:What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
(2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The entire frame cannibalize speed is 3 ~ 5 times faster than conventional, faster effort to fight demolition, workers with a hammer to complete all assignments, to avoid the inconvenience caused by bolt operation; (3) with strong: the main components are the ordinary steel tubular scaffolding steel pipe, steel pipe connecting fastener with general availability in general, strong.
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:Classification and erection of scaffolding and related specifications
2, scaffolding construction should be appropriate qualifications for safety in production permit in accordance with the construction of the scaffolding for the implementation of special case of Wu erection qualification prohibited the construction team to set up construction, 3 steel tubular scaffolding steel tube, fastener, wall fittings etc. shall be in accordance with the "construction of steel tubular scaffold Safety specifications" (JGJ130-2001) requirements and factory certification, inspection report inspection qualified components for 4 steel tubular scaffolding, scaffolding operations engineering supervisor should strengthen inspection found the construction according to the special case of the implementation of existing safety accidents should be in accordance with the relevant provisions of the written instructions and construction units ordered rectification or stop two, construction scaffolding technology standard 1 basic requirements, the pole base (base plate) a malleable cast iron manufacturing and welding base two erection scaffold Wooden plate paving base pole again put into the base plate in the bottom area of the calculation and should be less than 2 degrees, the thickness of 50mm to cross the wooden shim plate adopts steel plate 2, using plywood as cantilever scaffold cantilever beam layer cantilever scaffold with cantilever beam or cantilever frame with steel cantilever beam should be prohibited (I-beam, channel) made of cantilever frame made from steel tubes connected by the fastener 3, operation layer, protective railing railing ramps block baseboard shall be erected outside the pole inside; rail height should be 1200mm; the railing height should be 600mm; in 180mm4, the block foot height should be within the framework of closed scaffolding laying scaffold should be at least two layers. Operation layer protective layer operation layer protective layer of scaffold safety net fallback
Q:Scaffolding stuck, need ideas for removing.?
WD 40, angle grind off what you can.
Q:What are scaffold spanners used for?
Ratchet Podger Spanners...Aluminium Scaff Spanners Spanners are wide wrenches that are made from durable metals. Spanners are made specifically for scaffolding and are designed to fit into the tool belt nicely. Spanners are very useful for a number of jobs and are often used along with other scaffold tools on a safety lanyard to prevent dropping the tool to the street below. Spanners work the same as traditional wrenches but like many scaffolding tools are made with a hole in the end of the wrench for the safety strap to be inserted through. Stainless steel and aluminum are the most commonly used metals for spanners to ensure durability even if the item is dropped from high.
Q:What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
ummmm oh i got a good one i hope and that is to build the world's largest bee's hive. plus they make more honey and i would have tons of money, pretty sweet isn't it.
Q:can anyone tell me if it is true that the scaffolding on york minster has to stay there for political reasons?
Eee, by gum, Petey.....all ye hed te do wuz GOOGLE scaffolding on york minster, in'it? And y'eed a learned they's FIXING it reckon on it tekkin 'em ten year or moore!
Q:Can a person get electrocuted if he's holding an exposed wire in one hand and metal scaffolding in the other?
I'll assume you mean a LIVE wire, AC. 1. If there is no connection to ground at all, NO. Birds can sit on live wires. 2. The current will flow from wire through body and scaffold to ground, then from ground through scaffold and body to wire, reversing at a rate of 60 times per second (America). Depending on the voltage on the wire, that person will most likely die or even be burned apart.
Q:what is scaffolding in early childhood?
Scaffolding basically means being the support (a scaffold is a support) in the child's learning. A preschooler can do a range of things. He or she will have mastered some things already and there will also be things that are beyond what he or she can do. When playing with the preschooler, you want to make sure that what's going on falls in that range (zone of proximal development). Don't give him or her something that's too easy or too hard to do, but play games that make them think a little and use what he or she already knows to take it a bit further. I hope I'm not confusing you more. In one sentence..scaffolding is supporting the child in learning something new based on what they already can do or know.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range