JLP6010-8ton ToplessTower crane for construction site

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

 

Description of  TOWER CRANE JLP6010-8ton

1) JLP6010-8ton tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

 

SPECIFICATION of  TOWER CRANE JLP6010-8ton

  • Max. working range 60m, tip lifting weight 1.0T and Max. lifting weight 8T.

  • Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

  • Trolleying mechanism can provide two operation speeds.

  • Free standing height (m) 42

  • Max height with attachment (m) 200

  • Working range can be adjusted(m)60/55/50/45/40

  • Min working range(m)2.5

  • Max lifting capacity(t) 8

  • Tip load @ 60m(t)1.0


Packaging & Delivery of JLP6010

40HQ container

25~30days after deposit







Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do US Navy Boatswains Mates Operate Cranes?
In the latest update to the NEOCS Manual Vol II (NECs) I no longer see an NEC for BM for Crane Operator. Volume II Navy Enlisted Classifications (NECs) NAVPERS 18068F April 2011 NEC Chapter 4 RATING SERIES AND SPECIAL SERIES NECS www.public.navy.mil/bupers-npc/re...
Q:How illegal is it to climb a crane?
Not at all if you don't get caught. However cranes are private property, you'll get your a.ss handed to you if you get caught.
Q:Paper cranes... What do I do?
Okay - so if you can't string them from the ceiling - than what I would do is buy some round vases/globes, from Pier one or some place like that, and fill them with paper cranes, then set the bowls on your shelves/windowsill/desk/table or other flat surface. I've enclosed some examples below. You can also make a mobile by hanging something like a super strength hook with adhesive. 3M makes them (the same folks who created scotch tape). The adhesive does not damage walls and you can stick them to anything. They can bear up to 30 pounds of weight. Put a few on your ceiling or walls and hang your mobiles from them.
Q:What is the email address for the cartoonist Brian Crane?
Brian Crane Cartoonist
Q:how to make a wired crane robot?
There are different attachments that you can put on the end of your crane to pick up this block. You can make a set of forks (like a forklift) that would slide under the block (block would have to be elevated on a skid). You can pick up this block with a suction cup. You can also pick up the block by clamping the sides of the block by replicating a scissor type mechanism.
Q:How long would it take to make 1,000,000 paper cranes if making one takes 7 min & 11 sec?
If it takes 7*60 + 11 = 431 seconds to make 1 crane, then making one million would take 431,000,000 seconds. There are 3600s*24hr*365.25d = 31,557,600 seconds in an average year. Dividing 431 million by this gives a little over 13 years, with a remainder of 20,751,200 seconds. There are 3600*24*30 = 2,592,000 seconds in an average month. So that gives 8 months with a remainder of 15,200 seconds. There are 3600 seconds in an hour, so that gives 4 hours plus 800 seconds. The 800 seconds = 60*13 + 20 = 13 minutes, 20 seconds. This works out to 13 years, 8 months, 4 hours, 13 minutes, and 20 seconds. Though answers can vary depending on how many days you define to be in a year, and how many days in a month.
Q:How to build a electromagnetic crane?
its pretty basic tech, first of all you need a crane then you need to attach an electro magnet, the magnet is comprised of copper cable wound into a circular shape inside an iron casing (it would work just as well on the outside of an iron disk but the cable would be damaged and the magnet would stop working) the more winds the cable has the stronger the magnet, next the two ends of the cable are connected to a power source (negative and positive) turn the power on to activate the magnet turn the power off to deactivate it..... simple really
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
First of all, your engineering structure is reinforced concrete Or steel? What's the weight of the lift? The lifting capacity of tower cranes should meet the needs. Generally speaking, steel structure hoisting, tower crane of the largest lifting weight and gravity moment should be large; hanging steel reinforcement of a smaller can.Secondly, the boom length should be covering the scope of construction (can also be arranged to meet several sets of crane lifting coverage). But in the 360 level luffing jib range, can not have obstacles (other cranes and buildings), and the boom and the distance between them (below) should be not less than 2m.Third, in the construction project is relatively high, the site is relatively small, you can mount the internal climbing tower crane. Building covers a large area, sometimes one can solve the problem. Of course, it is more troublesome to disassemble and lift inside, but the standard section used is less and the cost can be lower.
Q:What company makes a good engine crane I can order online?
I would suggest going to Harbor Freight or Oreilley's auto parts... they both should have them at at very reasonable price...if you order online it wouldnt be cost effective due to the shipping and handling added on to the price.
Q:how does the power electronic drives employed in cranes?
Most large cranes run electrical motors. Depending on what power is available at the site, the crane may run from a generator or be powered by the grid. The power requirements depend on the size of the crane. Larger cranes may use a six-pole, three-phase, one-wye, 440-volt circut. Smaller cranes could use a three-phase 220-volt circuit.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range