JLP6010-8ton ToplessTower crane for construction site

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

 

Description of  TOWER CRANE JLP6010-8ton

1) JLP6010-8ton tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

 

SPECIFICATION of  TOWER CRANE JLP6010-8ton

  • Max. working range 60m, tip lifting weight 1.0T and Max. lifting weight 8T.

  • Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

  • Trolleying mechanism can provide two operation speeds.

  • Free standing height (m) 42

  • Max height with attachment (m) 200

  • Working range can be adjusted(m)60/55/50/45/40

  • Min working range(m)2.5

  • Max lifting capacity(t) 8

  • Tip load @ 60m(t)1.0


Packaging & Delivery of JLP6010

40HQ container

25~30days after deposit







Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What does tower crane jacking up mean?
Attached tower crane upper work structure and the lifting sleeve frame connected to the lifting sleeve frame is installed on the lifting jack.
Q:What kind of bodies are tower cranes made of?
Tower crane is composed of three parts: working mechanism, metal structure and power unit, and control system. The composition and function of the three parts are outlined below.
Q:What's the japanese words for crane, flower, butterfly, cherry blossom, and sword?
Japanese Word For Butterfly
Q:how to pass a crane practical test?
The same facilities that offer the tests generally offer times when the cranes can be used for practice. Try calling the testing center. If they don't offer it there, they'll tell you where. Sometimes jobs will offer to pay for the practice sessions. You should asks about that too. You should also be prepared to pay for it yourself.
Q:How to improve tower crane industry in china?
Powerful okorder.com) manufacturing standards according to the rules of tower crane industry market economy.    Manufacturing industry is a huge system, the formation of a broad face, not one or two companies can do a good job. Powerful alliances to promote the group is a good idea, but it can not Arbitrarily arranged association, we must do things according to the market economy laws. A lot of problems are not necessarily be resolved by the professional industry, you can use the cross-industry solution.
Q:Deeper meaning of this Stephen Crane poem?
Here is an interpretation: 1. ...the pathway of truth...was thickly overgrown with weeds. The path to truth was overgrown. Crane is explaining that few people try to find truth. Instead, they are influenced by the ideas and opinions of others. 2. ...each weed was a singular knife. Truth is difficult to find. To find truth, you have to endure cultural torture. 3. 'Doubtless there are other roads. The wayfarer is not taking the easy way out. When he finds the path to truth, he contemplates whether or not to walk down the path. He sees the weeds. He sees the knifes. Then he thinks, should I go back home or walk down the path. He realizes that there is only one path to truth, and decides to walk down the path. The poem has a similar theme to Robert Frost's The Road Less Traveled. In that poem, the main character also shows reluctance in taking the less traveled path.
Q:Poem about killed cranes?
The Crane and The Crow'-Aesop's fables The farmer threw the stone at the crane and broke both his legs. The injured crane said to the crow, What has become of your God-given prophecies? Why didn't you warn me that his was going to happen?
Q:how do they make those tall cranes so TALL?
piece by piece.
Q:How do I make the best paper crane?
How okorder.com/
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
First of all, your engineering structure is reinforced concrete Or steel? What's the weight of the lift? The lifting capacity of tower cranes should meet the needs. Generally speaking, steel structure hoisting, tower crane of the largest lifting weight and gravity moment should be large; hanging steel reinforcement of a smaller can.Secondly, the boom length should be covering the scope of construction (can also be arranged to meet several sets of crane lifting coverage). But in the 360 level luffing jib range, can not have obstacles (other cranes and buildings), and the boom and the distance between them (below) should be not less than 2m.Third, in the construction project is relatively high, the site is relatively small, you can mount the internal climbing tower crane. Building covers a large area, sometimes one can solve the problem. Of course, it is more troublesome to disassemble and lift inside, but the standard section used is less and the cost can be lower.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range