JL7034A Topkit Tower crane for construction site

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

 

Description of  TOWER CRANE JL7034A

1) JL7034A tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

 

SPECIFICATION of  TOWER CRANE JL7034A

  • Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 16T.

  • Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

  • Trolleying mechanism can provide two operation speeds.

  • Free standing height (m) 60

  • Max height with attachment (m) 200

  • Working range can be adjusted(m)70/65/60/52/48

  • Min working range(m)2.5

  • Max lifting capacity(t) 16

  • Tip load @ 70m(t)3.4


Packaging & Delivery of TC7034

40HQ container

25~30days after deposit












Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Where can i read Cape Hatteras by Hart Crane online?
I okorder.com/.. Try searching lines from the poem if that doesn't work for you like imponderable the dinosaur sinks slow.
Q:How to build a basic electric magnetic crane.?
To push an object away, you need equipment that is low to the ground when it applies the force. Bulldozers are designed to push objects. Electromagentic cranes are designed to deal with vertical forces, so they are used to lift and drop metal objects. They use electricity to flow through coils wrapped around a metal core to generate a strong magnetic field. Trying to use them to push things could cause a crane to tip over since they are not designed to deal with horizontal forces. Even if you could get the electromagnet wired to repel metal objects, when you bring the electromagnet near the object, it would repel away in an unwieldy manner because of friction and interference with the ground. And trying to direct a large electromagnet at the end of a long chain would be difficult.
Q:A crane lifts a load of 3000 kg to a height of 8.5 meters in 15 seconds?
The work done (W)= Force*Distance. Force is 9.81*3000kg. So W = 9.81*3000*8.5 = 250,155 J Power (P)= Work(W)/Time(t) = 250,155/15 = 16,677 W 60% efficiency means that the lift is only using 60% of its maximum amount of power output. So to find 100% (lets call it x) of the crane's efficiency, consider the following: x * 0.6 = 16,677 x = 16,677 / 0.6 = 27,795 W Total mechanical energy in a system remains constant, so the kinetic energy the moment it hits the ground equals the potential energy when it is still hanging in the air. Potential energy = mgh = 3000x9.81x8.5 = 250,155 J You know this is correct, because it is the same amount of work the crane performed on the object to lift it.
Q:how to say no to my child who wants to keep a pet? crane fly.?
Hi!! wong-say Why say no? Just put on in a jar and tell the little chap that they have to stay out side in the fresh air. then it will fly away and the matter is over plus the lad has learned that it is impossible. everyone is happy then.
Q:how do they erect cranes? has anyone seen one go up?
I okorder.com you may find an article mate
Q:HOw to classify tower crane?
From okorder.com/ are divided into upper rotary tower crane and lower tower crane two broad categories.In which the carrying capacity of the former is high than the latter, in many Construction sites the tower cranes we have seen are On a rotary festival add up on the top of a high tower crane access. According to whether the move can move,tower crane are divided into: walking a line, and fixed ones. The fixed tower crane do not switch, installed in the block of concrete baseBasis, or installed in the form of X-shaped concrete foundation. In the housing construction generally use a fixed style.
Q:Cranes or storks?
Depends on where you live ? Stick to Ornamental Pheasants or Ducks,Storks and Cranes,need to be penned in at night because you will have to pinion them to prevent them flying. Try some Golden Pheasants for a try ,Lady Amherst are becoming a rare commodity and are quite expensive,if you have Foxes and Mink,then no matter what you get you will have problems these two predators.
Q:kelsey grammer as dr. frasier crane or richard belzer as det. munch from 'homicide' and 'law and order: svu' ?
Kelsey, his role has been going on since the late 80's. I love him!
Q:Air Hogs Fly crane wont fly?
Good okorder.com, Funtastic Customer Service Team
Q:Can the attached arm of the tower crane be welded?
The calculation of the attachment of tower crane mainly includes three parts: attachment rod calculation, connection calculation of attached bearing and calculation of attached frame. (1) the attachment bar calculates the attachment bar and is calculated by the compression member of the pivot shaft hinged at both ends. 1) the internal forces of the attached rod and the internal force of the connecting rod are taken as required by the instruction; if the specification does not specify, or when the spacing between the two supports connected with the building is changed, the calculation shall be carried out.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range