• JL6518 Topkit Tower crane for construction site System 1
  • JL6518 Topkit Tower crane for construction site System 2
  • JL6518 Topkit Tower crane for construction site System 3
JL6518 Topkit Tower crane for construction site

JL6518 Topkit Tower crane for construction site

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

 

Description of  TOWER CRANE JL6518

1) JL6518 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

 

SPECIFICATION of  TOWER CRANE JL6518

  • Max. working range 65m, tip lifting weight 1.8T and Max. lifting weight 10T.

  • Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

  • Trolleying mechanism can provide two operation speeds.

  • Free standing height (m) 56

  • Max height with attachment (m) 205

  • Working range can be adjusted(m)60/56/50/44/38

  • Min working range(m)2.5

  • Max lifting capacity(t) 10

  • Tip load @ 60m(t)1.8


Packaging & Delivery of TC6518

40HQ container

25~30days after deposit










Q:I want to join
www.okorder
Q:Please try to give information on the questions bellow: .What the climate was in the Japanese Crane's habitat (high, lows, averages, precipitation) . Plants in the Japanese crane's habitat .2-3 major animals in its habitat .2-3 minor animals in its habitatTHANK YOU SO MUCH!!! .
in the east Hokkaido, the north island of japan. some japanese crane in russia goes to north korea in winter, but cranes in hokkaido stay all through the year.
Q:I used crane to fly me to the korean folk town area. im abck in the station that crane is at but i get up to reach crane. Is there a portal in town or a place i jump to? Please help!!
I don't really understand what you're saying, but I'll try to help. You can only enter the crane every few minutes or so (I'm not sure of the exact time). When the crane is closed, there will be a gray door barring the way. When it is open, it will have a greenish-yellowish open doorway. You have to wait for it to arrive and open.
Q:What are the types of cranes?
Three, crane according to the way of operation is divided into fixed and mobile. (1) tower cranes and cantilever cranes belong to fixed cranes. (2) bridge cranes, tire cranes, crawler cranes and railway cranes belong to mobile cranes. Mobile cranes are divided into rail and trackless two. Bridge crane is rail type, caterpillar and automobile are trackless. For example, the search network, the address is xxko, followed by com remember Oh, because this site is also facing the world, if you want to know a certain brand of crane, can look at its official website, this is also the line.
Q:if the crane starts out at ground level and the skyscraper is being built next to it, how does the crane get moved to the top of the building once the skyscraper has been built to the level of the top of the crane? (eg: the crane can reach a height of 30 stories but the building being const. is 100 stories)
It is usually self-hoisting. There is motor and gear assenbly that lifts the crane within the tube (usually a future elevator shaft) the is constructed around it. Then it is bolted down and goes back to work.
Q:we have a project starting that will require a stack built 1km high in the air?How will they install this?
Build form the top, when they build these huge cranes, they build the top section, lift that up and build the next section underneath it, set it down to release the lift off the top section and lower it to the second section. Lift those 2 sections from the bottom, build the third section underneath it, and so on. You need to lift securely, like on all 4 sides for stability, and that leaves the corners free to build the next section.
Q:Is stature of the crane a Japanese, Chinese, or Okinawan form?
Found in kata from all 3 sources okinawan japanese and chinese .GANAKAKU KATA in shotokan CHINTO in okinawan kata and in FUKIEN CRANE STYLE for chinese. GANAKAKU means crane on a rock.
Q:Brief introduction of ten no hanging criterion for tower crane operation
8, oxygen acetylene generator with explosive materials are not allowed to hang; 9, mechanical safety device failure or sick when not hanging; 10, bad weather, more than six winds not hanging.
Q:My husband and I will be going to the Crane Resort in Barbados for 3 nights in January. Just wondering, will we need to rent a car or is everything we need to see right there on the beach. Past Crane visitors or even Barbados civilians, please respond. Thanks :)
The okorder / If you only are focusing on relaxing at your resort/beach then renting a vehicle is not necessary.
Q:in the karate kid 1984 is the crane kick something they just put in the movie and not real ?
The Crane kick is an actual Martial Arts move it is done in some Hung Ga Kung Fu forms but differently than the one in the movie because it is done without jumping and is much faster the crane kick in the Karate Kid is just a figment of the director and screen writers imaginations.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords