JL6518 Topkit Tower crane for construction site

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:


Description of  TOWER CRANE JL6518

1) JL6518 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator




  • Max. working range 65m, tip lifting weight 1.8T and Max. lifting weight 10T.

  • Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

  • Trolleying mechanism can provide two operation speeds.

  • Free standing height (m) 56

  • Max height with attachment (m) 205

  • Working range can be adjusted(m)60/56/50/44/38

  • Min working range(m)2.5

  • Max lifting capacity(t) 10

  • Tip load @ 60m(t)1.8

Packaging & Delivery of TC6518

40HQ container

25~30days after deposit

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is there a real life Frasier Crane?
The okorder.com/
Juan carlos Have no idea, but I see an answer where it looks like you got the help you need. Do not give me Best An-So. Best Wishes to you
Q:Why is house walking with a crane? Is he disabled? How did he get disabled?
lol i was just watching house right now. He got in a car accident and crippled one of his legs and can hardly walk on it sooo he needs a cane. hope it helps
Q:How are construction cranes built in the first place?
The first crane generally arrives on a trailer or on it's own wheels.
Q:What is YOUR take on Louis Crane's idea of meduso-anthropic principle?
Well Im not into quantum physics much these days, but in his book Life and Light Lee Smolin proposes that if the quantum theory of gravity has two special features the universe would fine tune itself! If we perturb a Kerr-Newmann black hole so that the new universe will really form on the other side, and that the constants of nature might fluctuate in such a process so that the new universe would have sightly different physics than our own. Its well over my head at this stage; cause Im just an N.Y.U.K. graduate! NYUK NYUK NYUK Anyone wants to read up on it can go to the link below.
Q:Climbing process of an internal climbing tower crane
The tower is sleeved on the ladder climbing, lifting hydraulic cylinder is articulated in the body of the beam, and the lower end (piston rod end) the middle beam is hinged on the activities. The two sides of the tower are provided with legs, and the two sides of the movable beam are also provided with legs, and the two supporting legs are alternately supported on the ladder steps so as to cause the tower to rise.
Q:How come you never see cranes being transported from one site to another?
because they move so slow its hard to tell if there moving or not.
Q:Notice of tower crane
Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
The lightning resistance of tower crane (tower crane) on the construction site shall be no more than 4 ohms.I. tower crane GB/T 5031--20085.5.5.9 lightning protectionIn order to avoid lightning stroke, the main structure of the tower crane, the motor frame and all the electrical equipment metal shell, wire metal protection tube should be reliable grounding, and its grounding resistance should be no more than 4 ohms. When multiple repetitive earthing is adopted, the grounding resistance shall be no more than 10 ohms.Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
Q:What courses should I take to buy the tower crane to be installed?
First in, in construction projects, and so on arrival booking use state, from the construction project into fixed assets. Increase in fixed assets, depreciation from the beginning of next month

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range