• JL6016-10ton Topkit Tower crane for construction site System 1
  • JL6016-10ton Topkit Tower crane for construction site System 2
  • JL6016-10ton Topkit Tower crane for construction site System 3
JL6016-10ton Topkit Tower crane for construction site

JL6016-10ton Topkit Tower crane for construction site

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

 

Description of  TOWER CRANE JL6016-10t

1) JL6016 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

 

SPECIFICATION of  TOWER CRANE JL6016-10

  • Max. working range 60m, tip lifting weight 1.3T and Max. lifting weight 10T.

  • Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

  • Trolleying mechanism can provide two operation speeds.

  • Free standing height (m) 56

  • Max height with attachment (m) 205

  • Working range can be adjusted(m)60/56/50/44/38

  • Min working range(m)2.5

  • Max lifting capacity(t) 10

  • Tip load @ 60m(t)1.6


Packaging & Delivery of TC6016-10

40HQ container

25~30days after deposit









Q:I loved Dr. Crane and his sexy glasses and eyes. Plus, I just love Cillian Murphy, haha. Is his character back in the Dark Knight, I heard he was...but I was wondering if anybody could confirm it?
Dr Crane Scarecrow
Q:Is a mobile crane allowed to operate in an inclined plane?
NO, absolutely not. If the machine is not level, it could fall over. The only way, if it has to be operated on an incline, is if the machine has leveling jacks such as many modern, mobile cranes have.
Q:What is the safe distance of a tower crane to the surrounding buildings?
JGJ160-2008 "construction site mechanical equipment inspection technical regulations" on the 46 page clearly written, safety distance shall not be less than 0.6 meters,
Q:In the U.S. please and tell me where and how you got the number.Thanks!!!
There are so many overhead cranes in operation today in the US and around the world. They could be numbering in tens of thousands in industries and other operations. An overhead crane, commonly called a bridge crane, is a type of crane found in industrial environments. An overhead crane consists of parallel runways with a traveling bridge spanning the gap. A hoist, the lifting component of a crane, travels along the bridge. If the bridge is rigidly supported on two or more legs running on a fixed rail at ground level, the crane is called a gantry crane (USA, ASME B30 series) or a goliath crane (UK, BS 466). Unlike mobile or construction cranes, overhead cranes are typically used for either manufacturing or maintenance applications, where efficiency or downtime are critical factors. Have a pleasant day.
Q:I'm a bit confused as to what happened to him. I guess I skimed a bit at a certain important part of the book. When Seneca Crane's name was written on the dummy during training, why did the people gasp at the name written in berry juice? What happened to him? PS. I am at the begining of Mockingjay. So no spoilers please. (:
In the end of the first book, he was put in a room with a bowl in the middle. In the bowl, there were berries. Very deadly berries. This is significant because in the arena, Peeta and Katniss threatened the Capitol that they would eat them and kill themselves. If that happened, there would be no victor. President Snow wanted Seneca Crane to kill them. But Seneca Crane let there be two victors, instead of one or none. So, back to the point. Seneca Crane was punished because he couldn't listen to the president's orders. So, he was put in a room with no food, water, etc. If he got hungry he, he had to eat the berries. So, he died. I don't know how you missed that, but I hope this helps! :) I LUV U PEETA!
Q:I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q:i read this comment on youtube about people making 1000 paper cranes for japan is this a real thing like can i make paper cranes and mail them to some place if anyone knows the details you would be helping me out because i already started making paper cranes and its such a small but beautiful thing plz help
nicely first of all, i notably advise that purchase some Anti-Pope spray basically in case you have jesus christ knocking at your door. Then i opt to advise which you're making a cake. ideally , a banana, because it quite is my typical. And deliver it to me in the mail. via now, i'll bless you that your place and family individuals besides as acquaintances, are all wanted nicely and which you're no longer killed from one in each of your paper cranes stabbing you in the attention. I additionally advise getting life coverage. God purely is familiar with how sharp paper is and it rly rly hurts. Then devour some poultry, Avacado Sushi via fact each physique is familiar with it quite is techniques nutrition. I end off via commending you and via saying. See you on monday.
Q:In the Legend of Sleepy Hollow Ichabod Crane has come from?
In 1799, young constable Ichabod Crane is sent from New York City, New York to the fledgling settlement of Sleepy Hollow to investigate a series of ghoulish murders.
Q:like a really really clear set of instructions. or a video. but evrything i have tried confused me.
This okorder
Q:How many tons are tower cranes QTZ125?
Nominal lifting torque KN ? m 1250Rated lifting torque KN ? m 1300Maximum lifting weight T 8Operating range M 3~60Maximum rated lifting weight t 1.5Maximum lifting speed m/min 80The lowest steady decline speed of m/min is less than or equal to 7Lifting performance two rate lifting speed m/min 80405.6Lifting weight t 248Four magnification lifting speed m/min 40202.8Lifting weight t 488Variable speed m/min 52/26/8Slew speed r/min 0.63Lifting height independent type M 50Attached m 170Design weight t 42.7 (stand height)Counterweight t 21.2The working environment temperature is Co -20 to +40Maximum working wind speed is m/s 20The maximum wind speed at ceiling is m/s 13

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords