JIS Beam Clamp ¢48.6

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

JIS Type (48.6 ) Pressed Scaffolding Coupler for Pipe Connecting

. High Quality

. Fast Delivery

. Competitive Price

. Excellent Package

. Good Service

Weight

980g

Certification

ISO9001, EN74,SGS,BS1139

Electroplating

Electric Galvanized Hot Dip Galvanized

Payment

T/T, D/P, LC at Sight

Package

Box and Wooden pallet

Port

Taizhou, Shanghai


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I would like to ask how much scaffolding steel prices
Hello, you ask this question is not answered, you are building it, I am here to help you check a lot of information on the Internet, here to share with you, you can look at the reference price, the price there is no uniform standard, each region is different, the price is for reference only. Practice has proved that the new scaffold not only safe and reliable construction, installation speed, and the amount of steel scaffolding can be reduced to 33%, disassembly efficiency is improved by more than two times, the construction cost can be decreased, the construction site civilization, clean and tidy.
Q:Industrial / scaffold piercings - pierced with rings?
yeah that is a better idea. it prevents the bar from getting ripped out, rejecting, and generally makes it less likely to get caught up in your hair while it's still sore.
Q:Classification and erection of scaffolding and related specifications
1, the height of the super 24M drop steel scaffolding; 2, attached to the lifting of the scaffolding, including the overall lifting and chip upgrade; the 3, cantilevered scaffolding; the door scaffolding, scaffolding, the scaffolding, scaffolding, the scaffolding; the 5, hanging basket, scaffolding, scaffolding, and so on; 6;
Q:Scaffolding Piercing Help?!?
in my opinion you should ride it out and just clean it more often. not only will the piercings give you trouble if you try to change the earring now, the piercings themselves will move slightly and you won't be able to put an industrial bar back through it. if you can live with these go through with it, if not, wash often, rotate the bar constantly and avoid sleeping on it and getting your hair caught up in it. like you said, piercings in the cartilage are very sensitive and need time and nurturing so that they can heal properly.
Q:What Music Video did Garth Brooks Run Around Crazy on Stage, Suspend from The air and Climb the Scaffolding?
try ain't goin down till the sun comes up
Q:what is scaffolding in early childhood?
Maybe this will help: scaffolding is the support provided by adults working with a child to help promote and extend development of knowledge and skills. It can mean asking appropriate questions to help extend a child's thought process, or providing suitable activities to help a child learn through hands-on activities. Look it up in your textbook and read the definition and apply it to my explanation above for a deeper understanding, and don't be afraid to ask your instructor questions like this! That's what s/he is there for!
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.
Q:What are the requirements for acceptance of external scaffolding? Want to know before
7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure. 8, the erection of the scaffolding on the steel pipe, fasteners, foot board and connection points shall not be arbitrarily removed. When necessary, the construction site must be approved by the person in charge of the site and take effective measures. 9, the use of scaffolding, the site should be responsible for the organization of inspection and acceptance, acceptance and fill in the inspection form before use. In the construction process should be professional management, inspection and warranty, and periodic settlement observation, found abnormal should take timely reinforcement measures.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
The general price of 3800-4200 yuan per ton, you need to see the material and specifications.1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-
Q:Is it dangerous to get a scaffold piercing?
Getting piercings is not that dangerous except that a lot of normal people will think that you are a weirdo

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range