JCM916D Hydraulic Crawler Excavator Digger Mechanical Shovel

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

Excavators are heavy construction equipment consisting of a boom, stick, bucket and cab on a rotating platform known as the "house". The house sits atop an undercarriage with tracks or wheels. A cable-operated excavator uses winches and steel ropes to accomplish the movements. They are a natural progression from the steam shovels and often called power shovels. All movement and functions of a hydraulic excavator are accomplished through the use of hydraulic fluid, with hydraulic cylinders and hydraulic motors. Due to the linear actuation of hydraulic cylinders, their mode of operation is fundamentally different from cable-operated excavators.

Main Product Features:

  1. There are 3 pumps: the two main pumps are for supplying oil at high pressure (up to 5000 psi) for the arms, swing motor, track motors, and accessories, and the third is a lower pressure (700 psi) pump for Pilot Control.

  2. The whole machine has the elegant streamline design, reliable performance and high efficiency of working.

  3. Possess quality certification of ISO 9001:2000. Can pass CE test.

  4. A wide range of operating weight & bucket size for your choice.

  5. We can supply OEM service and can also produce according to your requirements.

Product Specifications:

Operating Weight: 14.1t

Engine: CUMMINS B3.9-C

Boom Length: 4.6m

Arm Length: 2.5m

Bucket Size: 0.63m3

       Operating Weight and Ground Pressure

Operating weight includes basic machine (with boom 4.6m, arm 2.5m, and bucket 0.63m3)

Shoe width


Overall width


Ground pressure


Operating weight



Q1: How to control the Excavator?

A1: The Excavator is equipped with the open-and-shut electronic monitoring system and fault alarm system, very easy and safe to control.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce some Excavator according to customers request?

A4: Yes, we can produce Excavator according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, if necessary, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.

JCM916D Hydraulic Crawler Excavator Digger Mechanical Shovel

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is an easy way to determine if a concrete block wall has been filled with cement? I want to demolish it.?
Drill holes through one of the blocks. If they are filled, you will have to work hard all the way through. If not, you will feel the drill go from the block to fresh air, then back into the block. Drill one fairly low down the wall to start with. It's less noticeable if you then decide to leave the wall in place, and drill holes can be easily patched with cement. Even if the blocks have had concrete poured in, if you are prepared to do a bit of work, hire yourself a SDS drill, or similar, and attack the joints. They will soon give way. If you take the wall down a couple or 3 courses at a time, the blocks will break up as they hit the floor. Please double check the wall is not load bearing before you start any demolition!
Q:Will somebody modify this deck for me?
try getting ironchain dragon x3 every time it inflicts damage your opponent must discard 3 cards from the top of their deck but its pretty good so far 4/5
Q:Physics Help Please!!???!!!?
mass = Force/acceleration Force = 2.25e5 N acceleration = 0.200 m/s² I refuse to believe that U need this calculated as U must have these skills to be in a course in physics
Q:do we have to pay for a bounced check if sercices not completed?
He can always take you to court and sue you.
Q:Is Nightmare by Avenged Sevenfold in the Call Of Duty Zombies map Moon?
Just keep in mind that this video is confusing because it follows two people. The person in the beginning downs themself over by the computers used for Step 1 of the Easter Egg. Then the video quickly switches over to his friend who completes the round and spawns him back. Also the video is crappy quality and the guy who posted it kept pulling up the guide to show proof of the achievement throughout the clip.
Q:Which expert knows the excavator of this brand of Singway?
Never heard of this brand of excavator.Sinoway is the Shipping Company Limited (Hongkong branch)
Q:how do you breed western fence lizards?
That is hard indeed. i had a pair for 2 years and they never ever mated. Substrate: Try to use the excavator burrowing clay. This is fairly easy to keep clean and if given proper care you should only need to clean it every 6 months. Another on is reptibark or a mixture of dirt and sand 4:1 (without fertlizer). Lighting: You should use a 5.0 UVB light. Like Repti-Sun 5.0. Try to keep the theme rainforest-ish. Don't use heat rocks because it will burn their stomachs. If using a ten gallon cage I recommend using a 25 watt spotlight as it is very weak and won't burn your lizards while still giving them the heat they need. Branches and hides can be placed in the tank. They will climb branches and these are good for basking. They will need the basking side to be of about 90 degrees and a cool side of 75-80 degrees. Other: Misting the cage once a day will keep them at a good humidity. Also give them a water dish that is deep enough for them to soak in. For feeding you can offer them mealworms, crickets, roaches, waxworms. They do not eat any vegetable matter. Clean the cage every 2 weeks.
Q:I need wiring diagram for eh215 new holland excavator free download?
search Holland eh215 wiring diagram/pdf You can print it out and save it.
Q:Should my husband hire some more presidential aides for me to stimulate the economy?
We could hire a crew of excavators to dig you out of the National treasury too!
Q:easy stump removeal?
Purchase some Stump out.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range