Itlian Solid Surface Bathroom Bathtub PB1003

Ref Price:
Loading Port:
Fuzhou
Payment Terms:
TT OR LC
Min Order Qty:
10 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Specifications

Stone Bathtub
1.Environment-friendly solid surface
2.Finish:matte/glossy white
3.OEM is available here

Itlian Solid Surface Bathroom Bathtub PB1003

 

  

Advantage:

 

-Latest modern acrylic table top basin; 

 

-Enviromental-friendly Material: Solid, non-porous and homogeneous surfacing material 

-Pure Acrylic and Modified Acrylic are offered here 

 

-OEM: We have professional R & D team, can be customized according to your requirement

 

-Order with customer’s trade mark(logo) are welcome

 

 

Experienced workmanship 

 

1.Our R&D team have experience of designing suitable products.

 

2. We can aslo make according to your needs. Your idea is warmly welcome.

 

Product Information

  

Product CodePB1003
Specification1800x925x630mm
Packing1 Pc./CTN.
Packing SizeWood crate  1920x1050x780mm
Finish (color)Matt White/Glossy White
OverflowYes/No
DrainIncluding
N.W.200 kg
G.W.150 kg
CBM1.57
Loading Ability17 Pcs./20'GP; 35 Pcs./40'GP; 43 Pcs./40'HQ
Guarantee10 years
Lead Time15-25 days, according to the order quanlity
Payment TermT/T, L/C
Loading PortShenzhen, Guangzhou
MOQ1X20'GP, sample order is also available
Packing MaterialFoam and Vacuum cotton inside,  standard export carton outside

 

1. Material: Modified Acrylic Solid Surface/ Pure Acrylic Solid Surface

2. Style: Free standing bathtub

3. Packing: Standard export carton with wooden crate

4. Color: Matt white/glossy white

5. Delivery Time: 15-25 days

6. Warranty: 10 years

7. Loding Port: Guangzhou, Shenzhen

8. MOQ: Trial order is acceptable

 

Packing Information 

 

Packing Material: The edge of the bathtub is wrapped by  Vacuum cotton for protection, also standard export carton with wooden crate packed outside.

 

Customizations:

 

1. Shipping Mark

2. Hangtag and Logo

3. External Artworks

 

Other Information:

 

Delivery time15-25days. Up to models and quantity.

Minimum quantity order: 1x20'GP container, mixed products is available.

Payment term: 30% deposit, and 70% balance should be paid before shipment.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Bathroom shower room installation, has been waterproof, and not shop tiles, is not this time buried stone base?
Stone processing: for the corner of the cylinder and can not be installed in the basin can be used as a stone-based water treatment, stone foundation can be embedded, embedded in the wall and the ground 1-2 cm, can also be paved the ground and then loaded stone Base, and then the shower room can be installed in the above, but please note that when the custom shower room to reduce the embedded part of the wall, stone-based artificial stone and real stone points. Direct use of the ground brick shower pockets: according to the size of the pockets provided, the pond surface is less than 2 cm on the ground floor, floor drain with stainless steel pieces, the overall effect is better and can avoid the wall, the cost is low.
Q:Shower room, glass interlayer and surface coating, which is more secure?
The first can certainly tell you that the sandwich is more secure than the film, the manufacturers may take into account the cost difference is too large, so do not want to engage in plastic. Laminated glass to do it, the quality of the poor, it is difficult to hurt people, because he will not fall off the glass fragments, and the cost of the film can control their own manufacturers, I would like to paste on the paste, I would like to paste on the paste Poor, you can not be around, so I suggest you strive to glue, or else to complain 12315, these two things is simply two grades of products, you have to be firm!
Q:What is the glass thickness of the shower room?
Door glass generally do 6mm thick (absolute strength enough), fixed glass to do 8mm
Q:What is the main choice of the shower room?
1, choose the brand: the brand of the shower room, because the shower room is a non-standard manufacturing services products, if there is no brand awareness, will not pay attention to the shower room of the election material manufacturing quality, do not care about after-sales service. 2, accessories material: a, the glass should be safe steel car-grade glass, high permeability and no steel processing heat pattern as well. Glass to Foshan Jinyao Hua's car-grade glass is best, Jin Yaohua factory tempered glass on the code, you can find in the Jinyao Hua website is genuine. B, aluminum if it is miscellaneous aluminum, brittle. It should be selected aluminum wall thickness is enough (1.2mm above), the surface of the miscellaneous points for the better; C, all the hardware accessories. Should choose stainless steel, with high precision as well. 3, waterproof treatment: shower room each site, especially the activities of the door and the fixed fan three sides need strict water treatment, no waterproof tape treatment, relying on glass overlap waterproof times. 4, shower room overall structure of the rigorous scientific:
Q:Shower room of the thickness of the retaining bar to be appropriate ah?
Shower room retaining bar is generally 40MM to 50MM high, thick is almost 30MM to 40MM. Are generally finished stone processing. Not expensive, generally in the 150 / mil. A shower room to block the water on the 1 meter wide. It is almost 200 dollars. You can go to Kai Li asked, their home shower room water effect done quite fine.
Q:Is there a shower room in the countryside?
As long as the bathroom space conditions permit, can be used
Q:Shower how to install ah, mainly asked how to set up hot and cold water pipe joints ah
1. The first step should be for the installation of the basin. For the installation of the basin, it is important that the water in the bottom basin is very important. If you keep the water, then the installation will have a great impact. At the same time the bottom basin and pipe connection, pay attention to solid, to prevent water leakage. Hose, you can adjust the distance as needed. 2. Use water to check to ensure the accuracy of the installation, and to ensure that the water can flow normally. And then followed by the drilling operation, used to fix the wall of the aluminum material. 3. Then into the fixed particles and other ingredients, and then the aluminum bar is fixed above the wall, and then will be used to fix the glass material in the bottom basin drilling place. 4. Drill a hole in the fixed glass, then install the mount, and then connect the jacking. Then it is for the installation of the shelves. We know that the shower room if you do not put the shelf, then go into the bath when the replacement of clothing is not good to put. 5. Install the activities of the door, you can save space, and push and pull will be more convenient. Then do good waterproof work between the glass. With glass glue to seal the need to seal the place is also sealed. 6. Then for the installation of the shower room to check, to ensure that the installation of the shower room waterproof normal, smooth drainage, can be used normally. If there is a certain lack of water and drainage, pay attention to the renovation, while the screw and the like to tighten out. And then remember to wipe the shower room with a rag.
Q:What is the installation of the shower room? How is the glass fixed?
You can use embedded, that is, before setting the shower room on the ground to put the marble back buried. This way is too much trouble, not easy to replace. You can also use glass adhesive paste, will buy back the retaining stone with glass glue and ground connection. This way no damage to the floor, easy to replace. Glass and ground water stone, if it is flat open the door will generally have the code, which requires drilling on the marble, there is a marble in the already opened a groove, this will be directly into the glass glass Glue can be.
Q:If you want to do the bathroom shower, from the wall to the shower room of the most peripheral only 80 cm, you can do it?
can. I do a little piece of glass in your window to do a little smaller, high and your windows as empty as high, And then put the shower connection screw on the piece of small glass.
Q:What is the door in the shower room?
In fact, aluminum door is good. The Now there are many models on the market. All the glass are nice ah. All the leaves are nothing necessary, because now the door has a hanging foot. And every bathroom has a fan ah. There are bathroom doors must buy good quality, you are not afraid of some, because the number of switches than any door should be more. The Pick some big sign it ~

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range