Iron Security Metal Door for Sale

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Packaging & Delivery

Packaging Detail:

Film enwrapped on surface,foam paper inside, strong carton outside.

Delivery Detail:

15 days after receiving the deposit

Specifications

1) Material:steel
2)Surface:heat transfer or powder coating
3)ISO 9001:2000, CE
4) quality warranty is for 10 years

steel door

Features:
1) Material: cold-rolled steel
2) Frame outer size (H x W):
a) 2,050 x 860mm
b) 1,970 x 860mm
c) 2,050 x 900mm
d) 1,970 x 900mm
e) 2,050 x 960mm
f) 1,970 x 960mm
3) Door panel thickness: 50mm ~ 70mm
4) Opening direction: inward / outward
5) Lock handle position: on left/right
6) Opening degree: 90/120/180 degrees
7) Accessories: hinges, locks, handles, peephole, anti-frozen rubber seal and etc.
8) Infilling: honeycomb material or polyurethane
9) Applicable for the entrance of houses or flats
10)payment way:30%T/T

11)Package:Film enwrapped on surface,foam paper inside, strong carton outside.
12)Loading:A 40 HQ container can load 280~370 pcs.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Bathroom aluminum door how to install
There are two kinds of toilet door installation method: Outer bag, door frame (door frame) on the outside of the wall; inner package, door frame (door frame line) inside the wall; 'wall' refers to the bathroom door Body (the general situation has a wall) Inner package: you can first affixed to the brick, the door frame lines can be partially covered due to the door side of the tile tricks do not homogeneous problem Outsourcing: 1, you can first affixed to the brick: according to paste the brick after the size of the door to the door, left and right to leave a certain gap (otherwise not into the fixed when you can play glass glue), to the first door There is a time difference) is paved when the need to master the size of the door, only big can not be small. 2, the door parts of the wall is not posted, the other can be posted: wait until the other large area paste, and then install the door, and then complete the rest. No matter what method, first installed after the door tiling, are a lot of inconvenience (such as to open the door construction, finished product protection) Above refers to the bathroom door for the finished door (factory custom) If the non-finished door (generally no box line), you can press the box after the shop and then install the door, but the package should pay attention to increase the height of the door, or when the door can not be installed, because the door is vertical Direction of the disassembly (note the location of the installation method)
Q:how can i cut a nice metal doors?
I would recommend that you get a new door rather than cut one to fit. I do not know of any professionals who would cut a door, too much labor intensive
Q:Aluminum doors and windows how to identify the thickness of the door?
There is no way to identify, it is impossible to remove the amount of the general are not enough!
Q:Aluminum alloy doors and windows of the aluminum wall thickness is better?
Aluminum alloy window national standard 1.4mm, aluminum alloy door national standard 2.0mm
Q:High-grade metal doors and windows ground
It is a very important measure to reduce the occurrence of fire, explosion, life hazard and equipotential in the space where lightning protection is needed. The equipotential is connected by means of a connecting wire or an overvoltage protector to the lightning protection device in the space requiring lightning protection, the metal frame of the building, the metal device, the outer conductor, the electrical and the telecommunication device. High-rise buildings must be reinforced concrete structure, steel structure of the building, should make full use of its metal parts to do lightning protection device, the metal as much as possible as a whole. Reinforced concrete components and steel structures in the steel should be connected to each other, the components must be connected between the electrical path, so that the entire building in the pressure. Therefore, metal curtain wall, aluminum alloy doors and windows design should be fully aware of the building's lightning protection devices and curtain walls, doors and windows of the lightning protection device outlet, and then determine a reasonable, economical, safe curtain wall, windows and doors mine design. Metal curtain wall, aluminum alloy doors and windows frame and other large metal objects, if the distance from the ground is equal to the ball radius and above, it should be connected with the lightning protection device, which is the first anti-side strike should take preventive measures. (The so-called ball radius is a sphere with a radius of Hr to scroll along the need to prevent lightning parts, when the ball only touched the flash device, or only touch the flash device and the ground without touching the need to protect the site, then the location To get the protection of the flash device).
Q:What are the colors of aluminum doors and windows?
Colorful, free to customize.
Q:What is the difference between the two types of full metal doors on a 81 cj-7?
The difference is in the headlights. The CJ 7 has a narrower set of headlights. You can also tell by the bumper. The CJ 7 has a metal bumper, whil the other doesn't.
Q:Aluminum alloy doors and windows material thickness how to choose
Yi shield doors and windows to remind you, the thickness of the material generally refers to the wall thickness of the material, aluminum doors and windows of the national standard is 1.4mm or more, but the actual life, 1.0mm is to meet the needs of the owners, the choice of doors and windows material thickness is the most important Look at the needs of the owners themselves. If you need to sound insulation good, naturally choose some thick thickness will be better.
Q:Aluminum alloy doors and windows 868 profiles production methods, know to pay the next.
Any series, any manufacturers, can handle, and even open their own mold can be
Q:Aluminum alloy doors and windows broken bridge and what is the difference between ordinary materials
Conventional aluminum alloy profiles because it is the whole body of aluminum alloy material, easy to heat the formation of thermal bridge effect The broken bridge aluminum alloy profile is based on the old aluminum alloy window in order to improve the performance of doors and windows insulation and the introduction of improved. Broken bridge aluminum alloy window principle is the use of PA66 nylon indoor and outdoor two-layer aluminum alloy is separated and closely connected into a whole, the connection can be divided into different ways to wear and type, with this profile doors and windows , Its superior heat insulation, completely solve the aluminum heat conduction fast, does not meet the energy requirements of the deadly problem, while taking some new form of cooperation with the form, completely solve the "aluminum alloy sliding window seal is not strict"

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range