Insulated Power Cable 0.6/1kV XLPE - CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 m
Supply Capability:
20000 m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


Specifications

1. 0.6/1kV XLPE INSULATED POWER CABLE

XLPE insulated power cable has a number of advantages over paper insulated and PVC insulated cable.XLPE power cable has high electric strength,mechanical strength,high-ageing resisting,environmetal stress resisting antichemical corrossion,and it is simple construction,using convenient and higher operating of long term temperature.It can be laid with no drop restriction.

Various of flame-retardant and non-flame retardant XLPE cable can be manufactured with three technology(peroxide, silane and irradiation crosslinking). The flame-retardant cable covers all kinds of low-smoke low-halogen low-smoke halogen free,and non-smoke nonhalogented and three classes of A,B,C.

Our XLPE power cable can be manufactured according to companys specification which is equivalent to IEC 60502,IEC 60332,and IEC 60754.Some of indexes are superior to above international standard IEC.

Some of special XLPE power cable can be manufactured according to the other standards required by customs.

XLPE power cable having higher long-term working temperature and greater current rating,at the same environment XLPE cable may be reduced size(nominal cross-section)1or 2 class in comparison with paper and PVC cable.This is not only improve the quality and properties of products,but also reduce cables production costs.

2.Scope of XLPE Power Cable

Type

No. of Cores

Nominal Cross-Section of Conductor(mm2)

YJV   YJLV   YJV  YJLV

YJV22 YJLV22 YJV23 YJLV23

YJV32 YJLV32 YJV33 YJLV33

YJV42 YJLV42 YJV43 YJLV43

ZR-YJV      ZR-YJLV

ZR-YJY      ZR-YJLY

ZR-YJV22    ZR-YJLV22

ZR-YJV23    ZR-YJLV23

ZR-YJV32    ZR-YJLV32

ZR-YJV33    ZR-YJLV33

ZR-YJV42    ZR-YJLV42

ZR-YJV43    ZR-YJLV43

1

1.5--1000

2

3

4

5

1.5--400

3+1

4+1

3+2

2.5--400

ZR- covers three classes A,B,C of flame-retardant cable.It can be expressed as ZRA-,or ZRB-or ZRC-separately.For example:ZRB-YJV,or ZRA-YJV22.

FAQ:

①How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customer’s requirements.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the closure of the pipe in the construction of hydropower?
Control cable is to control the use of electricity, the compensation cable is power-assisted. I just literally understand t to know which industry you know bfjn
Q:Can building lighting lines go to a layer of leveling?
Building buried pipeline lighting generally go to the top of the floor, low-position outlet to take the floor of the ground high-position socket to take the top of the floor These are in the construction of the construction period of the construction plan, but you said leveling layer specifically refers to what I do not know The I guess what is wrong, then this should be the main body after the completion of the secondary structure of the room, right? That is, during the renovation of the ground leveling it?
Q:How to install a reversing camera, car rear view system
Dogs like to have their own mark in the excretion of the place, you can artificially put the dog's excrement put a little in the place you want it to get rid of the hand, slowly guide it, eat water is the same, do not fight It ah, met the naughty on the contrary and the line, in short, slowly to guide it, it will understand.
Q:How does the control cable terminal head calculate?
Do not know not to say that the wrong control of the cable terminal head according to the core number
Q:What can I do with electrical engineering and automation? Do not be too professional terms
You have already said, but also how to say. You are very right But now are using PVC or PE threading tube, do not iron, the first expensive, second, not corrupt, the third installation trouble.
Q:How can the fastest church dog shake hands! And some basic action ah?
You can put this part of the embedded casing visa ah, and then apply the casing quota on OK. The fee shall be borne by Party A. Of course, I do not mean to call you to block the part of the visa ah, but should be the cost of the entire casing project
Q:Mountain car brake line and the length of the shift line?
I use the code nails, but no matter what the nails have to adjust the tongue in front of the gun because the carpentry guns should be used to hit the gun with the tongue or the wall inside the wall we use the gun gun nails to stay in the trough
Q:Copper core power cable laying (cable section YJV4 * 35 + 1 * 16mm2)
Theoretically possible, but only need to have a different power supply for each power interface, and the need for space to install a second chassis power supply, or through the extension of the power from the chassis outside the corresponding interface can be connected. And the two green lines of power and black need and get together. But from the reality, it is not necessary. The reason why to install two power is because the power of the power is not enough, then this time you can buy a power of some of the power, the money spent not much. The other one of the chassis put two power or unsafe, if put into the chassis should be more unsafe, so it is recommended to buy a power enough power on it.
Q:ASUS x503m forced shutdown after the power indicator has been flash, can not open the machine how to do
The size of the socket box, you should first look at its thickness, can be buried in the wall of the powder surface layer? So that is installed, the installation of the socket under the pipeline meaning is not big. Buried in the floor is a special outlet, you are not afraid of damp water to bring the safety of what!
Q:What are the precautions when installing the shower room?
Power cord (FlexibleCords andCables) of the safety requirements expressly provided in the CSA standard C22

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range