Hydraulic Excavator CE460-7

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1,Hydraulic system provide perfect power and accurate control to ensure continuous digging operation.

Main components, such as pump, valve, are manufactured by international top brand enterprises.

There is an open hydraulic system with Tri pump & Tri circuits, controlled by load sensing system and limit power to ensure higher efficiency and productivity at the lower est hydraulic loss. Reasonable power distribution and double pumps with crossover power control system can reduce circulation time under multiaction operation and promote productivity.

Swing secondary pressure control for better starting and braking pressure so as to ensure fast and stable swing operation.

Hydraulic hose, connection: world famous brand with excellent performance ensure better reliability for operation in mine.

High efficiency features:

Starting with zero displacement with better starting load and starting performance

Technique with minimum flow control at neutral position for best energy saving and economical efficiency

Technique with pressure cut-off to provide better system protection

Control of constant power of single pump, limited power of three pumps for reasonable distribution of engine power

Confluence of three pumps for combined movements and increasing of operating efficiency

Logic valve control for automatic straight traveling, automatic release of swing brake

Confluence of two pumps for increasing operating efficiency

2,Power system(Unique power-driven technology in China)

Diesel engine

Cummins QSM11C330 electronic injection engine with CELETC electrical system provide surging power and excellent reliability, conforms, conforms toTier2 emission standard. ECM is enable to read controller data and adjust engine to meet different working conditions

Turbocharged and electronic injection control can promote fuel efficiency and reduce fuel consumption,meanwhile provide stronger power and better performance.

Electric engine ECM is featured as data collect, error diagnosis, automatic protection, maintenance and monitoring


3,Welding&casting structure for working attachment

Adopt international top brand cylinder seal for better sealing property

Working attachment pins are made of special wearresistant alloy, hardening and chroming treated for getting high strength and long circle life

4,Automatic central ludricating sestem

Top brand automatic central lubrication at setting time interval, for specified quantity and at all lubrication points. which results in saving of manual daily maintenance, reduced manpower and increased productivity

5,Classified esign & manufacture based on working condition

Special design & manufacturing of bucket, undercarriage, working attachment and other structure parts based on different working condition; customizing design on power unit, hydraulic system, oil products and electrical system to make our products suitable for all kinds of adverse circumstance

Working attachments such as breaker, cultivators, quick-change connector can be equipped to meet different working requirements



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:CAT 320C Excavator Service Manual.?
If okorder.com This is a manual search agency and if they don´t find it, it does not exist in the Internet.
Q:How to play on a heroic union excavator?
The wind inside half meat: any jungler equipment: Enchant warrior or enchant: greed on inflammatory phagocytic Hydra power cut black cloak three or Banshee veil Berserker boots or light armorSF: any jungler equipment with an enchantment: Warrior or enchantment: greed or broken King swallowed the Hydra blade force, Tatike three-phase electric sword by the spirit or black carvers Berserker or boots and LeggingsThe loading: any jungler equipment: Enchant Boots or Ninja Warrior greed Hydra Sunfire void gate Banshee cloak veil foot with mercury
Q:What size hydraulic tank for log splitter?
Depends on the size of the ram, you want enough to fill when pushed right out, send some for the pump and extra so the tank does not empty.
Q:is the Barska Excavator a good scope?
I'd do as the other answerer said and pay just a tiny bit more to get a Nikon, or other quality brand. Barska is a third rate scope manufacturer.
Q:excavator tooth point is vulnerable to break,what can I do?
the teeth of the excavator are replaceable. They make stronger teeth for different applications. Get some good rock teeth, instead of the flat bottom ones you probably have on now.
Q:Can anyone give me any advice regarding digging leach lines for a septic tank because my husband is digging...
i hope before they started they the soil tested and inspected.cause some state require that you have the septic system in stall by a pro. i would stop them and ask the county if you need permits and also have the soil tested. becuse if you dont and some calls on you you could be heavy fined.
Q:(the Sims 3 late night) Why my sim cant dance?
If there is a patch I suggest you get it because I've never encountered this problem before o.O
Q:when do i pay building contractors?
i am a contractor in san antonio texas. we ask for fifty percent upon the day we sart the job. depending on the size of the job we may have to ask for another payment arounf 3/4 quarters of the way through. we do this for several reasons. one, we have to by materials necessary for the job at hand we do not keep stock items since each customer is different. second most contractors use sub- contractors to assist in areas where the sub would be more qualified and time effective. also, it is a good faith payment. if my customer has accepted my proposel i hope at that point we have established trust with one another. i know that once that payment is given they are serious and are ready to invest in the improvement. to reassure that my customer is comfortable and confident when they hand over large sums of money i always provide a reciept that includes specific details as to what and where that money is gonna be used for. i may not do it doen to the nickle but i like to reassure them that i have a plan of action and that i am dependable. i can understand why you or anyone would be weary to hand over a check but there are a few way to reassure yourself you are working with the right people. ask for reference from customers the contractor has done similiar work for. check with the BBB. google there name and see f anyone has said anything on the internet. i love it when a new customer wants to talk to an old one because it immediatly set my new customer at ease. just follow your gut and ask as many questions as you want. you are the customer and if they dont wanna answer its time to find a new contractor. good luck!! have fun!!
Q:What you think about Bosnia and Herzegovina, Sarajevo or Bosnian pyramids?
I've heard of this self-proclaimed excavator in Bosnia. The pyramids could be 12,000 years old, this person claims, based on geological knowledge of the area. That is exactly the main point of contention for specialists concerned with the archeology in the Balkan region. Europe was in the late Upper Paleolithic at this point and no one was building anything except flimsy huts, according to scientists. As for Bosnia, yes, I know it used to be a beautiful country, But I haven't been there recently. I know people are generally hospitable and warm, just like you, but not everybody understands that :)
Q:Where would i get a workshop manual for a Hitachi excavator?
Well i did a quick search with no luck. You will probably need to contact Hitachi to obtain one from them.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range