Hydraulic Excavator CE420-7

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1,Hydraulic system provide perfect power and accurate control to ensure continuous digging operation.

Main components, such as pump, valve, are manufactured by international top brand enterprises.

There is an open hydraulic system with Tri pump & Tri circuits, controlled by load sensing system and limit power to ensure higher efficiency and productivity at the lower est hydraulic loss. Reasonable power distribution and double pumps with crossover power control system can reduce circulation time under multiaction operation and promote productivity.

Swing secondary pressure control for better starting and braking pressure so as to ensure fast and stable swing operation.

Hydraulic hose, connection: world famous brand with excellent performance ensure better reliability for operation in mine.

High efficiency features:

Starting with zero displacement with better starting load and starting performance

Technique with minimum flow control at neutral position for best energy saving and economical efficiency

Technique with pressure cut-off to provide better system protection

Control of constant power of single pump, limited power of three pumps for reasonable distribution of engine power

Confluence of three pumps for combined movements and increasing of operating efficiency

Logic valve control for automatic straight traveling, automatic release of swing brake

Confluence of two pumps for increasing operating efficiency

2,Power system(Unique power-driven technology in China)

Diesel engine

Cummins QSM11C330electronic injection engine with CELETC electrical system provide surging power and excellent reliability, conforms, conforms toTier2 emission standard. ECM is enable to read controller data and adjust engine to meet different working conditions

Turbocharged and electronic injection control can promote fuel efficiency and reduce fuel consumption,meanwhile provide stronger power and better performance.

Electric engine ECM is featured as data collect, error diagnosis, automatic protection, maintenance and monitoring

3,Welding&casting structure for working attachment

Adopt international top brand cylinder seal for better sealing property

Working attachment pins are made of special wearresistant alloy, hardening and chroming treated for getting high strength and long circle life

4,Automatic central ludricating sestem

Top brand automatic central lubrication at setting time interval, for specified quantity and at all lubrication points. which results in saving of manual daily maintenance, reduced manpower and increased productivity

5,Classified esign & manufacture based on working condition

Special design & manufacturing of bucket, undercarriage, working attachment and other structure parts based on different working condition; customizing design on power unit, hydraulic system, oil products and electrical system to make our products suitable for all kinds of adverse circumstance

Working attachments such as breaker, cultivators, quick-change connector can be equipped to meet different working requirements




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:what is a high grade .308 ammo?
Federal, okorder.com it will show you all of the different types of bullets they make that do different things. Hope this helps.
Q:Why won't my excavator start?
1. Loosen the fittings on the filter to purge air... 2. Lightly ether start engine... 3. Tighten fittings when leaking diesel fuel...
Q:hydraulic problem on Cat 325b excavator?
Hydraulic problems are tough to figure out sometimes, but I believe you're right. It sounds like you have internal leaking in the cylinder. Because it shows up under load. Right now it looks like your only option is to tear down the bucket cylinder. If the piston looks good then you could probably get away with repacking it. But if you see scoring on the piston, then have it repaired before repacking. If not than the same problem will show up again real soon. Hope this helps.
Q:I want to buy used excavators, I want to know relevant information?
For more information on excavators, more excavator supplier information
Q:Xbox Live/ Black Ops Zombies issue?
try clearing your cache or deleting and re downloading it. If that doesn't work try calling xbox live and they will help yo fix the problem and make sure everything i plugged in right now fuses are blown and check the sound settings on black ops.
Q:Due to Internet all kinds of porn are available which has become a big issue?
if men (and women) 3000 years ago had access to the internet to watch porn, they would have been glued to their pcs see link below to read about porn from 2000 years ago
Q:Why do articles about work assume everyone works in an office?
I think you make a great point, Cybele! :)
Q:is this resume ok? can you give me some feedback?
It's a really good start, but I would make a few suggestions: 1) You don't need to list references on a resume; take them to the interview and provide them if you are asked for them. 2) You have a lot of information on here; most hiring managers will not spend a lot of time looking at your resume so less is more provided you effectively highlight your skills. Make sure it fits on one page. I would probably leave out the activities and interests section entirely or cut it down to no more that 3 or 4 bullet points. Likewise, your volunteer experience and honors sections should be cut down significantly or you could list a variety of volunteer experience as one bullet point under the heading summary of qualifications. 3) Finally, I would change your objective statement to say, Pursue entry level employment in culinary arts, retail, customer service OR business management (although you should obviously make OR lowercase). You should say or instead of and because I'm assuming you want a job in one of these fields, not all of them at the same time. :-) Good luck!
Q:Origin of Volvo excavator
In China, Volvo construction equipment (China) Co., Ltd. was established in March 2002 and is headquartered in Shanghai. The new plant is located in Jinqiao Export Processing Zone, Shanghai, Pudong. It started production in March 2003.
Q:Question about construction schools.?
I'm X with construction schools

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range