Hydraulic Crawler Excavator (SC330.8) for sale

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

SC330.8 (33Ton) hydraulic excavator with Cummins engine


SC240.8 adopts world-class power system and hydraulic system, featuring convenient operation and maintenance, low fuel consumption, and low noise. The optimal configuration and excellent design achieve perfect match of stability and work efficiency. SC330.8H also has pre-warning function, which can greatly reduce the maintenance cost. The high strength structural parts make it possible to adapt to various work conditions. The cab adopts high strength frame structure and adjustable suspension seat, which provides a safe and

comfortable work environment

SC330.8 33ton Hydraulic Excavator specification 

Characters:

1, U. S. A made Cummins engine 198Kw.

2, Japanese Kawasaki hydraulic pump, valve and swing motor.

3, Japanese Kayaba travel motor

4, World famous electric parts

5, Komatsu KES standard production.

6, 1.4M3 standard bucket.

Hydraulic Crawler Excavator (SC330.8) for sale

Hydraulic Crawler Excavator (SC330.8) for sale

Hydraulic Crawler Excavator (SC330.8) for sale

Hydraulic Crawler Excavator (SC330.8) for sale

Hydraulic Crawler Excavator (SC330.8) for sale

Hydraulic Crawler Excavator (SC330.8) for sale

FAQ Hydraulic Crawler Excavator (SC330.8) for sale:

1.How about the shipment?

1. The loader machine load one 40HQ container.

2. The loader disassemble into 3 parts, major machine, bucket and cabin.

3. Before shipment, we have done the rust-proof and antiseptic treatment.


2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.


3. What Can we Do For You?                                                                 

1. During the period of 12 months or 2000 working hours warranty, Chaogong factory are responsible for maintenance and replacement of spare parts.

2. We attend the machinery exhibition in your country and please contact us when we are with you at that time and solve the problem you have.

3. For the sole agents, we will go with senior engineer to your country and offer the technical service. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Does the excavator include the off-site transportation of excavators?
Excluding off-site transportation, the Hebei is limited to this chapter in the major machinery, one safety, and off-site transportation charges
Q:Could you translate English into Turkish please?
Bir ekskavatör evi yıkarken ben de evin dışında malları imha ettim. Tozlu bir iş. (You can also use ''kazma makinesi'' instead of ''ekskavatör'' both means excavator.)
Q:Equipment needed to mine gold other than washplant?
This okorder.com/
Q:uromastyx experts please?
now i had that very same question a few weeks ago and i asked the guy that is helping em with mine and he says its not teh best. uro's arent the brightest and may try to eat that stuff so it isnt recomended. i was really tempted to do that tho. it seemed like a great idea for mine. its jsut a shame.
Q:How do you go about reporting someone that is stealing from a company, 275 gallons of gas... jjj?
I suspect that you work for an operation which is small enough that the thief is likely to figure out who the snitch is. The situation is difficult to report if you fear retaliation. Your duty to your boss and yourself is to implicate the thief . . . except that. . . if you have no evidence, you have only your word against the thief's. I know an excavator who was aware that an employee was stealing gas every evening by pumping it from the company pump into his car. One day, when the gas tank was near empty, he drained it into the companies machines and put fifty gallons of diesel into the tank. When the thief filled his car and drove off, he got only about a half mile down the road. The boss already had his severence paycheck written and drove it out to the stranded car. The boss told the guy, Well you s h i t, I guess that's the last time you steal from me. You're fired. If you come back and screw with me or my stuff, I'll cut off your hand or whatever else is sticking out. The thief was not heard from again. Your thief must be reported but evidence is needed. You can mail the boss a simple but complete report of what you know to be facts relative to the thief's activities. Type the note and do not sign it. Let the boss have a chance to catch the guy or involve the police. Your place is to simply let the boss know what is going on and who is guilty. beyond that, it is your bosses place to correct the situation.
Q:PLEASE Help me on Homework about Hatshepsut? (Egyptian Pharaoh)?
1. okorder.com/
Q:Black Ops Zombie Moon Question?
I believe it's time but they only leave at the end of a round.
Q:In Illinois we call J.U.L.I.E to find under ground utilities, who do you call?
800-DIG-SAFE 800-DIG-RITE KS and MO
Q:i have a whole bunch of science questions for homework?
Here okorder.com/
Q:I am looking at wedding bands for my future husband, is Tungsten Carbide a good choice?
Tungsten Carbide is very strong, very hard, practically scratch-resistant and is a heavier darker metal. One downside to this metal is it can be difficult or impossible to resize so with weight fluctuations, may need to be replaced in the future. Other than that small detail, I think it's a great choice. It's also very affordable, so if the ring did need replacing, it can easily be done.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range