HUAXIA TOWER CRANE QTZ63(5010)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
6 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers

item

unit

parameter

Rated moment

kN.m

630

Max.load

t

5

tipload

t

1.095(2 rate)/0.989(4 rate)

Working radius

m

3 ~50

Height(free-standing/anchoring)

m

35/120

Self weight(wihout ballast)

free-standing/anchoring

t

24.1/48.5

ballast

10.5

Working temperature

0C

-20~+40

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:How to select tower crane type according to the height of building? Seek explanation
This depends on the height of your building, the area, the choice of tower cranes, the model is different, his work coverage is not the same. Now for tower crane, height is not a problem, mainly depends on the size of your building, not in the crane's scope of operation.
Q:Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper working structure of the attached tower crane is connected with the jacking sleeve frame, and a jack jack is mounted on the top lifting jacket frame. The upper crossbeam of the jack is connected with the jacking frame, and the lower cross beam is provided with a movable claw, and the lower supporting point can fall on the step of the standard section of the tower body. During lifting, first trim jib and balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.
Q:What parameters are lifting machines called large equipment? 200
General purpose gantry cranes: MG, 440t, MG, 360t, MG, 450t, Me, 360t, ME, 900tGeneral purpose bridge crane: QD, 350t, QD, 400t, QD, 450t, QD, 390t, QD, 330t, QE, 350t, QE, 330tThe above tonnage is now recognized by the state as a large lifting machine.
Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
The lightning resistance of tower crane (tower crane) on the construction site shall be no more than 4 ohms.I. tower crane GB/T 5031--20085.5.5.9 lightning protectionIn order to avoid lightning stroke, the main structure of the tower crane, the motor frame and all the electrical equipment metal shell, wire metal protection tube should be reliable grounding, and its grounding resistance should be no more than 4 ohms. When multiple repetitive earthing is adopted, the grounding resistance shall be no more than 10 ohms.Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
Q:How much more than m of tower crane jib winch point height should be equipped with anemometer
According to the regulations of JGJ196-2010 for the safety and safety of installation, use and disassembly of tower cranes for construction purposes:The use of 4.0.15 tower crane height of more than 30m should be equipped with obstacle lights, jib root hinge height of more than 50m should be equipped with anemometer.
Q:Does tower crane belong to special equipment?
Tower crane is a high-altitude operation, the type of work belongs to special types of work, equipment belongs to special equipment.
Q:What kind of personnel should be installed for the tower crane installation and disassembly?
2, with special construction operation qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.And an electrician.
Q:What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
Q:There is no CAD map attached to embedded parts of tower crane?
Where there are special drawings, we are using the embedded parts of tower crane attachment reinforced pre buried above 32mm (with hook) in concrete beam column, with the head of the thread and attached connection

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range