HOWO WATER TANK TRUCK

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Model

Chassis Model

Series

Volume (m3)

Engine

Power (kW)

JYJ5120GSS

ZZ1124G4715C1

Huanghe Commander

8.2

Yuchai

140

JYJ5163GSS

ZZ1124G4715C1

Huanghe Commander

12.2

Yuchai

140

JYJ5250GSS

ZZ1251M4441C

Gold Prince

19.0

Sinotruk

196221

JYJ5255GSS

ZZ1251M4441C

Gold Prince

15.0

Sinotruk

196221

JYJ5310GSS

ZZ1311M4661C

Gold Prince

18.0

Sinotruk

196221


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Christians, I saw I giant metal bird with machinery attached to the wings?
It's called a jumbo jet even when you are not tripping on peyote.
Q:What are the business scope of machinery and equipment enterprises?
Packing machinery: packing machine, packing machine, conveyor, etc.. Environmental protection machinery: water pollution control equipment, air pollution control equipment, solid waste treatment equipment. Other machinery.
Q:if the company introduces new machinery and reduces its direct labour, how is the break even point affected?
It will be affected relative to the cost difference between the machine and labor . If the cost of the machine is more than labour in the short term it will be higher if not then lower . You should be able to calculate a realistic break even point for when the machine is paid off , obviously you need to take into account running costs and maintenance and whether or not they will exceed your existing labour costs . Cheers
Q:If I use Mobil Steyr engineering machinery oil, the most suitable collocation way??
Engineering machinery with black Mobil Steyr 15W40 fighter CG-4 OK
Q:Where to buy high quality RC Tractors and machinery?
Rc Tractors
Q:What are good examples of design experiments for AC machinery?
You could demonstrate that as the load on a three phase induction motor or transformer, increases, so too does the power factor. This is something that is important to demonstrate as it will lead to the correct size motor or transformer, being installed. A second demonstration could be showing that as the mechanical load on a three phase motor, increases, the motor draws more current and the slip speed percentage, increases slightly. You can use a prony brake to apply more load in both of these demonstrations. You will also need a power factor meter, a watt-meter and a tachometer.
Q:Are there any risks in taking LSD while operating heavy machinery?
There's a few
Q:How do you change the clock machinery so that in 1 day it would have gone round once instead of twice?
Check the back of it to see if there is a 12 hour setting and 24 hour setting. You might be able to just flip a switch.
Q:Whats the depletion expense for the mineral deposit and the machinery?
Dr Depletion expense $570,681 (184,500/1,569,000 x $4,853,110) Cr Accumulated depletion $570,680 Dr Depreciation expense $28,822 (184,500/1,569,000 x $245,100) Cr Accumulated depreciation $28,822
Q:The cost of machinery which makes an energy from wind...?
You can build a windmill for about $100 but it won't do much or you could spend millions and get a lot of power.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range