HOWO All Wheel Drive Truck 8x8 PINK

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Vehicle Model

ZZ2317N3577C1

ZZ2317N4677C1/N2WA

ZZ2317N4977C1

Overall Dimension of Chassis (Length× Width× Height) (mm)

9728×2496×3110

11178×2496×3110

10728×2496×3110

Gross Weight (kg)

31000

31000

31000

Max. Driving Speed (km/h)

75

75

75

Distance between Axles (mm)

1950+3500+1400

1950+4600+1400

1950+4950+1400

Engine

Model

WD615.95C

Rated Power (kW/r/min)

249/1900

Max. Torque (N·m/r/min)

1490/1200-1500

Clutch

φ430mm diaphragm spring clutch

Gearbox

Model

HW19710

Velocity Ratio

14.28 10.62 7.87 5.88 4.38 3.27 2.43 1.8 1.34 1.00 R1 13.91 R2 3.18

Drive Axle

STR cast front steering drive axle, ST16 rear drive axle, velocity ratio of 6.72

Steering Gear

ZF8098

Transfer Case

Model

2000

Transmission Ratio (high grade/low grade)

0.89/1.536

Braking Type

Service braking: dual-circuit, pneumatic braking

Parking braking: (manual braking) energy-storage spring type braking

Truck Cab

HOWO76 truck cab

Electrical System

HOWO electrical system, 24V, Negative earth

Tire

12.00-20

Oil Tank Capacity (L)

400

Optional Type of Engine

WD615.95C, WD615.96C


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What about the prospects for employment in machinery manufacturing and automation?
From the mechanical industry development point of view, printing machinery, CNC machine tools, power generation equipment, construction machinery and other heavy products outlook is still promising. In addition to these traditional industries, the industry will further develop to photoelectric integration, to expand the light processing, this emerging field of environmental protection
Q:To ask, I have better supply of construction machinery here, I would like to foreign trade, I do not know how the international market in the near future, engineering machinery, foreign trade to prepare what knowledge?
You have to do it slowly and look for experience from reality. Add some construction machinery QQ group, or go to the forum such as mechanical brothers forum to look at other people's experience, if specific words, that is too much. In a word, take your time, don't worry!
Q:What are the future prospects of mechanical design, manufacturing and automation? How about salary after employment?
There are other machinery, the development of enterprises, machinery manufacturing enterprises, of course, this piece of equipment maintenance to many people, graduates can also go to school as a teacher. The mold design and manufacturing is also very good. This is the direction you can go to the enterprise, into the enterprise,
Q:What about the title of Mechanical Engineer?
The second basic examinations are divided into 2 half day, each for 4 hours. Professional examination is divided into professional knowledge and professional case two parts, each part content is 2 half day, each half day is 3 hours. Article third in line with the "mechanical design registration Machinery Engineer System Provisional Regulations" eighth requirements, and has one of the following conditions, may apply for the basic examination:
Q:About the marketing strategy of construction machinery industry
The construction machinery industry China originated from state-owned enterprises, has experienced the planned economy, planned economy, market economy at the beginning of the 3 main stages of economic systems, product sales mode has the corresponding evolution, forming a unique sales model in each period
Q:How to improve mechanical design ability!
To improve, we must sum up, this is critical. Other people or their achievements from scratch, thinking, think where needs improvement, where is the key, where is worth learning and drawing lessons from. Thinking is very important. Thinking is progress.
Q:What are the total cost of the project?
The general construction cost includes (1) the cost of construction and installation, that is, the construction and construction costs. (2) purchase fees for equipment, equipment and equipment, such as elevators installed on the installation, transformers, industrial boilers and other equipment, depending on the nature of the project.
Q:What are the employment directions of mechanical engineering?
The employment direction of mechanical engineering is very extensive, and the mechanical related industries are involved. Including aviation, automobiles, heavy industry, transportation, machinery research institutes, etc.. General employment related to specific direction you apply for the school, such as aerospace school employment direction for the general aviation enterprises, many automobile enterprises and so on.
Q:Please tell me the highest and lowest price of Xugong machinery
Xuzhou established a nationwide marketing network, more than and 280 overseas agents to establish in the world XCMG provides a full range of marketing services for users, XCMG products have been exported to 158 countries and regions in the world, 2012 exports exceeded $1 billion 360 million, for 24 consecutive years to maintain the first industry exports.
Q:What are the mechanical standards and what are the testing items for the MD mechanical standards?
Separation equipment: filter and other separation equipment; drying equipment: vacuum dryer, dryer and other boiling drying equipment; cleaning cleaning equipment, ultrasonic cleaning equipment, Shotblast cleaning machine, cleaning and other cleaning equipment etc.;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range