Hot sale scaffolding steel prop manufacturer

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Model Number:
AD01-01
Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Props
Color:
Self-color or Powder-coated
Size:
1940-5030
N.W.:
18.4
Loading Capacity:
90-65 KN

Packaging & Delivery

Packaging Detail:Pallet or Bundle
Delivery Detail:30-45 days upon confirmation

Specifications

1.Weight:18.4 kg
2.Loading Capacity:90-65 KN
3.Dimension:1940-5030 mm
4. Durable
5. Recyclable

                          Hot sale scaffolding steel prop manufacturer

Feature

Safety

Developed with Harsco.                

Stringent Quality Inspection system applied

Efficiency  

Easily assembled                

High loading capacity requires less use of props,reducing cost in material and labor                  

No loose components                

Quick adjustment with drift pin.

Flexibility

Various sizes and different loading capacity to suit your changing needs.    

     

Durability  

Steel material is carefully selected to ensure better strength and longer lifespan

Excellent surface finish minimizes the risks of corrosion during application      

 

Item#Dimension (mm)Details  (mm)WeightLoading Capacity/ KN
F.O.S=3:1
Loadage (PCS)
(kg)20GP40GP
AD01-011066.8-1765.3Light-duty steel prop                
*Inner Tube:Φ48X2.5, Q235
*Outer Tube:Φ60X2, Q235
*Base Plate:152.4x152.4x8,Q235
1114960-10401920-2080  
AD01-021524-274013.714720-8001440-1600  
AD01-031753-312414.811-14640-7201280-1440  
AD01-041956-335315.510-14640-7201280-1440  
AD01-052566-396317.28.2-14560-6401120-1280  
AD01-063200-487818.65.5-14480960
AD01-072209.8-3911.615.98.2-14560-6401120-1280  

Note:

1)1KN=102kg

2)All dimensions are nominal.

Surface Finish: Painted, Powder-coated, Hot dip galvanized.

Different color surface finish to suit your changing needs.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to reinforce the lower part of the steel structure of the construction elevator on the roof of the non - air defense garage
On the basis of the natural foundation of the tower crane, you can balance the freedom of the height of the crane hoisting moment, a considerable weight. To 5 m X5 m X1.4 m tower base to calculate the weight of 84 tons.
Q:How to reinforce the lower part of the construction elevator on the garage roof
The crane can put the ceiling height of tower crane weight about four 0 tons of standard weight is heavier wall section of the tower crane foundation tower crane foundation balance free height
Q:Span of 40 meters, the height of the beam to support the 1.4 meter high density?
Please confirm that the title of the 1.4 meter high beam span of up to 40 meters! Is it concrete? This is more than a certain scale of the greater risk of sub projects, the need for the preparation of special security construction program after the implementation of expert demonstration. The project should be clear, not a joke oh!
Q:How to calculate the axial force of steel support in deep foundation pit
Preload is generally not more than 450kN, because of the use of pile anchor structure is mostly sand, silt, or clay, anti pulling force of this stratum and anchor is limited, 450kN means that the prestressing design tension reaches 450/0.95~450/0.7, which is basically the ultimate anchor in this ordinary formation, if not met to consider the encryption of anchor spacing.
Q:Steel support is now about how much the price
Steel support is now the market price is about 65 yuan / root,
Q:How to improve the monitoring accuracy of foundation pit supporting axial force
Through the comparison of the stress and strain data in two aspects, the purpose of improving the accuracy has been achieved
Q:Under the steel support line load is 420kn/m (design value)
So, not in tube. Both ends of the tube should have beam, beam should be behind the steel gate or steel concrete continuous wall.The load should appear on the beam or plate
Q:Steel support can stay in the wall joint position, if not, then why?
The jet grouting pile is in even after the end wall construction construction, for fear of even the construction of wall joints is not perfect, there Water Leakage seams and other quality problems, in the wall at the seams (outside the foundation) to reinforce, most of the time without the need for jet grouting pile construction.
Q:How to distinguish between the columns of single and double steel support
2, the column support column bracing is to ensure the construction of the overall stability of the structure, improve the lateral stiffness and the transfer of longitudinal horizontal force between the adjacent two columns of the connecting rod.
Q:What is the steel plate support
The steel pipe support system comprises a support rod system and a subsidiary component part, wherein the supporting rod system comprises a main rod, a movable end and a fixed end

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range