Hot-Dipped Galvanized Layher Scaffolding System

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 m.t.
Supply Capability:
10000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Hot-Dipped Galvanized Layher Scaffolding System

1)Main material: Q345
2)Surface: Hot dip galvanized
3)size: 48.3mmX3.25mm

4)welding: automatic welding technology

5)Certification: ANSI/SSFI SC100-5/05

Vertical:1m,1.5m,2m,3m
Ledger: 732,1088,1400,2072,2572,3072mm

Components: Standard, Ledger, Brace, Plank, Ladder, Base jack, Rosette, Start collar



Hot-Dipped Galvanized Layher Scaffolding System

Hot-Dipped Galvanized Layher Scaffolding System

Hot-Dipped Galvanized Layher Scaffolding System

Hot-Dipped Galvanized Layher Scaffolding System

Hot-Dipped Galvanized Layher Scaffolding System

Hot-Dipped Galvanized Layher Scaffolding System

Hot-Dipped Galvanized Layher Scaffolding System


Hot-Dipped Galvanized Layher Scaffolding System


With automatic welding technology ,stable quality ,uniform and smooth surface .


 We are  a professional manufacturer and supplier of scaffolding systems, scaffolding couplers, and other related products. With good quality and competitive price, our products are very popular in European, Australia, North America, Mid-east, and South East Asia and some African countries.





Quality Control

Recognizing that quality control is a key factor that determines success in overseas markets, our factory uses state-of-the-art facilities to ensure products meet the standards in the United States and European countries.

Hot-Dipped Galvanized Layher Scaffolding System

Hot-Dipped Galvanized Layher Scaffolding System




Packing

Woven bag and pallet , carton, plywood case, as your request.


Hot-Dipped Galvanized Layher Scaffolding System

Hot-Dipped Galvanized Layher Scaffolding System




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q:what's the meaning of scaffold?
I don't think that it's a term for a specific type of business (like a pyramid scheme), but it's simply a business that sells/produces scaffolding. Scaffolding is a temporary framework used to support people and material in the construction or repair of buildings and other large structures. It is usually a modular system of metal pipes (termed tubes in Britain), although it can be made out of other materials. Bamboo is still used frequently in Asia.
Q:Are there any biological examples of scaffolding in evolution?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q:A 115 kg scaffold is 7 m long. It is hanging with two wires, one from each end?
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q:The construction scheme of high rise and external cantilever scaffold!
Quality standard for 3 foot hand frame fittings(1) steel pipe: steel pipe is generally used outside the 48mm, the wall thickness of 3.5mm steel welded pipe No. 3,The chemical composition and mechanical properties can meet the national standard "carbon structural steel" (GB / T700). The vertical rod, longitudinal rod (rod) tube length is 4~6m, horizontal bar (small bar) is generally 1.2.3m. steel pipe should be coated with anti rust paint.
Q:Hoisting a scaffold: newton's second law tension problem?
The force felt by the person pulling is the same as the force in the rope between the two pulleys. It doesn't matter if the person is pulling straight up (without the pulley) or straight down(with the pulley) it's the same. Therefore the weight/force is divided equally between the two ropes.
Q:by scaffolding ?
It's a rhetorical question, maybe the girl is held up so well that it could have been something else holding her up there
Q:Industrial Scaffold HELP!?
Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.
Q:What are the requirements for acceptance of external scaffolding? Want to know before
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.
Q:Is it possible to have the scaffold piercing done separately?
Technically yes but it is better to have them done at the same time so the holes are aligned properly. It is better to get them done at the same time, as the second piercing will be less painful because you are all adrenalin-ed up! Probably cheaper too.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range