• Hot Dip Galvanized Tie Rod Nut With Base Plate For 100mm System 1
  • Hot Dip Galvanized Tie Rod Nut With Base Plate For 100mm System 2
  • Hot Dip Galvanized Tie Rod Nut With Base Plate For 100mm System 3
Hot Dip Galvanized Tie Rod Nut With Base Plate For 100mm

Hot Dip Galvanized Tie Rod Nut With Base Plate For 100mm

Ref Price:
get latest price
Loading Port:
XINGANG
Payment Terms:
TT
Min Order Qty:
2000 Unit/Units pc
Supply Capability:
10000 Unit/Units Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details of Hot Dip Galvanized Tie Rod Nut With Base Plate For 100mm

Place of Origin:  China (Mainland) 

Brand Name:  CMAX 

Type:  Formwork system 

weight:  0.40kg-1kg 

size:  70mm-150mm 

material:  QT500 

screw thread:  15mm/17mm

Material

Q235 or 45# steel Material

Diameter

15/17mm

size/length

1m,2m,3m,4m,5m,6m,etc

Surface Treament

black or zinc plate

Weight

1.25kg

Package

in steel plate or plywood plate,as your requests

Payment Terms

TT,L/C,

Delivery Time

10-15days

 

Different kinds of design as per your requirement

Material:ductile iron

Diameter:17mm

Surface treat:zinc plate

working load: minimum 17kn

With different kinds of design

High Quality Competitive Price

cast iron tie rod nut

Different kinds of design as per your requirement

 

Material

Nodular Cast Iron QT4501;Steel 45Mn

Working load

90KN_180KN

Package

Steel Pallet; Box; Bag

Thread

Dia12mm;Dia15mm;Dia17mm;Dia20mm

Surface

Electro-Galvanization or self -color

 

Packaging & Delivery  of  Hot Dip Galvanized Tie Rod Nut With Base Plate For 100mm

Packaging Detail: stander packing

Delivery Detail: 7 days after receive your deposit

 

Specifications of Hot Dip Galvanized Tie Rod Nut With Base Plate For 100mm

1.easy remove

2.surface perfact

3.colour:several colours

4.Drop Froged

5.Dia 48.3x48.3mm

6.Surface: Zinc Plating, hot DIP Galv

 

• It can be made by forged process , punching process, bending process, etc .

• Products’ type more than 400,including construction couplers, construction nuts , steel wedges, bolts, props , base jacks, base collars,base plate, and so on.


About us

1.Enough production lines and workers to delivery on time.

2.Main product: Scaffolding Frame,Scaffold Coupler( British Type, American Type, German Type, Italian Type, Australian Type, Mideast Type, Korean Type, Janpanese Type, Indian Type etc.); Shoring Props,Formworks,Formwork cast nuts Frame System, Accessories, Steel / Aluminum Planks etc.

3. Main Market: Europe, Australia, Newzealand, North America, Middle East, ect.

4.OEM Service

5.Our products have passed the customer`s quality test,and the factories have the quality testing instruments.

6.Provide good service for everyone.

Our scaffolding products are all manufactured in accordance with the standard of BS1139 and EN – 74. 90% of our products are exported to overseas markets. Our main products is very popular in the world in scaffolding fram system,formwork and other scaffolding accessory

 

 Hot Dip Galvanized Tie Rod Nut With Base Plate For 100mm

 

 Hot Dip Galvanized Tie Rod Nut With Base Plate For 100mm

 

 Hot Dip Galvanized Tie Rod Nut With Base Plate For 100mm

Q:The whole concrete wall climbing frame or good use of steel scaffolding
It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q:What is an integrated climbing frame? What are the works? What are the advantages
. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q:Advantages and disadvantages of climbing frame and floor type scaffold
3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q:What are the maintenance and maintenance of hydraulic climbing formwork
After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
Q:The difference between the scaffold and the scaffold
Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
We are an enterprise which is engaged in mechanical designing, processing, mold manufacturing and casting. Its customers are based on foreign investors, state-owned enterprises and medium-sized private companies. Because of the advanced technology, our products are involved in petroleum, metallurgy, mining, and textile, medical and other industries. The company makes a rapid rise in the machining area under the conduct of business philosophy “quality first, customer first” and the management principle “strengthen the management, continuous improvement”.

1. Manufacturer Overview

Location Hebei, China
Year Established 1987
Annual Output Value Below US$1 Million
Main Markets China; United States; Britain; Japan; Germany; Israel
Company Certifications GB/T19001-2008/ISO9001:2008 Quality Certification

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Xingang
Export Percentage 1% - 10%
No.of Employees in Trade Department 10-20 people
Language Spoken: Chinese; English
b)Factory Information  
Factory Size: Above 3,000 square meters
No. of Production Lines Above 10
Contract Manufacturing Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords