​Hot Dip Galvanized Steel Plank Metal Planks 225*38*1.5*1000/2000/3000/4000mm CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Description of Hot Dip Galvanized Steel Plank  Metal Planks 225*38*1.5*1000/2000/3000/4000mm

  • Material :Q195 (Carbon 195 Steel)

  • Size :225*38*1.5*1000/2000/3000/4000mm(or customized)

  • Surface treatment :galvanized

  • Color : silver


  • Hot Dip Galvanized Steel Plank  Metal Planks 225*38*1.5*1000/2000/3000/4000mm

  • ​Hot Dip Galvanized Steel Plank Metal Planks 225*38*1.5*1000/2000/3000/4000mm CNBM

  • ​Hot Dip Galvanized Steel Plank Metal Planks 225*38*1.5*1000/2000/3000/4000mm CNBM

  • Hot dip galvanized steel plank is an ideal Economical & Eco-friendly scaffolding solution for Scaffolding system and Formwork system. A perfect choice for safety & low-cost & high-efficiency construction projects.
  • Even load capacity: >7kN/ m2  

  • Max span < 2m & Recommended span between 1.2-1.5m.

  • Side box design with better anti - deforming capability

  • 3 strengthen support designs with much stronger support force

  • 500mm support spacing with better anti - deforming capability

  • hot dip galvanizing surface & lifespan > 5 years

  • Punching design to anti-skid & lighten weight

  • Stiffener design with reinforced the load bearing capacity


  • What are your products advantages?

  • Experience: over ten years in scaffolding manufacturing.

  • Quality: Certified by SGS, BS1139, EN74, Local Test Report.

  • Price: Moderate, Reasonable.

  • Service: Friendly and Responsible. OEM service is available.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Construction scaffolding fastener weight?
High efficiency of the installation and removal of only bare handed, greatly improve the efficiency of mobile scaffolding assembly and disassembly than the steel pipe frame 1/2 fast time, faster than bamboo scaffolding 2/3 time. Safe and reliable 1 overall performance is good: equipped with a foot board, parallel frame, buckle wall tube, horizontal and cross bar...
Q:Classification and erection of scaffolding and related specifications
2, scaffolding construction should be appropriate qualifications for safety in production permit in accordance with the construction of the scaffolding for the implementation of special case of Wu erection qualification prohibited the construction team to set up construction, 3 steel tubular scaffolding steel tube, fastener, wall fittings etc. shall be in accordance with the "construction of steel tubular scaffold Safety specifications" (JGJ130-2001) requirements and factory certification, inspection report inspection qualified components for 4 steel tubular scaffolding, scaffolding operations engineering supervisor should strengthen inspection found the construction according to the special case of the implementation of existing safety accidents should be in accordance with the relevant provisions of the written instructions and construction units ordered rectification or stop two, construction scaffolding technology standard 1 basic requirements, the pole base (base plate) a malleable cast iron manufacturing and welding base two erection scaffold Wooden plate paving base pole again put into the base plate in the bottom area of the calculation and should be less than 2 degrees, the thickness of 50mm to cross the wooden shim plate adopts steel plate 2, using plywood as cantilever scaffold cantilever beam layer cantilever scaffold with cantilever beam or cantilever frame with steel cantilever beam should be prohibited (I-beam, channel) made of cantilever frame made from steel tubes connected by the fastener 3, operation layer, protective railing railing ramps block baseboard shall be erected outside the pole inside; rail height should be 1200mm; the railing height should be 600mm; in 180mm4, the block foot height should be within the framework of closed scaffolding laying scaffold should be at least two layers. Operation layer protective layer operation layer protective layer of scaffold safety net fallback
Q:How long do you have to wait in between getting two piercings? cartilage and industrial (scaffold)?
i heard from people after a year an industrial still hurts and they usually have to take them out
Q:Is it possible to have the scaffold piercing done separately?
Technically yes but it is better to have them done at the same time so the holes are aligned properly. It is better to get them done at the same time, as the second piercing will be less painful because you are all adrenalin-ed up! Probably cheaper too.
Q:What is the bowl buckle scaffolding, bowl buckle scaffold what are the characteristics
Specification and application of bowl buckle scaffold pole fittingsBowl buckle type steel pipe scaffolding rod parts can be divided into its main components, auxiliary components, special components three
Q:Method for inspection of foot hand frame fittings
GB15831-2006 steel pipe scaffold fastenerGB_5725-2009 safety net
Q:How is Hester changed by the 7 years which elapse before her final stand on the scaffold?
you can see how weak morally dimmesdale is, because he keeps his hand over his heart all the time, and is constantly beating himself up over his crime. he whips himself in the closet, and brands himself with a scarlett a to match hesters. hester... when she first walks out on the scaffold she can be seen as defiant, as if she isn't ashamed of the embellished letter a she wears. the cottage she lives in is on the edge of the town, bordering the forest. towards the end of the 7 years, her actions can be seen as repent maybe for her crime: she is a self ordained sister of mercy, helps the poor and homeless, sews... and the a turns from adultery to able
Q:Info on scaffold piercing?
it probably does hurt cuz of your cartilage just put rubbing alchahol on it and it should be okay =)
Q:Which loads are considered in the design of the scaffold
The variable load of the scaffold shall contain the following contents:1) construction load: including the personnel, equipment and materials, etc.;2) wind load.Safety code for construction of steel tubular scaffold with couplers JGJ130-2011
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range