​Hot Dip Galvanized Steel Plank Metal Planks 210*45*1.5*2000 CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Description of Hot Dip Galvanized Steel Plank  Metal Planks 210*45*1.5*2000

  • Material :Q195 (Carbon 195 Steel)

  • Size :210*45*1.2*2000mm(or customized)

  • Surface treatment :galvanized

  • Color : silver

  • ​Hot Dip Galvanized Steel Plank Metal Planks 210*45*1.5*2000 CNBM

  • ​Hot Dip Galvanized Steel Plank Metal Planks 210*45*1.5*2000 CNBM

  •  

    Hot Dip Galvanized Steel Plank  Metal Planks 210*45*1.5*2000

     

     

  • Hot dip galvanized steel plank is an ideal Economical & Eco-friendly scaffolding solution for Scaffolding system and Formwork system. A perfect choice for safety & low-cost & high-efficiency construction projects.
  • Even load capacity: >7kN/ m2  

  • Max span < 2m & Recommended span between 1.2-1.5m.

  • Side box design with better anti - deforming capability

  • 3 strengthen support designs with much stronger support force

  • 500mm support spacing with better anti - deforming capability

  • hot dip galvanizing surface & lifespan > 5 years

  • Punching design to anti-skid & lighten weight

  • Stiffener design with reinforced the load bearing capacity


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Classification and erection of scaffolding and related specifications
7, the unloading platform progress specification in our city construction scaffolding scaffolding collapse prevention effect falling accident according to the "construction safety management regulations" "construction of steel tubular scaffold safety technical specifications" (JGJ130-2001) related matters notice: now, the scaffold erection procedures for the implementation of the 1 basic requirements, construction the enterprise construction project before the implementation of special case according to the characteristics of building scaffolding (highly 24m tubular steel scaffolding, cantilever scaffold should be attached to the safety check node) the case should be responsible for the enterprise technology (General Engineering) signed by the chief supervision engineer signature recognition project review organization and implementation review does not pass the special construction case the implementation of
Q:Industrial Scaffold HELP!?
Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.
Q:why are there lumps on my scaffold peircing :S?
I had the same situation occur when I got my scaffold/industrial done. I wouldn't be too concerned. The lumps are called hypertrophic scars, and supposedly they are pretty common and are caused by overcleaning, harsh products, or (as I think was my case) general irritation from the jewelry moving repeatedly back and forth through the piercing or being bumped around or rubbed/touched. Mine lasted quite a long time. Try leaving your piercing alone for a couple of days. Then salt water solutions or compresses are supposed to help the lumps to heal, and I also used tea tree oil and neosporine intermittently. Hot compresses like a heated washcloth applied to the area help to reduce the lumps, as well. Sometimes it's recommended to try another type of jewelry, like titanium, or switch temporarily to two separate bars. You might also try finding a really gentle cleanser/soap. I just kept my original piercing, using the above techniques off and on, and after months of the lumps remaining red and sore, they just went away totally. Just keep your eye out for any pussing (hypertrophic scars ooze, but they don't usually pus), increased swelling, and the area feeling very hot- these are signs of infectiona nd you should see your doc right away. Good luck! :)
Q:How to calculate the vertical force of scaffolding
First, the calculation of small beams: small beams in accordance with the strength and deflection calculation of simple beams, small bars in the upper bar. According to the small bar scaffold board and live loads above the maximum bending moment and deformation the uniform load calculation of small bar.
Q:What is the mobile scaffolding materials
About looking for specific mobile scaffolding, I suggest you here to see the mobile scaffolding, mobile scaffolding here all, other parts of the mobile scaffolding, mobile scaffolding may not fully determine where is here, you can find the mobile scaffolding, mobile scaffolding because it is easy to find, but now is not the mobile scaffolding too hard to find. About looking for specific mobile scaffolding, I suggest you here to see the mobile scaffolding, mobile scaffolding here all, other parts of the mobile scaffolding, mobile scaffolding may not fully here,
Q:Introduction of external scaffolding
2 the size and surface quality of steel pipe shall meet the following requirements:1) the new steel pipe should have quality certificate, quality inspection report; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth of steel pipe; allowable deviation table item allowable deviation inspection tool 1 welded steel pipe size (mm) diameter 48 wall 3.5 -0.5 thick 2 vernier caliper at two ends of the steel tube shear diagonal deviation 1.7 corner ruler feeler, the outer surface of the steel pipe 3 corrosion depth is less than or equal to 0.50 bar 4 vernier caliper end bend L = 1.5m = 5, 5 pole bending steel ruler 3m
Q:Compared to Pankou scaffolding and scaffolding have what distinction, what are the advantages
Pankou scaffolding and scaffolding to build shape is not the same, is not the same, the price is not the same1, Pankou scaffolding hot-dip galvanizing process, lasting up to 15 years of age or above.2, scaffolding, low cost, high efficiency, convenient disassembly and effort to build.
Q:How to calculate the fastener type steel pipe scaffold
1.1.2 provides for the temporary structure of the scaffolding structure, the structure of the importance coefficient of gamma 0 take 0.9. ?The scaffold structure design of 1.1.3 on reliability requirements, considering that there is no enough statistical data accumulated by the situation, determine the probability limit state design, should be consistent with our historical experience, if using a single coefficient method was designed, the single safety coefficient should be satisfied: the strength calculation of K1 = 1.5 the stability calculation; K2 = 2. To this end, in the calculation of the introduction of the material strength of the additional coefficient of gamma 'm' or resistance to the addition of partial coefficient gamma 'R, gamma' R= gamma 0 gamma 'm=0.9 gamma' m.
Q:Construction scaffolding fastener weight?
Button bowl frame of various specifications and theoretical weight list: scaffolding company, steel pipe, scaffold engineering, scaffold accessories, Wuxi scaffolding, scaffolding rental, mobile scaffolding, scaffolding, scaffolding rental, Aluminum Alloy scaffolding, scaffolding, mobile scaffolding, stainless steel scaffolding;
Q:What are the common rules for calculating the amount of scaffolding works
According to the wall masonry scaffolding (single) vertical projection area calculation with square metre.Scaffolding, without deduction of door and window opening, air ring, vehicle channel, deformation joint area. At the same time, the height of the same building is different, according to the vertical height of the building.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range