​Hot Dip Galvanized Steel Plank catwalk 480*45*1.2*1829 CNBM

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Description of Hot Dip Galvanized Steel Plank catwalk 480*45*1.2*1829

  • Material :Q195 (Carbon 195 Steel)

  • Size :480*45*1.2*1829mm with hooks

  • Surface treatment :galvanized

  • Color : silver

  • ​Hot Dip Galvanized Steel Plank catwalk 480*45*1.2*1829 CNBM

  • ​Hot Dip Galvanized Steel Plank catwalk 480*45*1.2*1829 CNBM

  • ​Hot Dip Galvanized Steel Plank catwalk 480*45*1.2*1829 CNBM

  • Hot Dip Galvanized Steel Plank catwalk 480*45*1.2*1829 Futures:



  • Hot dip galvanized steel plank is an ideal Economical & Eco-friendly scaffolding solution for Scaffolding system and Formwork system. A perfect choice for safety & low-cost & high-efficiency construction projects.
  • Even load capacity: >7kN/ m2  

  • Max span < 2m & Recommended span between 1.2-1.5m.

  • Side box design with better anti - deforming capability

  • 3 strengthen support designs with much stronger support force

  • 500mm support spacing with better anti - deforming capability

  • hot dip galvanizing surface & lifespan > 5 years

  • Punching design to anti-skid & lighten weight

  • Stiffener design with reinforced the load bearing capacity

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How long do you have to wait in between getting two piercings? cartilage and industrial (scaffold)?
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Q:How to do an industrial(Scaffold) piercing without a bend in the ear?
This is why you need a pro. I can see where you should probably put a helix-to-helix industrial in that ear, but if yall can't see it, then I don't think you should be trying this, as neither of you have the experience a professional piercer does.
Q:Scaffold climbing law?
OSHA says that you need guardrails, safety nets or a fall-arrest system if you're working or walking near an unprotected surface more than 6' above a lower level.
Q:How many meters per square meter and the number of steel fasteners
Each of the joints is about 5%, which needs to be controlled by the step distance and the vertical rod spacing. Under the construction of the construction of steel tubular scaffold safety technology
Q:Specific specification for erection of civil scaffold
The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;Dressing should be checked once a year. When the examination, should be in serious pipe corrosion in the selected three roots in each part of the serious corrosion of transverse sampling inspection, the outer surface of the steel pipe corrosion depth allowable deviation is less than 0.5mm, more than the provisions shall not be used.All new and old steel pipes must be painted with anti rust paint.
Q:Why won't the WWE hire Necro Butcher and New Jack to work scaffold matches with John Cena?
World Wrestling Entertainment has never done Scaffold Matches in it's 5 Decade Histrory. If you want to see Scaffold Matches, go buy tickets to an Independent Wrestling Show. WWE has no interest in hiring Necro Butcher. He doesn't have the Look that they want. WWE doesn't have any interest in New Jack. They've known about New Jack for 2 decades and haven't made any attempts or expressed any interest in signing him.
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:Im planning on getting an industrial (scaffolding) ear piercing...?
Hi I got it done a few months ago I love it! Its really not that sore at all just a slight nip and then bit warm afterwards lol! Only thing annoyed me was couldn't sleep on it for a while and that was always the side I slept on! I live in Belfast and you can get it done from about 16. I just went to a well known tattoo parlour and had no problems what so ever. Go for it looks great Good luck :D
Q:What is the importance of the second scaffold scene in the Scarlet Letter?
It is less about Hester because she has accepted her punishment. It is more about Dimmesdale.
Q:can anyone tell me if it is true that the scaffolding on york minster has to stay there for political reasons?
York Minster Scaffolding

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range