​Hot Dip Galvanized Steel Plank catwalk 450*45*1.2*1829 CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Description of Hot Dip Galvanized Steel Plank catwalk 450*45*1.2*1829

  • Material :Q195 (Carbon 195 Steel)

  • Size :450*45*1.2*1829mm with hooks

  • Surface treatment :galvanized

  • Color : silver

     

     

     

  • ​Hot Dip Galvanized Steel Plank catwalk 450*45*1.2*1829 CNBM

  • ​Hot Dip Galvanized Steel Plank catwalk 450*45*1.2*1829 CNBM

  • ​Hot Dip Galvanized Steel Plank catwalk 450*45*1.2*1829 CNBM

  • Futures of Hot Dip Galvanized Steel Plank catwalk 450*45*1.2*1829

  • Hot dip galvanized steel plank is an ideal Economical & Eco-friendly scaffolding solution for Scaffolding system and Formwork system. A perfect choice for safety & low-cost & high-efficiency construction projects.

  • Even load capacity: >7kN/ m2  

  • Max span < 2m & Recommended span between 1.2-1.5m.

  • Side box design with better anti - deforming capability

  • 3 strengthen support designs with much stronger support force

  • 500mm support spacing with better anti - deforming capability

  • hot dip galvanizing surface & lifespan > 5 years

  • Punching design to anti-skid & lighten weight

  • Stiffener design with reinforced the load bearing capacity

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How were scaffolds used in the 1800s?
Mostly the person would be taken onto the scaffold , a rope fixed around their neck, and then the trap door would open and they would drop through and choke to death , very rarely did the neck break in those days , so relatives and friends would pull on the legs , thus to speed up death. Earlier in history people were strung up from trees , and sometimes stood in the back of a cart which was driven away leaving them dangling. The platform on which the guillotine was stood was also called a scaffold at times. These executions were turned into social events and hundreds of people used to go to look.
Q:does anyone know where i can find dimmesdale's confession (at night) of his sins upon the scaffold.?
Dimmesdale does not confess to his crimes on the scaffold at night, but he does meet with Hester and little Pearl on the scaffold while Chillingsworth watches. (pg. 220) His public confession comes at the end of the book during the day time and then he dies.(pg. 367) Follow the link I have attached and type in the page numbers in the little box near the top of the page.
Q:A painter is standing on a scaffold raising at a constant speed. He pushes a can over at 15.00 meters.?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt² 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s²)(3.25 s)² vo = +20.5 m/s
Q:What are the characteristics of Pankou scaffolding
Pankou scaffold has the advantages of low cost and high efficiency of the hitherto unknown advantage. Comprehensive consideration of the company's future worries, no need to worry too much about frequent accidents, high cost of substantive issues.
Q:Cantilever beam type scaffolding can not exceed the maximum number of not married
Cantilever scaffold cantilever beam fixed method is as follows:1, the floor in the rebar at the same time, the embedded two door shaped clamp, each clamping hoop is composed of 2 14mm grade steel made a root diameter, the first door shaped clamp from the wall 450mm, second door shaped clamp from the other end of the 350mm, the door shaped card hook stirrup slab reinforcement, to meet the requirements of the anchorage the cantilever beam, door shaped clamp is inserted in the middle, but also with a fixed electric welding.
Q:21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
Q:opinions on scaffolding piercing and how to hide it from school :)?
Why do you have to hide it? It's an ear piercing. And to hide it, just cover it with your hair.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
Q:How to solve the problem of scaffold pipe repair
Easy to move, straightening, derusting, ash removal, painting can be completed on the same machine at the same time, labor saving, labor-saving, easy to operate, can be adjusted 48mm Phi - Phi 51mm of all types of steel pipe
Q:industrial/scaffold piercing question?
trust me, bro. bad idea. industrials are very tempermental at best. your helmet will cause every problem possible. any descent piercer would tell you the same. don't do it. they take up to a year to heal soif you really want one, quit football or wait til you're out of school.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range