• Hot Dip Galvanized Scaffolding Tube 48.3*3.75*6000mm Q235B Steel  EN39/BS1139 for Sale CNBM System 1
  • Hot Dip Galvanized Scaffolding Tube 48.3*3.75*6000mm Q235B Steel  EN39/BS1139 for Sale CNBM System 2
Hot Dip Galvanized Scaffolding Tube 48.3*3.75*6000mm Q235B Steel  EN39/BS1139 for Sale CNBM

Hot Dip Galvanized Scaffolding Tube 48.3*3.75*6000mm Q235B Steel EN39/BS1139 for Sale CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Galvanized Scaffolding Tube 48.3*3.75*6000mm Q235B Steel EN39/BS1139

  • Material :Q235B/Q345B

  • Size : 48.3*3.75*6000mm

  • Surface treatment :Black/Painted/Galvanized

  • Standard:EN39/BS1139


  • Hot Dip Galvanized Scaffolding Tube 48.3*3.75*6000mm Q235B Steel  EN39/BS1139 for Sale CNBM

  • Hot Dip Galvanized Scaffolding Tube 48.3*3.75*6000mm Q235B Steel  EN39/BS1139 for Sale CNBM

  • Futures of Galvanized Scaffolding Tube 48.3*3.75*6000mm  Q235B Steel EN39/BS1139

  • Galvanized Scaffolding Tubes confirm to BS 1139/BS EN 39 Standard. We have a big factory producing galvanized Scaffolding tubes 25,000 tons each month, and 90% of them are for export. Our scaffolding tubes are widely used in all kinds of construction site such as oil and gas industry, refinery industry and infrastructure in over 20 countries.

  • We have a wide range of round scaffolding tubes. If you require a specific size, such as different thickness or different length, please send us your detail requirements. Our quotation will always base on your requirements.

  • Hot Dipped Galvanized Scaffolding tubes are also known as scaffolding pipes, scaffolding poles, and galvanized steel tubes, round galvanized tubes.

  •  

  • Size: 48.3 X 3.75X 6000mm
    Zinc Thickness: 40 micron
    Surface: hot Dipped Galvanized 
    Water Proof: according to customer requirements.
     


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:What are the safety requirements for the dismantling of construction scaffolding
(3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.
Q:I'm gonna be getting piercings this weekend, so i know im already getting my nose. but i want to get my ear. like barbell? so what's the difference between Scaffold and Industrial?
They're the same thing. Different places call them different things.
Q:Want to rent the scaffolding in the county, you need to cast how much money
Look what you want to do. Store rent is not.
Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.
Q:what are two burdens for each character? What action does each character indicate that she or he is indeed free from their burdens?
Tell me what you know and I will elaborate. I had to read this book for a class and hated it, but I won't do your homework for you. I will help if you show you read it yourself and put in some effort we can see
Q:..or anytime around whenThe Scarlet Letter was written.I am doing a paper on why the three scenes at the scaffold were so significant.So I decided to include the history of scaffolds, but I can't seem to find any information on them.help please? :]SOURCES..if possible! :]
Execution by hanging.
Q:Scaffolding installation and precautions?
When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.
Q:i already found the force in rope 2 but im not getting the force in rope 1.
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
i got mine (industrial) almost 8 years ago and it cost me $42. it hurt, they do it with one needle and just go straight across your ear. my mom nearly cried when she saw it. it feels really hot and sore after you get it and you have to constantly turn the bar in your ear to prevent infection and a keloid scar. i had a keloid scar on my ear from it and when i started working i was asked to take it out. it smells funny sometimes but i loved having it. kinda miss it now. good luck! xo
Q:how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords