​Hot Dip Galvanized Joint Pin 36*1.5*235 for Scaffolding CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
300000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Description of Hot Dip Galvanized Joint Pin 36*1.5*235 for Scaffolding.

  • Material :Q195 Steel

  • Size : 36*1.5*235

  • Surface treatment :galvanized

  • Color : silver

  • Diameter:36mm

    Package: By pallet

  • ​Hot Dip Galvanized Joint Pin 36*1.5*235 for Scaffolding CNBM

  • ​Hot Dip Galvanized Joint Pin 36*1.5*235 for Scaffolding CNBM


  • Hot Dip Galvanized Joint Pin 36*1.5*235 for Scaffolding Futures:

  • Scaffolding joint pin connects rods up to down and make sure standard uniform stressed and structure stabilized.

  • Rods cost less steel with reasonable use of material. This stable structure is cost-saving in steel consumption and high in bearing capacity.

  • Standard size and reasonable structure

  • Beautiful and durable 

  • Easy for assemble and dismantlement

We can offer the Joint Pins for Scaffolding as the following (OEM accepted also):


  • What are the advantages of your products?

  • Experience: over ten years in scaffolding manufacturing.

  • Quality: Certified by SGS, BS1139, EN74, Local Test Report.

  • Price: Moderate, Reasonable.

  • Service: Friendly and Responsible. OEM service is available.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scaffold Piercing Aftercare?
i love my scaffold/business piercing i do not imagine it hurts yet some human beings say it does Coast round £25/30 - any more desirable than its a rip off. this is a soreness to heal and takes a lengthy time period! each and every time I knocked mine it swelled and went humorous. extremely stressful. Had it executed 3 cases, 1st time it grew out, second time I only took it out. third time I were given it pierced on my different ear and at the same time as it became healed I replaced it to a versatile bar and for the reason that then this is been suitable. desire I helped.
Q:What's an antonym for the word scaffold?
Since a scaffold is a bridge/ladder/support used to allow you to span the gap between you and and object you wish to reach, I'd go with barrier.
Q:Are Nuclear Matrix and Nuclear Scaffold the same thing?
For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
Q:Is my scaffold peircing ok? x?
If it gets worse you should swear loudly at yourself for being so stupid.
Q:why in medieval times did they always build a new scaffold between beheadings?
Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q:A 115 kg scaffold is 7 m long. It is hanging with two wires, one from each end?
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q:what is common cause of formwork and scaffolding failure during construction?
I believe that you have covered it all. Improper handling covers my first thought; workers carelessness by not following safety guidlines
Q:What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
Take them on the road-trip of course....we'll find some use for them along the way.....
Q:What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
(2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The entire frame cannibalize speed is 3 ~ 5 times faster than conventional, faster effort to fight demolition, workers with a hammer to complete all assignments, to avoid the inconvenience caused by bolt operation; (3) with strong: the main components are the ordinary steel tubular scaffolding steel pipe, steel pipe connecting fastener with general availability in general, strong.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range