​Hot Dip Galvanized H Frame Scaffolding 1219*1930*42*2.4 CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Description of Hot Dip Galvanized H Frame Scaffolding 1219*1930*42*2.4

  • Material :Q235 (Carbon 235 Steel)

  • Size : 1219*1930*42*2.4

  • Surface treatment :galvanized

  • Color : silver

  • Standard: BS1139

    Package: By pallet


​Hot Dip Galvanized H Frame Scaffolding 1219*1930*42*2.4 CNBM

​Hot Dip Galvanized H Frame Scaffolding 1219*1930*42*2.4 CNBM

  • Hot Dip Galvanized H Frame Scaffolding 1219*1219*42*2.0 Futures:

  • A Light & Safe Frame Scaffolding System with low cost.

  • Integrated with the formwork, Toe-board, the cross diagonal tie pole, steel plank, and adjustable support base.

  • The scissors-style push-pull prop designs ensure the high-performance stiffness & load-carrying property

  • The φ36 connecting rods exert an equal pressure.

  • The Surface galvanized plug-pin firmly connected the pull prop & main frame.

  • Adopt the CO2 gas protection welding technology ensures the superior corrosion & oxidation resistance.With Universal wheel (scaffolding wheel).



  • What are your products' advantages?

  • Experience: over ten years in scaffolding manufacturing.

  • Quality: Certified by SGS, BS1139, EN74, Local Test Report.

  • Price: Moderate, Reasonable.

  • Service: Friendly and Responsible. OEM service is available.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the full house scaffolding specification
5 "technical code for safety of steel tubular scaffold for building construction" (JGJ128-2000)6 "construction formwork safety technical specifications" (JGJ162-2008)
Q:Scaffolding stuck, need ideas for removing.?
Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
Q:Classification and erection of scaffolding and related specifications
7, the unloading platform progress specification in our city construction scaffolding scaffolding collapse prevention effect falling accident according to the "construction safety management regulations" "construction of steel tubular scaffold safety technical specifications" (JGJ130-2001) related matters notice: now, the scaffold erection procedures for the implementation of the 1 basic requirements, construction the enterprise construction project before the implementation of special case according to the characteristics of building scaffolding (highly 24m tubular steel scaffolding, cantilever scaffold should be attached to the safety check node) the case should be responsible for the enterprise technology (General Engineering) signed by the chief supervision engineer signature recognition project review organization and implementation review does not pass the special construction case the implementation of
Q:I need to set up scaffolding on a tiled floor to reach some lights 28 ft high?
Put the wheels (locked) on 2 x 12 planks. This will distribute the weight.
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:Is it possible to have the scaffold piercing done separately?
Technically yes but it is better to have them done at the same time so the holes are aligned properly. It is better to get them done at the same time, as the second piercing will be less painful because you are all adrenalin-ed up! Probably cheaper too.
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
some times ppl die because of neglect and lack of mentainance so some have take responsobility for this
Q:How much is the amount of material used to build a square meter double row scaffold? Urgent!
(less than 12 meters), such as how many kilograms of steel pipe, the number of fasteners
Q:What does scaffold one's days mean? kill time?
In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
Q:Should I get a Scaffold piercing and hide it from my parents?
im talking from experience-scaffold piercings are VERY painful, and take a long time to heal. so there wouldnt be any way you could take it out to hide it for a good few months! it really isnt a great piercing to get unless you can openly look after it properly. anyway you shouldnt disregard what your parents say...i know thats what you want to do!lol really though, its very painfull!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range