​Hot Dip Galvanized Cross Brace 610*1829*21.3*1.5 CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Description of Hot Dip Galvanized Cross Brace 610*1829*21.3*1.5

  • Material :Q235 Carbon Steel

  • Size :610*1829*21.3*1.5

  • Surface treatment :galvanized

  • Diameter :21.3-26mm

  • ​Hot Dip Galvanized Cross Brace 610*1829*21.3*1.5 CNBM

  • ​Hot Dip Galvanized Cross Brace 610*1829*21.3*1.5 CNBM

  • Futures of Hot Dip Galvanized Cross Brace 610*1829*21.3*1.5:

  • Couplers in Cross braces’ ends, together with tubes attached to the standards, keep scaffolding structural stabilized. Cross braces’ length is determined by standards and ledger’s length. Converging in one point, this 3 parts belong to two-force member with a concise、reasonable stress distribution.

  • High Safety

  • Convenient for assemble and dismantlement

  • Low maintenance cost




  • What are your products advantages?

  • Experience: over ten years in scaffolding manufacturing.

  • Quality: Certified by SGS, BS1139, EN74, Local Test Report.

  • Price: Moderate, Reasonable.

  • Service: Friendly and Responsible. OEM service is available.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scarlet Letter Scaffold scenes?
do you mean the part where she's on the scaffold with pearl when she's just born or when the three of them hold hands and then the priest has to leave? Well either way, the scaffold means embarrassment, it's like having to wear the A but being more upfront with people so you don't really have to explain yourself, everyone just knows. That's the reason, i forget his name, the priest that's pearl's father, goes up to the scaffold, because no one knows he secretly wears the A that's why going on the scaffold allows him to free himself of guilt, he wanted everyone to know so he would stop living in hidden pain but when pearl and her mother come, it makes it too real for him, he kind of wakes up, you could say, so he becomes too frightened and decides not to carry out his plan.
Q:What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Q:Is it possible to have the scaffold piercing done separately?
Technically yes but it is better to have them done at the same time so the holes are aligned properly. It is better to get them done at the same time, as the second piercing will be less painful because you are all adrenalin-ed up! Probably cheaper too.
Q:Who has external scaffolding construction program
1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.1.1.3 foot plateThe scaffold made of bamboo or bamboo bamboo string plate, each quality should not be greater than 30kg.1.1.4 wall partsThe material of the wall parts shall be in accordance with the provisions of the current national standard "Q235-A" (GB/T700).1.2 inspection of qualified parts should be classified according to the varieties, specifications, stacked neatly, smooth, stacking sites may not have water.1.3 should be cleared to set up the site debris, flat set up the site, and make water flow.1.4 when the foundation of the scaffold has equipment foundation, pipe trench, the scaffolding should not be used in the process of excavation, otherwise it is necessary to take reinforcement measures.
Q:21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q:What are the general specifications of bowl buckle scaffold?
In fact, the conventional bowl buckle scaffold is made of 48 Q235 carbon steel pipe processing, pole specifications are 0.6m, 0.9m, 1.2m, 1.5m, 1.8m, 2.4m, 3.0m; crossbar specifications are 0.6m, 1.2m, 1.5m. The price of any product is determined by its consumption of materials and processing costs
Q:looking for a scaffolding job in dubai can anyone help?
Hi okorder.com, we are Dubai based scaffolding contractor.
Q:In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?
(3) the railings and retaining scaffold deadweight standard value (kN/m); the railings, bamboo amphipodsshouban baffle, the standard value of 0.15NG3 = 0.150 x 7 x 1.500/2 = 0.788 kN;(4) the load of the hanging safety facilities, including safety net (kN/m2); 0.005NG4 = 0.005 x 1.500 x 24 = 0.180 kN;
Q:New features of quick dismantling scaffolding?
The scaffold material for the Q235 high frequency welded pipe diameter 48mm wall thickness 2.75mm-3.5mm can be processed in accordance with the requirements of

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range