Hitachi Escalator Emergency Switch
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 1000 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Packaging & Delivery of Hitachi Escalator Emergency Switch
Packaging Details: As you required!
Delivery Detail:Within three days after order confirmed.
Specifications of Hitachi Escalator Emergency Switch
1.hitachi escalator emergency switch
2.using at the head and end of escalator
3.the fuction is emergen stop
4.for all hitachi escalator
We can provide you all kinds of escalator lock.
YOUR CHOICE:
1.We are able to supply you a large variety of elevator components/ escalator parts of different brands
(a selection of more than2,000 kinds).
2.We can guarantee the product high quality, delivery time and good service.
3.We are able to manufacture according to your specific instructions and help you select appropriate product
and specification for you.
Looking forward to your inquiry!
- Q:You brother ah, sister who can give me a complete waterproof construction program, the basement roof with polyurethane, kitchen and toilet with JS, thank you friends
- Can be downloaded from Google, these two materials approach is very simple and very common.
- Q:Please elaborate
- Lubricants, door machines, light curtains, wire and cable, screw reinforcement. Voltage, etc., but also includes the well machine room cleaning
- Q:Our factory production of gears running noise, want to solve through the grinding method, seeking expert guidance. Question added: We used this method, because we buy grinding machine financial capacity is not realistic, and occasionally heard the gear grinding the processing method, they have tried, is to match the two gears to exert a certain pressure on the grinding sand bite A few minutes, after the experiment found to be able to improve some, but now our process is not good to control the angle of the helical gear, seeking expert detailed instructions, or what better way to solve our helical gear noise problem? More
- I did for 20 years, do not know the gear can also be grinding. In order to reduce the noise 1 by grinding method, you can achieve 5 precision 2 with quilting teeth approach, you can achieve 6 precision 3 high-speed occasions, the method can be coated on the tooth surface to reduce the noise to solve the problem 1 teeth Good shape 2 teeth to better 3 surface roughness is better
- Q:In the airport shopping mall and other public places up and down the stairs or escalators should rely on what to stand?
- On the right side to let the left side of the channel, the left for the fast track
- Q:What are the general items of a construction project
- Hello, generally there are templates, steel, concrete, masonry, plaster, doors and windows, finishing and other sub-projects
- Q:For example, what records, is not to monitor what the third party? The More
- Elevator overhaul formalities; first reported to the local special inspection hospital, to be approved after the overhaul, overhaul units have a large valve, such as the replacement of accessories or changes to the procedures. And then need to test the local special inspection again before the normal use.
- Q:Hitachi Elevator out of the 61 with the door of the lock after the opening of the arrow outside the instructions to flash how to repair
- May be caused by the connection of the motherboard. May be caused by damage to the internal parts of the machine. It is recommended to contact the maintenance staff can be repaired. An elevator is a motor-powered vertical lift with box-like pods for multi-storey construction or cargo. There are steps, stepping board mounted on the track for continuous operation, commonly known as escalators or automatic sidewalks. Serving the floor of the fixed lifting equipment. The vertical lift elevator has a car running between at least two rows of rigid or inclined rails with an inclination angle less than 15 °. Car size and structure to facilitate the passengers access to or loading and unloading of goods. It is customary to use the elevator as a general term for vertical traffic in a building, regardless of the way it is driven. According to the speed can be divided into low-speed elevators (1 m / s below), fast elevators (1 ~ 2 m / s) and high-speed elevators (2 m / s or more). The mid-19th century began to appear hydraulic elevator, is still in the low-rise buildings on the application. In 1852, the United States E.G. Otis developed a wire rope lift safety lift. 80 years, the drive device to further improve, such as the motor drive through the worm drive winding reel, the use of balance weight and so on. At the end of the 19th century, the use of friction wheel drive, greatly enhance the lift height of the elevator.
- Q:What is chemlon533G material?
- Polymer Materials?
- Q:Grocery elevator is always automatically anti-leveling what is the reason
- The motherboard set the time to return to the base station, or lock ladder are likely to have this problem
- Q:What are the electrical parts of the elevator and what are their roles?
- The control system (including the main board, car plate, instruction board, layer display board) is responsible for the elevator start, run and stop. Flat sensor: elevator leveling detection switch; door machine system (including door and door machine frequency converter): responsible for the elevator door. 2, safety touch panel and light curtain: car door entrance security protection; 3, limit switch: forced elevator stop of the terminal switch (in the bottom and the top of the set), the safety of the system, 4, the buffer: the roof of the elevator and the end of the end of a protection switch. Drag the system: traction machine, inverter, etc. to provide elevator running power;
1. Manufacturer Overview |
|
---|---|
Location | Jiangsu,China (Mainland) |
Year Established | 2006 |
Annual Output Value | US$50 Million - US$100 Million |
Main Markets | North America; South America; Eastern Europe; Southeast Asia; Africa; Oceania; Mid East; Eastern Asia; Western Europe; Central America; Northern Europe; Southern Europe; South Asia; Domestic Market |
Company Certifications | ISO Certificate |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Taicang PORT,Shanghhai PORT |
Export Percentage | 41% - 50% |
No.of Employees in Trade Department | 6-10 People |
Language Spoken: | English, Chinese |
b)Factory Information | |
Factory Size: | 5,000-10,000 square meters |
No. of Production Lines | 3 |
Contract Manufacturing | OEM Service Offered Buyer Label Offered |
Product Price Range | Low and/or Average |
Send your message to us
Hitachi Escalator Emergency Switch
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 1000 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords