High Tech 300 Rotary Drilling Rig New Design for Sale

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

High Tech Rotary Drilling Rig New Design for Sale 

High Tech 300 Rotary Drilling Rig New Design for Sale

Product Features:

 

 Features of   Chassis :

>>It is high working stability   equipped with expert chassis Which is under advanced design. 
  >>It is controlled to extend when working and retract the crawlers by   fully hydraulic with The proper center of Gravity design to make the drilling   rig with high stability.  

 


 

 Drill Mast:

>>Auto lift and fall of the drill   mast, convertible and Three section of box-type of drill mast reduce the   length and height;
  >>Parallelogram articulated and triangle cylinder positioning   supporting arm structure actualizes the high stability and rigidity and easy   lifting and falling; 
  >>Install gooseneck boom-cylinder on gooseneck boom and telescopic   supporting leg in bottom of the drill Mast to increase the working   efficiency.


 

 Features of upper   frame:

>>Unique body lever, use bracket   for upper frame, adopting the leveling cylinder is better than mast leveling,   and makes the operator more comfortable.


 

 Features of   engine:

>>Volvo boostmid-coolelectrical control   for engine,strong momentum,it can work at the place with 4,500m above sea   level with normal condition, Euro 3 emission standards.


 

 Features of rotary   drive:

>>Double-motor, double-reducer in   the rotary drive, powerful output torque, high ability of stressing. It is   with good adaptivity, the speed and output torque can auto-change with   different geological conditions; 
  >>It is installed hydraulic circle systems for separated lubricationcooling and speed changing system to ensure the reliability and   high effciency of power head.

 


 

 Features for   operating cabin:

>>The operating cabin to supplying   the comfortable working place for operator is with all-weather design,adopt   sound-proof material,elastic shock absorberimported adjustable seat, environmental air conditioner. 
  >>The layout for all the apparatuses and operating rods are clear, easy   operating. Colorful LED display, monitor the positioning of pile, the   balancing of the drill mast and the functions of the engine and hydraulic   system.

 


 

 Features for   hydraulic system:

>>Main hydraulic pump system,   hydraulic pilot-operated, constant power control.
  >>Hydraulic auxiliary pump system: load-sensitivity, hydraulic   pilot-operated, proportion control, fast responding, low energy consumption;   adopt unique load-flow control valve.
  >>Unique lubricated circuit for rotary drive: solve the problem of   mixing oil between lubricant oil and hydraulic oil.
  >>Balancing valve: the balancing valve for amplitude cylinder and drill   mast cylinder with non-pressure design make the speed lifting and falling   more stable for drill mast and amplitude mechanism to prevent the big shock.

 


 

 Features for   control system:

>>It can be real time monitored by   integrated electronic control system when working, and featured with 16   warning functions.
  >>Verticality automatic leveling system of drill mast can monitor the   lifting and falling and control the verticality of drill mast.
  >>Dynamic and digital display of all execution components on   intelligent diagnosis system.
  >>Rigorous logical interlocking control to prevent wrong operation by   operator.
  >>Accurate measurement for drilling depth: the mistake can be   controlled less than 10mm, 1mm for drilling depth by unique depth measurement   device.

 


 Features for   operating system:

>>Display operation: set up every   limit unlocklevel the   perpendicularity of drill mastthe reset of state   parameter of working for engine,set up the logical relationship of drilling   rig.
  >>rod operation:
  A.main work:CW/CCW for rotary drive; rotation of upper frame; operated by a   press or draw hydraulic cylinder;drilling tools lift and fall.
  B.auxiliary work:lift and fall of luffing mechanism; rotation of upper frameauxiliary winch lift and fall.
  C.operating rod for working mechanism:forwardbackward and turn around of the main machine.
  D.operating for drill mast:operating the rod to make the drill mast lifted   and fell.

Parameter:


ParameterModelTW300
Max.drilling Diameter (mm)Distance From Center Of Rotary Drive To Slideway Of Mast1140
Max.drilling Diameter2500
Max.drilling Depth(m)
90
EngineRated Power(kw)tab1641 375
Max.output Speed(TW/min)2100
Rotary DriveMax.output Torpue(kN.m)300
Output Speed(TW/min)8~28
Main WinchMax.lifting Force(kN)320
Diameter Of Steel Rope32
Auxiliary WinchMax.lifting Force(kN)120
Diameter Of Steel Rope20
Mast InclinationSide Inclination (°)5
Forward Inclination (°)5
Backward Inclination(°)90
Pull-Down CylinderMax.pull-Down Piston Push(kN)240
Max.pull-Down Piston Pull(kN)260
Stroke(m)5.3
UndercarrigeTrack Total Length(mm)6000
Track Plate Width(mm)900
Track Width(mm)3400~4600
Max.traveling Speed(km/h)1.5
DimensionWorking Condition Dimension(mm)11630×4800×24350
Transportation Dimension(mm)3500×3400×16900
Upper Frame Height(mm)1400
Upper Frame Width(mm)3100
Undercarrige Height(mm)1300
Rotary Radius(mm)4600
Overall Weight(t)
90


Application of prodcts:


Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Rules for operation of impact pile drivers
Two, piling construction process, before piling construction, in the construction site around the axis control network testing and protection, and do a good mark, and transfer procedures. The construction process is as follows: lofting pile two Pile Lofting pile pile on pile machine machine alignment machine to feed the pile piling pile verticality correction electric welding welding cooling design requirements to stop piling pile hammer machine machine three, hammer pile construction technology and quality control measures of each Pile Lofting after two times of review and correct aligned with the pile location insert, the first section is slow into the retaining pile verticality, upper and lower section pile after aligning welding, welding inspection by the parties after natural cooling time to meet the requirements after piling, final penetration and elevation controlled by the supervision, party a visa confirmation after the stop hammer machine construction. (1) the quality of the pile is guaranteed by 1. After each pile comes into play, the pile shall be discharged after passing the qualification evaluation (including the qualification certificate, the pile type, the date of manufacture, the appearance quality, etc.), and the pile shall be stacked in plain and not too high layers.
Q:What kind of excavator like excavator is easy to learn?
Is a rotary drilling rig, difficulty varies, excavators than boring work.AskI'm not talking about steel plate piles!Chasing the answerYes, it's broad. There is steel wire hanging. It's boring, too
Q:Bridge pile driver is a stone below, how to do?
What's your machine, please? If your machine is an impact drill, I suggest you use the hollow hammer. The ventilation is fast, the cross drill is easy to break, the side is slow, and several drilling rigs have their respective numbers. Next time they are talking to you
Q:Where do I learn to build a pile driver?
Test piling permit can be trained by way of evidence, I have worked over these special operations personnel, piling a lot of points, see you want to learn that, 1. diesel hammer pile, 2. static pressure pile,.3 punching pile, 4. rotary pile,.5 drilling brick, and so on. All belong to special operations personnel, must obtain relevant documents to allow induction job, if there is an acquaintance of learning, soon get started.
Q:What brand of pile driver is good 10?
Qingyuan Xin Feng Machinery Factory production of 2 Taiwan good ~ we are the brand ~ I just listen to my father said that the specific amount should be 200 thousand ~ a ~ details of your advice of high manager soldiers accounted for ~ should Baidu can be found in the.
Q:What role does piling play in buildings?
The effect of pile driving improves the bearing capacity of foundation. There are many kinds of piles, such as lime soil compaction piles, cast-in-place piles, friction piles, etc., the form and the name are all many, the purpose is to let the building have a stable foundation, and avoid the later settlement and so on.The depth of the pile is determined in terms of the condition and depth of the supporting layer and the condition of the proposed building.The hydraulic pile simply means to press the pile into the ground using the hydraulic principle. Hydraulic pressure is the means, no matter what process is adopted, the purpose is to improve the bearing capacity of the foundation.
Q:What are the types of pile drivers? What are the characteristics of each?
Pile foundation treatment has many ways, but according to the current market situation and the country's strict requirements for the foundation, many processes are not applicable, such as manual excavation, etc., the following are common and common process methods.According to backfill points: commonly used are lime soil pile, plain soil pile, cement pile, garbage pile and so on.According to the backfill compaction type: clamping rod hammer compaction, heavy hammer compaction
Q:120KW piling machine needs a lot of air?
250A will be enough, but quality is good.
Q:Which manufacturer is better for highway guardrail and pile driver?
There are many manufacturers of pile drivers now. Do you buy them online or offline?
Q:What are the types of construction piling? What are the characteristics?
The main load of single pile is the cast-in-place concrete pile with rotary drilling holes.The above is the classification of the process, and how many layers are suitable for the construction. This is not clearly defined. It mainly depends on the geological conditions and the superstructure. Who can tell you clearly that it is all Mongolia?.According to the above features you can see, generally divided into two categories, diesel hammer hole, drill hole, Luoyang shovel into the hole is used more, low cost, suitable for Northwest collapsible loess, the pile can eliminate the collapsibility of loess geology, increase the original basis composite bearing capacity. The pipe pile should be chosen according to the address condition, and the construction cost is high. According to the geological difference, sometimes the diesel hammer or drilling machine is needed to carry out the pre boring operation. Rotary drilling drill across the country for a variety of industries (work, the DAB, railways, highways, bridges, etc.), is the best way to operate a single pile.Specific choices are based on geological conditions and superstructure, and geological moisture content is also a key. I am engaged in the foundation construction, any questions contact at any time. Of course, there is a better engineering, ha ha, all kinds of machinery are available, are free equipment, reasonable price appropriate.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range