High-strength non shrinkage grouting material superfine

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
2000吨 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

A, grouting material product introduction:

Grouting material with special cement as binder, selected high strength materials as aggregates, with high flow, micro expansion, anti segregation and other material prepared.

The product has good gravity flow, rapid hardening, early strength, no shrinkage, expansive; non-toxic, harmless, non aging, on water quality and no pollution to the surrounding environment, self sealing good, rust and other characteristics. In the construction aspect with reliable quality, reduce the cost, shorten the construction period and convenient advantages. To fundamentally change the equipment base force, so that the whole load uniformly bear device, so as to satisfy all kinds of machinery, electrical equipment (heavy equipment of high precision grinder) installation requirements, is the ideal filling material without pad mounted era.

Two, the scope of application:

Grouting material is mainly used for: the anchor bolt anchor, runway repair, nuclear power equipment, Luqiao fixed reinforcement engineering, machine base, steel structure and foundation with export, equipment foundation grouting, planted two times buried reinforced, concrete structure reinforcement and reconstruction of old concrete structure, crack control, electrical and mechanical equipment installation, track and installation of steel structure, static pressure pile engineering piles, structure of the wall thickening and repair the leakage, all kinds of foundation engineering collapse grouting and various repair engineering etc..

Three, the conventional physical properties of grouting material:
Model No.
Compressive strength(MPa)

Vertical expansion rate

(%)
Fluidity

Grip strength

Round steel.

MPa
The bleeding rate(%)
Remarks
6h
1d
3d
28d
1d

The initial fluidity

30min Fluidity retention value
28d
Universal type
--
≥15
≥30
≥70
≥0.02
≥260
≥230
≥4.0
≤1.0

High strength

--
≥30
≥40
≥70
≥0.02
≥260
≥230
≥4.0
≤1.0

Early strength type

≥20
≥30
≥40
≥60
≥0.02
≥260
≥230
≥4.0
≤1.0
High early type
≥22
≥30
≥40
≥70
≥0.02
≥260
--
≥4.0
≤1.0

Super flow type

--
≥15
≥25
≥50
≥0.025
≥300
≥250
≥3.5
≤1.0
High temperature resistant type
--
≥22
≥40
≥60
≥0.02
≥260
≥230
≥4.0
≤1.0

The engineering design reference: anchor bolts for anchoring cement

380
340
290
270
The maximum set size(mm)
≤4.75
>4.75and≤16
Fluidity(mm)

The initial flow

≥380
≥340
≥290
≥270*
≥650**
30min retention value
≥340
≥310
≥260
≥240*
≥550**

Vertical expansion rate

(%)
3h
0.1~3.5
24h and 3H expansion difference
0.02~0.5
Compressive strength(Mpa)
1d
≥20
2d
≥40
28d
≥60
There is no corrosion of reinforced
NO

Qinshui rate

(%)
0



The engineering design reference

Cement based grouting material choice for anchoring bolt anchor

The spacing of the surface of the bolt and the hole wall(mm)

Cement based grouting material categories
15~50

340、290

50~100
290、270
>100
270

Cement based grouting material selection with two grouting:

Filling layer thickness(mm)

Cement based grouting material categories
5~50
380
20~100
340
80~200
290
>200
270



Four, product characteristics

"Pour 1-3 days after high early strength was as high as 30Mpa, shorten the construction period.

Since the flow field - just add water, stir, direct filling equipment foundation, mortar self construction, free vibration, ensure the grouting construction of long distance without vibration.

Casting body is used for a long time without shrinkage / micro expansion, to ensure that equipment and basic close contact, no shrinkage between the foundation and foundation, and appropriate expansion of the compressive stress to ensure the long-term safe operation of equipment.

* anti oil leakage after 30 days soaking its strength in the oil increased by more than 10%, molding, compacting, impermeability, adapt to the base oil of environmental protection. * durability 2000000 times fatigue test, 50 times freeze-thaw environment test strength has no obvious change.

"Good weather -40 to 600 DEG C is safe for long-term use

* low alkali corrosion resistance of the strict control of raw material of alkali content, suitable for alkali aggregate reaction inhibiting requirements engineering.

Five, the use of methods

1 Foundation Treatment

Cleaning equipment based on the surface, there shall be no stone, laitance, dust, dirt and other debris demoulding agent. Before grouting 24h, fully moisten the surface of equipment foundation. Before grouting 1H, should be sucked up water.

2 determine the grouting method

According to the actual situation of equipment base, selection of grouting method of corresponding flow, because of its good performance, in general, with "weight grouting" can, will paste directly from template export poured into slurry, completely rely on the self weight to leveling and filling the whole filling space; if a large area, especially the complex structure of perfusion or a very small space and distance, can use "high funnel method grouting" or "pressure grouting, grouting method" to ensure that the slurry can be fully filled every corner.

3 formwork

According to the grouting and grouting construction diagram determined by the way of support design templates, template location elevation should be higher than the equipment on the base surface of at least 50mm, template must support of a tight, firm, to prevent loosening, leakage.

The 4 stirring grouting material

According to the water feed products recommended certificate than the amount of water, mixing water should be used to drinking water, the water temperature to 5 ~ 40 degrees is appropriate, can use mechanical or manual stirring. By mechanical mixing, stirring time is generally 1 to 2 minutes. The use of artificial mixing, should first join 2/3 with water and stir for 2 minutes, then add the remaining water to continue to stir until evenly, standard consistency water volume is 12%-14%.

5 grouting

Grouting construction should meet the following requirements:

(1). The slurry should be poured into the side, until the other side overflow until, in order to facilitate the discharge between the device frame and concrete foundation of air, so that the filling, not from the four sides of the grouting.

(2). The grouting after the start, must be continuous, not interrupted, and should be possible to shorten the filling time.

(3). During the grouting process should not be vibrated, when necessary, available bamboo laths were pulling the diversion.

(4). Each filling layer thickness should not exceed 100mm.

(5). The grouting long equipment or track foundation, should use the segmental construction. The length of each section is appropriate in 10m.

(6). The grouting process such as the discovery of surface bleeding phenomenon, can dispenser a small amount of dry material, sucking up water.

(7) for the foundation of equipment grouting layer thickness is greater than 1000mm in large volume, stirring grouting material according to total ratio 1:1 join 0.5mm stones, but the required test for determining the groutability can not meet the requirement.

(8). The equipment foundation grouting is completed, should be removed part shall be treated in the grouting layer before the final setting.

(9). In the grouting construction process should be avoided until the mold, filling layer by vibration and collision, so as not to damage the pending grouting hard layer.

(10) the horizontal distance between the template and the equipment of the base should be controlled at around 100mm, in order to facilitate the grouting construction.

(11) slurry filling in phenomena such as appearance, should be timely treatment.

(12) when the equipment foundation grouting amount is larger, should adopt mechanical agitation mode, in order to ensure grouting construction.

6, maintenance

(1) after grouting is finished. In 30 minutes, immediately spray curing agent or covered with plastic film and affix rockwool were maintenance, or in the grouting layer after the final set immediately sprinkler wet maintenance.

(2) in winter construction, conservation measures shall be in accordance with the "reinforced concrete construction acceptance norms" (GB50204) the relevant provisions.

(3) at different temperature curing time and removal time schedule

Daily minimum temperature (c) time of stripping (H) curing time (d)

         -10 - 0                96                    14

0 -5                             72                    10

5- 15                            48                     7

15                              24                    7


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Bathroom wall brush flexible waterproof, stick wall bricks easy to fall off after it? Is not tiling cement to add 901
Not necessarily, this specific situation you need according to the nature of your waterproof paint at that time to decide your next construction material. If you are not very understanding of this line, it is recommended that you information professional construction workers, workers long-term exposure to a variety of waterproof materials, the material properties of which is relatively more than the Shanghai high-crossing fishing for more familiar with each other. So, the information field workers will be better.
Q:Promise insulation mortar and hollow glass beads non-polar insulation mortar What is the difference
This is only the glass beads particles, then the inorganic insulation mortar is made of glass beads and each other with the powder plus powder Together with the name, but now as long as the use of glass beads material insulation materials we all refer to are inorganic insulation mortar, my buckle is what you do not understand you can add me to learn more
Q:I would like to use waterproof coating and mortar waterproof together to do bathroom waterproof can you? What kind of material with what?
Can ah ... it is a very good combination, the equivalent of just the length of the long Fu Fu Ying-hua bronze expansion. Waterproof paint, choose JS waterproof coating waterproof mortar, choose the market sales of waterproofing agent mixed with the home of the cement and sand mixed with the formation of waterproof mortar .. would like to ask, you are their own decoration? Is a simple bathroom, but the family has a bath what? If so, the developer has done a waterproof before the delivery, you can only choose a way. Pay attention to do 24h waterproof test, the general decoration workers will know to tell you.
Q:What is the difference between a waterproofing agent and a waterproof coating?
Waterproof coating contains waterproofing agent, waterproof mortar, waterproof emulsion. Waterproofing agent is just one type of waterproof coating!
Q:Are those materials in the construction project required to be tested?
Are those materials in the construction project required to be tested?
Q:What kind of material does the concrete model use? Mortar can be used directly?
The site to the point of cement, sand, stone, 1: 2: . add their own water on the line, no more complex.
Q:The use of cinder and other waste slag production of brick materials to enjoy what preferential policies
Construction materials, refers to the brick (excluding sintered ordinary brick), blocks, ceramic, wall, pipe, concrete, mortar, road covers, road fence, fireproof materials, refractory materials, insulation materials , Waste residue refers to mineral processing waste residue, smelting waste residue, chemical waste residue and other waste residue The proportion of slag and the proportion of raw materials used in the production of raw materials, shall be calculated in terms of weight, shall not be calculated in terms of volume
Q:1 square mull retaining wall is equal to how many square stone
Molding concrete construction, the participation of the rough stone is generally about 25% of the volume, the amount of data provided above is one of the need for rough stone 1.15m & amp; Way to verify each other.
Q:Is the cement-based waterproof coating the same as the cement-based infiltration crystal?
The former includes the latter, the latter is just one of them
Q:JS waterproof paint how, advantages and disadvantages of what are each?
JS composite waterproof coating is the introduction of advanced technology and key raw materials, organic liquid and inorganic powder compound made of two-component waterproof material. The main features are: . wet surface construction; coating tough high strength. . add the pigment can be made of color decorative layer. . non-toxic, tasteless, can be used for water consumption of the pool. . for a facade material wall, inclined roof of the waterproof, facade, slope and the top of the construction, with the base and facade brick, roof tile, cement mortar and other outer material firmly bonded. . high temperature (140 ℃), especially for road and bridge waterproof. . adjust the mix ratio, can produce ceramic tile bonding materials and sealing materials. Construction process: . the base surface requirements of flat, solid, clean, no water, no leakage, rugged and cracks must first leveling, yin and yang angle should be made arc angle .. accurate ingredients: The product has been strictly in accordance with the requirements of the packaging requirements, the use of powder only while stirring slowly added to the corresponding liquid material, and fully stir to the uniform and delicate mixture without particles. . coating essentials: ① with a roller or brush coating, according to the order of the selected method to complete the layer.② If the paint (especially the primer material) precipitation should be synchronized at any time. ③ coating should be as uniform as possible, Can not be localized. ④ The interval between the layers before the layer of dry film is not sticky ⑤ ⑤ ⑥ method Ⅲ in the lower coating, non-woven layer and the coating must be continuous construction. And other waterproof material The difference is really bad to say because the waterproof material at least one hundred different kinds of the difference may be great I am not a professional waterproof also said that is not clear

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range