High-speed Rail Dedicated Batching Plant

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
1
Supply Capability:
50 /month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • High-speed Rail Dedicated Batching Plant


  • Features:

  • 1.There is optional humidity and temperature tester inside of mixer, can achieve the test of temperature and humidity to control system, insure the stability of the high performance concrete. 

    2.Completely computer control, with function of formula storage、automatic fall compensation、moisture content automatic compensation、result automation storage、printing etc.

    3.High quality sensor and weighing meter with high precision and s short response time. 

    4.French Schneider electric elements with advanced manufacturing technology and high reliability 

    5.High reliability industrial computer with optimized design and advanced function. 

    6.Modular design and simple installation and debugging, short time. 

    7. Whole sealing structure of the main building and material convey system, De-dusting effect exceed the national standard requirements. 

    8.Four pictures remote monitoring system make the running status be clear at a glance. 

    9. Humane working interface, easy for operation and management. 

    10.There is power-off protection in the mixer maintenance channel to insure safe and reliability. 

    11.Batching system adopts double door with coarse and fine scale design, the batching speed is fast and precision is high.

  • Parameters:


  • TypeHZS60HZN60HZS90HZN90HZS120HZN120HZS180
    Theoretical Productivity(m³/h)60609090120120180
    MixerJS1000MP1000JS1500MP1500JS2000MP2000JS3000
    Batching SystemPLD1600PLD1600PLD2400PLD2400PLD3200PLD3200PLD4800
    Discharging Height(mm)4100410041004100410041004100
    The Max. Diameter of the Aggregates(mm)60(80)60(80)60(80)60(80)60(80)60(80)60(80)
    Automatic Cycle Period(s)60606060606060
    Weighing Precision of Aggregate±2%±2%±2%±2%±2%±2%±2%
    Weighing Precision of Cement±1%±1%±1%±1%±1%±1%±1%
    Weighing Precision of Water±1%±1%±1%±1%±1%±1%±1%
    Weighing Precision of Additive±1%±1%±1%±1%±1%±1%±1%
    Power(KW)106114145145175175215

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Classification of concrete mixing stations
There is the distinction between level 1, level 2, level 3. Because some projects, especially the project of the state, are required to provide the units of concrete, and the quality is low because of the low quality. There is a clear list of bids in general.
Q:The main components of a mixing station
Feeding system: aggregate bucket, aggregate weighing hopper, flat belt machine, inclined belt conveyor. Mixing system: the main machine is a double-deckshaft mixer, reducer, cement weighing hopper, water and additive weighing hopper. Cement supply system: cement warehouse, screw conveyor, air compressor, screw electronic. Automatic water supply system: water tank, pump, pipe. Electrical operating system: computer console, electric control cabinet, operation room. Operation control system: microcomputer control or manual control.
Q:What raw materials and equipment do you need for your own admixture?
The admixture of concrete mixing station using a lot of more phyletic, the effect is different also, early strength agent, retarder, water reducing agent, and release agent, antifreeze, etc., which is a kind of do not know you to call. The admixtures are usually made by professional manufacturers, and the ingredients are not the same.
Q:How long does it take to build a concrete mixer station?
Normally, between one and three weeks. Plan the main points of the stirring station Venue: single 2m3, 3m3, the equipment occupies an area of about 21mx51m. Add in the yard, parking lot, road, office building, repair shop, recycling pool and so on, usually need the site 40mx80m (the land of 5 acres). 2m3 and 3m3 stations usually require 60mx80m (7.5 acres). If the location is more complex, the layout of the equipment should be based on the utilization of the site. To reduce the cost of future operations, it is suggested that there be a river at the edge of the site so that it can be used to carry sand stones. Distance should consider the best range of concrete delivery vehicles, not too far away from the main site, but also for future development. Optional: choose according to the expected amount of concrete. In a year of 300 working days, eight hours a day, the actual efficiency is lower than the nominal value given the various factors that are affected. Considering the requirement of the equipment for regular maintenance and maintenance, and the requirement of the high demand in some period, it is suggested that the equipment should be purchased. In some areas, the construction of new concrete and concrete stations must be at least two.
Q:Concrete mixstations belong to no special equipment
Special equipment is referred for life safety, greater danger of boilers, pressure vessels (including gas cylinders, hereinafter the same), pressure pipes, elevators, lifting machinery, passenger ropeway, large-scale amusement facilities. The boiler, pressure vessel (air bottle), pressure vessel is the pressure type special equipment; Elevator, hoisting machinery, passenger rope and large amusement facilities are special equipment for mechanical and electrical equipment.
Q:What is the special work of the concrete mixing station
The ratio of the concrete particles to the surface area, the shape of particles, the density of the particles and the grading of the particles, etc., are very important to the liquidity of the slurry. Smaller than surface area, the particle shape is closer to the ball, bigger, more filling and more liquid. By optimizing these factors, you can obtain the most appropriate liquidity. In order to design the concrete mix according to the engineering requirement, the characteristics of the aggregate material must be mastered first. The properties of aggregates are determined by factors such as microstructure, prior exposure and processing, and these factors influence the properties of fresh and hardened concrete. The effect of aggregate properties on concrete performance should be considered, and the quality of concrete mixing equipment should be considered. Before installation, check the appearance quality of the equipment again, the platform bolts are not loose, the welding seam is not cracked, the oil leak, the water, the ash (the lump), etc. Clean the assembly of the whole machine and re-spray paint, rust and renovate. Prepare the all kinds of bolts, welding wire, iron plate, etc., to prepare tools and protective equipment, the use of more tools for several sets of parts can use pneumatic wrench, and provide timely acetylene cutting, electric welding equipment; Plan the entry time of the crane.
Q:What is the daily routine of the concrete mixing station?
Concrete mixing station is made by mixing console, materials weighing system, material conveying system, material storage system, control system of five systems and other ancillary facilities of building materials manufacturing equipment, the main principle of work is with cement as cementing material, mixing materials such as sandstone, limestone, coal cinder stirring, finally made into concrete, as the wall materials into construction operation.
Q:The mixing time of the concrete mixer is in which standard
Sales missed you do this to see how. If you have any project is continuous uninterrupted production, 24 hours a day, 365 days. As long as there is live, not to stop, of course, is to rest. Want to shift work
Q:What are the ingredients for the concrete mixing stations?
Start with the glue: cement, coal ash, mineral powder, and various expansions! Sand: natural sand, mineral sand, fine sand; Stone: 5-10, 5-20 water reducer! And tap water
Q:Cement warehouse introduction, storage reserves?
There's nothing to come, but warm and young About 200 tons

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range